Loading...
DR0601-CS060503T H E C I T Y O F COFFELL 4� A S � May 3, 2006 Mr Gary Dry Lawrence Engineering 12500 Schroeder, Suite B Dallas, Texas 75243 RE MacArthur Boulevard /Cribbs Drive DR 06 -01 Construction Materials Testing Dear Mr Dry Enclosed please find a set of construction plans and specifications for the above referenced project. The project consists of the installation of approximately 168 linear feet of 18 -inch slotted drain, one 2 -grate inlet and approximately 50 linear feet of 18 -inch RCP Bids will be opened on May 4, 2006 Please submit a proposal with an estimate of the type and number of construction materials tests required for the project based on the plans and specifications, and the city's standards. Section 5, Description of Pay Items, in the specifications provides detail on the scope of the work involved in each pay item Standard construction details can be found on the city's website (www ci coppell.tx.us) The contractor is responsible for payment of materials testing done before 8 00 a.m and after 5 p.m., and for any re- testing. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise Sincerely, Suzan C Taylor C LP Coordinator Engineering Department Direct 972 - 304 -7019 Fax. 972-304-3570 E -mail staylor@ci.coppell.tx.us Attachments 2 5. PA F N W AY * PO EJO X 94 * C O PPE LL T K 750 1 5 * TEL 972 F 1 0022 * FAX 9�2 304 36 1