BEI Properties-LR060118Concrete Compression Test Report
J~ • 1 ENGINEERING, INC.
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993
Client: Cooper General Contractors
Project: Bloom Retail Center
CMJ Report No. 502-5167-012
Report Date 01/18/2006
Report Distribution (1) Cooper General Contractors
(1) Ray Mansoory
(1) City of Coppell
Strength 3000 psi @ 28 Days Placement Date 01/06/2006
Slump 3 in min 5 in max Sampled By Richard Jones
Air Content n/a Weather Clear/Light Wind
Concrete Temperature 55° F min 90° F max Supplier/Mix Bea11/330H1521
Ambient Temperature n/a Air Content Method ASTM C231
1=ie1d Ctat~ Se€ 1
Ticket Number 89050856 Time Batched: 09.17 Time Sampled: 09:55
Slump 4.5 in Air Content: 1 0 % Unit Weight: NIA
Concrete Temperature: 58° F Ambient Temperature: 55° F Yardage (c.y ): 10 of 120
Placement Location: Slab, Entire Slab
Sample Location: From SE Corner of Slab, 5' N, 5' W
Concrete Compression Test Results
Cylinder Age Max Load Area
i
I
f Stren th Fracture
i T
n.)
orce) (sq.
Set # # Test Date (days) (
bs. (ps
ype
01 BRC01060601 01/13/2006 7 104920 28.27 3710 C-cone/shear
01 BRC01060602 02/03/2006 28
01 BRC01060603 02/03/2006 28
01 BRC01060604 Hold
Normal cylinder size: 6" x 12"
Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231
10 Gallons of Water Added On-Site, approved by' Gus w/Cooper
CMJ Engineering, Inc
LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results
do not pertain to any other samples, items or areas regardless of similarity Our reports are produced solely for the exclusive use of our
client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.
01 Page 1 of 2
Concrete Compression Test Report
~~~ ENGINEERING, INC
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax; (817) 589-9993
Client: Cooper General Contractors
Project: Bloom Retail Center
Report Distribution (1) Cooper General Contractors
(1) Ray Mansoory
{1) City of Coppell
CMJ Report No.. 502-5167-012
Report Date• 01/18/2006
Specifications Test Data
Strength 3000 psi @ 28 Days Placement Date 01/06/2006
Slump 3 in min 5 in max Sampled By Richard Jones
Air Content n/a Weather Clear/Light Wind
Concrete Temperature 55° F min 90° F max Supplier/Mix Beall/330H1521
Ambient Temperature n/a Air Content Method ASTM C231
Field'Data Set #02
Ticket Number 89050873 Time Batched: 11.39 Time Sampled: 12:30
Slump• 5 in Air Content: 1.0 % Unit Weight: NA
Concrete Temperature: 62° F Ambient Temperature: 58° F Yardage (c.y ): 110 of 110
Placement Location Slab, Entire Slab
Sample Location: From NW Corner, 10' S & 5' E
Concrete Compression Test Results
Set # Cylinder
#
Test Date Age Max Load Area
(days) (Ibs. force) (sq.in.) Stren th
(psi
02 BRC01060605 01/13/2006 7 118980 28.27 4210
02 BRC01060606 02/03/2006 28
02 BRC01060607 02/03/2006 28
02 BRC01060608 Hold
Normal cylinder size: 6" x 12"
Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231
10 Gallons of Water Added On-Site, approved by• Gus w/Cooper
CMJ Engineering, Inc
CMT Manager
Fracture
Type
B-cone/split
LIMITATIONS' The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results
do not pertain to any other samples, items or areas regardless of similarity Our reports are produced solely for the exclusive use of our
client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.
"" Page 2 of 2