Loading...
TexasBank 2R-CS051027Oct 27 05 02:23p MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To Rick O'Dell Construction Inspector Engineering From Terry Gaona, Streets Division Public Works _ Date October 27, 2005 RE Walk -thru Creme de a Creme 1 Check and level all joints with sealant. 2 Install Right Turn Only at north entrance p.2 CITY OFCOPPELL PUBLIC WORKS DEPARTMENT