Loading...
Gateway BP(1.6)-CS060509T H E C I T Y O F C_OPPELL ~ S ~ May 9, 2006 Patrick L. Acker, P E Halff Associates, Inc 8616 Northwest Plaza Drrve Dallas, TX 75225 Post-it® Fax Note 7671 Date S O(A pa°ges~ 2 To From ChG.Y~GVIL-~l A. IYIk- Co./Dept. s ~ Co. CI,~' 0 F CO ~°/ Phone # Phone # Z_ D~1-3~8 Fax # 214 - - 00 Fax # RE: Gateway Business Park/Lot 3B, Block 2 Early Grading Plan Review Comments Dear Mr Acker• The City of Coppell has reviewed the referenced plans and has the following comments to offer 1 The title on the cover sheet should indicate that the set of plans >s for early grading only 2 Please modify the Sheet Index to reflect only the sheets that are part of this set. 3 Remove the Plan Approval Paragraph for City Engineer The engineering department will provide an approval stamp at the time the plans are approved. 4 Silt fencing shall be wire backed and use steel posts. Please remove references to other materials from the details. 5 Provide documentation from the owner of the borrow site indicating their approval of the proposed removal of soil from their property 6 Provide a copy of the NOI to this office Ensure the protection of the borrow site m addition to the main site, is addressed m the SWPPP The SWPPP should be available on-site for review Once these changes have been made, please submit three sets of revised final construction plans for the City Engineer's stamp and as many copies as necessary for your contractors' construction operations. All contractors and subcontractors onstte must have a copy of the plans stamped and approved by the City of Coppell All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all dirt work. A check for inspection fees made to Crty of Coppell should be submitted to this office along with a copy of the contract(s) with the appropriate 2% calculations shown for verification purposes. If you have any questions, please contact me at your convenience <s= F~r~rwvr * F u r~ox 4a~[~ ,t ~n~FEU~ 7x ~sui~ ,t AEU sa7z aE ~ -o', * rex G~z~,oa se~.~ Please be advised that the detailed engineering review process is an iterative process and two or more iterations can be expected. Although the City would not object to issuing an Early Grading Permit once the minimum requirements are met, consider the possibility of a time delay between the completion of grading work and the issuance of the Construction Development Permit. Sincerely, Charlene La Ma na, E.I T Graduate Engineer Office Phone (972) 304-3681 Fax. (972) 304-3570