Loading...
SS9901-LR060112k T\ �Lexas CMT Inca Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352 -6972 www.texascmt.com GENERAL REP Report gate January 1 2, 2006 Test Date December 22, 2005 C Dent Cit" of Coppell General Report No 1 Project DeForest Lift Station Project No 205 - 0126 Identification Coating Observations A coating observation was performed today at the above noted project with results as follows A High voltage holiday test (Section 09902, Para 3 05 A 2) 1 The high voltage holiday detector observation was performed with a Spy Model 925, Serial # 1024 gage Voltage was set at 9 500 volts Pinhole holidays found were marked , ,N ith black Marks -A -Lot. More holdays were found near the floor elevation and up about 4' then anywhere else All holidays found were marked. B Bond Strength (Section 09902, para 3 05 A 3) 1 Adhesion test dollies were glued in place on 12 -22 -05 using Loctite glue 2 Dollies were scribed around to substrate and then pulled with an Elcometer 0 -1000 PSI gage Results as follows Location Dolly # PSI Failure Mode Material Applied a Ceilmg 1 425 80% Coating Cohesion/ 12/16/2005 20 Concrete Cohesion b North Wall 2 325 100% Coating Cohesion 12/16/2005 c South Wall 3 400 50% Coating Cohesion/ 12/17/2005 50% Concrete Cohesion d East Wall 5 325 70% Coating Cohesion/ 12/17/2005 30% Glue Failure d West Wall 4 600 80% Coating Cohesion/ 12/17/2005 20% Glue Failure cc Mr RickODcll - City ofCoppell Mr 'Dodd C ii0n'- Canfcr Construction Co. MS Erika K. Cooper- Turner Collie & Braden t,u Li ua dmtn�In ¢�� r.whu. t. u� ticdu this — n tt d-d.ud.1 ,11n1x ap—h—d ahom the 1.11 upp, —.] 4 1 .... CM] I- Inui, I.. a �,�„ twmu appu cW. uur lcttu. aml tui.�land / and ar. i,d—t— ,flhc qp-1 — ,rappur—lk