RE: First Assembly of God Church, Block 1, Lot 1
(Living Hope Church, 200 Heartz Road)
Fee Assessment Letter
Dear Mr Ardt:
Sincerely,
1
Charlene La Matti
Graduate Engineer
E.I.T
T H E C 1 T Y 0 F
COPPELL
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
The fees for water and sewer taps, water meters, and utility inspection fees need to be paid check at the
new Public Works Service Center, 816 S Coppell Road. Meters will be ordered when those fees are paid.
Please provide a copy of the Engineer's estimate or contract to our office so the 2% 4% construction
inspection fee can be verified. The construction inspection fees must be paid at the Engineering
Department prior to the scheduled pre construction meeting.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project If you have any questions, please contact me at 972 -304-
3681
cc Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
Debbie Ingram, Administrative Secretary, Water Billing
Debra Banks, CenterlineUtilities, via fax (214) 391 -4297
255 PARKWAY P 0 BOX 9478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673
May 4, 2006
DEVELOPMENT FEE TABLE
Project: First Assembly of God Church, Block 1, Lot 1
Date: 5/4/2006
TOTAL
FEES DUE
AMOUNT DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
(100% due at Issuance of Building Permit)
$1,503 00
Water Tap Inspection Fee
(100% due at Issuance of Water Meter)
$50 00
Water Meter Fee (Domestic)
(100% due at Issuance of Water Meter)
$0.00
Water Meter Fee (Irrigation/Firelme)
(100% due at Issuance of Water Meter)
$62 74
Water Meter Deposit (Domestic)
(100% due at Issuance of Water Meter)
$0 00
Irrigation/Firelme Meter Deposit
(100% due at Issuance of Water Meter)
$30 00
Wastewater Impact Fee
(100% due at Issuance of Building Permit)
$0 00
Wastewater Tap Inspection Fee
(100% due at Issuance of Building Permit)
$0 00
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
$0 00
Park Fee
(100% due prior to Filing Plat)
$0 00
$0 00
Roadway Impact Fee
(100% due prior to Filing Plat)
$0 00
$0 00
Street Light Fee
(100% due prior to Acceptance of Project)
Information not Available
Street Sign Fee
(100% due prior to Acceptance of Project)
Information not Available
I
Construction Inspection Fee
(100% due prior to Start of Construction)
Information not Available
TOTAL
$1,645 74
$0 00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
DEVELOPMENT FEE TABLE
Project: First Assembly of God Church, Block 1, Lot 1
Date: 5/4/2006
DEVELOPMENT FEE WORKSHEET
PROJECT: First Assembly of God Church, Block 1, Lot 1
DATE: 5/4/2006
Water Impact Fee:
Domestic Meter(s): 0 0 ESU's
Irrigation Meter(s): 1 1 inch 1 67 ESU's
0 0 ESU's
Fireline Meter(s): 0 0 ESU's
Total 1 67 ESU's $900 00 ea. $1,503.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total it 1 Connections $50 00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total 0 Domestic Meter(s) $0 00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation /Fireline Water Meter Fee:
Total 1 Irrigation Meter(s)
Total 0 Additional Irrigation Meter(s)
Total 0 Fireline Meter(s)
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total 0 Meter(s) $30 00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 1 Meter(s) $30 00 ea.
(100% due prior to issuance of water meters)
Wastewater Tap Inspection Fee:
Total 0 Connections $50 00 ea
(100% due prior to issuance of building permit)
(100% due prior to issuance of building permit)
Page 1
$62 74
$0 00
$0 00
$50 00
$0 00
$62.74
$0 00
$0 00
$0 00
$30 00
Wastewater Impact Fee:
Total Domestic Meters ESU's. 0 $900 00 ea $0 00
(Due prior to issuance of building permit)
$0 00
Utility Final Inspection Fee (All developments):
Total 0 Lots $50 00 ea. $0 00