Amberpoint BP 2R-LR0603111f~rr~con
WATER INJECTION OBSERVATION Consuftinp Engineers&Scientists
6901 Carpenter Fnvy Suite #100
Dallas, Texas 75247
(214)630-1010
Date of Service 03/11/06
Client No 50854
Client: Transwestern Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Location
Procedure
Pass No
Building Pad No 6
Report No 94051418 0267
Project No 94051418
Project: AmberPomt Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
General Contractor Rogers-O'Brien
Injector: Jowell
On this date, a Terracon technician observed the m~ection of water at this site During the
m~ection process, the following observations were recorded.
9th No of Probes
4 Probe Length 10 feet
OBSERVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
In~echon pressure 50 to 200 psi at manifold. X
Injection downward >n 18 inch intervals X
Total depth of m~echon was 10 feet. X
Spacing of m~ect>;on was 5 feet maximum. X
In~ectton to refusal at each location. X
Comments See attached sketch
Field Results Report To
Technician T Mitchell
Report Distribution.
(1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co
(1) City of Coppell TX (1 }O'Brien & Assoc
(1) City of Coppell TX (1) TechniStructures
Hussein H. Abusaad, P E.
Senior Project Manager
99pdr This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon.
WATER INJECTION OBSERVATION SKETCH lt~rracon
Consultinp Enpineers 8 Scientists
8901 Carpenter Fnvy Suite #100
Dallas, Texas 75247
(214)630-1010
Date of Service 03/11/06
Client No X0854
Client. Transwestern Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Report No 94051418 0267
Project No 94051418
Project: AmberPomt Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Not to Scale
170'
420'
N
W E
S