Loading...
Amberpoint BP 2R-LR0603111f~rr~con WATER INJECTION OBSERVATION Consuftinp Engineers&Scientists 6901 Carpenter Fnvy Suite #100 Dallas, Texas 75247 (214)630-1010 Date of Service 03/11/06 Client No 50854 Client: Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Location Procedure Pass No Building Pad No 6 Report No 94051418 0267 Project No 94051418 Project: AmberPomt Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX General Contractor Rogers-O'Brien Injector: Jowell On this date, a Terracon technician observed the m~ection of water at this site During the m~ection process, the following observations were recorded. 9th No of Probes 4 Probe Length 10 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X In~echon pressure 50 to 200 psi at manifold. X Injection downward >n 18 inch intervals X Total depth of m~echon was 10 feet. X Spacing of m~ect>;on was 5 feet maximum. X In~ectton to refusal at each location. X Comments See attached sketch Field Results Report To Technician T Mitchell Report Distribution. (1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co (1) City of Coppell TX (1 }O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Hussein H. Abusaad, P E. Senior Project Manager 99pdr This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon. WATER INJECTION OBSERVATION SKETCH lt~rracon Consultinp Enpineers 8 Scientists 8901 Carpenter Fnvy Suite #100 Dallas, Texas 75247 (214)630-1010 Date of Service 03/11/06 Client No X0854 Client. Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No 94051418 0267 Project No 94051418 Project: AmberPomt Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Not to Scale 170' 420' N W E S