Loading...
First Assembly-CS060504Mr Phillip Ardt fax (972) 393 -16 o RE: First Assembly of God Church, Block 1, Lot 1 (Living Hope Church, 200 Heartz Road) Fee Assessment Letter Dear Mr Ardt: Sincerely, 1 Charlene La Matti Graduate Engineer E.I.T T H E C 1 T Y 0 F COPPELL Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. The fees for water and sewer taps, water meters, and utility inspection fees need to be paid check at the new Public Works Service Center, 816 S Coppell Road. Meters will be ordered when those fees are paid. Please provide a copy of the Engineer's estimate or contract to our office so the 2% 4% construction inspection fee can be verified. The construction inspection fees must be paid at the Engineering Department prior to the scheduled pre construction meeting. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project If you have any questions, please contact me at 972 -304- 3681 cc Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation Debbie Ingram, Administrative Secretary, Water Billing Debra Banks, CenterlineUtilities, via fax (214) 391 -4297 255 PARKWAY P 0 BOX 9478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673 May 4, 2006 DEVELOPMENT FEE TABLE Project: First Assembly of God Church, Block 1, Lot 1 Date: 5/4/2006 TOTAL FEES DUE AMOUNT DUE PRIOR TO FILING PLAT Water Impact Fee (100% due at Issuance of Building Permit) $1,503 00 Water Tap Inspection Fee (100% due at Issuance of Water Meter) $50 00 Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) $0.00 Water Meter Fee (Irrigation/Firelme) (100% due at Issuance of Water Meter) $62 74 Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) $0 00 Irrigation/Firelme Meter Deposit (100% due at Issuance of Water Meter) $30 00 Wastewater Impact Fee (100% due at Issuance of Building Permit) $0 00 Wastewater Tap Inspection Fee (100% due at Issuance of Building Permit) $0 00 Utility Final Inspection Fee (100% due at Issuance of Building Permit) $0 00 Park Fee (100% due prior to Filing Plat) $0 00 $0 00 Roadway Impact Fee (100% due prior to Filing Plat) $0 00 $0 00 Street Light Fee (100% due prior to Acceptance of Project) Information not Available Street Sign Fee (100% due prior to Acceptance of Project) Information not Available I Construction Inspection Fee (100% due prior to Start of Construction) Information not Available TOTAL $1,645 74 $0 00 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT DEVELOPMENT FEE TABLE Project: First Assembly of God Church, Block 1, Lot 1 Date: 5/4/2006 DEVELOPMENT FEE WORKSHEET PROJECT: First Assembly of God Church, Block 1, Lot 1 DATE: 5/4/2006 Water Impact Fee: Domestic Meter(s): 0 0 ESU's Irrigation Meter(s): 1 1 inch 1 67 ESU's 0 0 ESU's Fireline Meter(s): 0 0 ESU's Total 1 67 ESU's $900 00 ea. $1,503.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total it 1 Connections $50 00 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0 Domestic Meter(s) $0 00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation /Fireline Water Meter Fee: Total 1 Irrigation Meter(s) Total 0 Additional Irrigation Meter(s) Total 0 Fireline Meter(s) (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 0 Meter(s) $30 00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 1 Meter(s) $30 00 ea. (100% due prior to issuance of water meters) Wastewater Tap Inspection Fee: Total 0 Connections $50 00 ea (100% due prior to issuance of building permit) (100% due prior to issuance of building permit) Page 1 $62 74 $0 00 $0 00 $50 00 $0 00 $62.74 $0 00 $0 00 $0 00 $30 00 Wastewater Impact Fee: Total Domestic Meters ESU's. 0 $900 00 ea $0 00 (Due prior to issuance of building permit) $0 00 Utility Final Inspection Fee (All developments): Total 0 Lots $50 00 ea. $0 00