Loading...
BEI Properties-CS060508May 8, 2006 Gus San Roman Cooper General Contractors 972-245-7970 RE BEI Properties, Lot 1 Block A Final Walk-thru Dear Gus Please be advised that awalk-through has been scheduled for Tuesday, May 9, 2006 at 9 00 a m for water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please ca11972-304-7090 at your earliest convenience Sincerely, { / Rick O'Deil Construction Inspector Office Phone (972) 304-7090 Fax. (972) 304-3570 cc Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Tim Oates, Interim Fire Chief