BEI Properties-CS060508May 8, 2006
Gus San Roman
Cooper General Contractors
972-245-7970
RE BEI Properties, Lot 1 Block A
Final Walk-thru
Dear Gus
Please be advised that awalk-through has been scheduled for Tuesday, May 9, 2006 at 9 00 a m
for water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
ca11972-304-7090 at your earliest convenience
Sincerely,
{ /
Rick O'Deil
Construction Inspector
Office Phone (972) 304-7090
Fax. (972) 304-3570
cc Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Tim Oates, Interim Fire Chief