ST9301-CS060502 THE C I T Y o F COPPELL May 2, 2006 Mr Robert CaudIll, VP Tiseo Pavmg Company PO Box 270040 MesqUIte, TX 75150 RE East Sandy Lake Road Project #ST 93-01 Dear Robert. The purpose of thIS letter IS to direct you to stop the placement of the embankment process on the referenced project untIl the demolItIOn and clearmg of ROW IS complete and debrIS IS hauled from the sIte. ThiS work shall be done m accordance wIth Pay Items #1, #2, #3, #4, #5, #7, Addenda No 1, Item # 1 and N CTCOG Items 3 1 and 3 7 There are eXIstmg storm dram pIpes to be removed that are covered wIth fill materIal, damaged newly-mstalled storm dram pIpe that IS covered wIth fill materIal, eXIstmg asphalt pavmg that IS covered wIth fill materIal, debrIS that was pushed from the embankment that IS now covered and materIal that was rejected for use as embankment that has smce been mcorporated mto the filled sectIOn. AddItIOnally, all valves, manholes, etc must be located, cleaned and adjusted. ThIS wIll reqUIre coordmatmg wIth the cItIes of Dallas, Irvmg & Coppell to msure that all these facIlItIes are located and adjusted accordmg to the reqUIrements of each City I have been trymg to get these thmgs accomplished smce the fill operatIOn began on the eastbound lanes wIth no success We have now gone as far as we can go until each of these Items has been addressed. Your prompt attentIon to these matters IS greatly apprecIated. Smcerely, uJ Campbell, Sr ConstructIOn Inspector Office 972/304-3685 Fax 972/304-3570 255 PARKvVAy' * POBOX 9478 * COPPELL T)\. 75019 * TEL 972/4E2 0022 * FAX 972/304 3673