ST9905DR-CS040315~ Suzan Taylor - COE Info Bethel Road Channel Improvements
From• <ccbond@transystems com>
To <Imokry@apaienv com>
Date Mon, Mar 15, 2004 6 13 PM
Subject: COE Info Bethel Road Channel Improvements
Loretta,
Attached are PDFs of the Plan & Profile Sheets and Typical Cross-Sections for the proposed channel
improvements Also attached is a word document with a table of the fill quantities. I did not realize the City
was going to provide you with awrite-upon construction methodology; what you read to me over the
phone sounded good I've gone ahead and included the construction methodology write-up I drafted, there
may be something you can use Please call if you need additional information or need any of the exhibits
modified Thanks
Craig
«COE Channel Means & Methods doc» «COE Quantities doc» «0890-3d-details New Channel
Details (1) pdf» «0890-3d-details New Channel Details (2) pdf» «0890-3d-details New Channel
Details (3) pdf» «Channel P & P CORE (1) pdf» «Channel P & P CORE (2) pdf» «Channel P &
P CORE (3) pdf» «Channel P & P CORE (4) pdf» «Channel P & P CORE (5) pdf» «Channel P &
P CORE (6) pdf» «Channel P & P CORE (7) pdf» «Channel P & P CORE (8) pdf»
Craig Bond
TranSystems Consultant Corporation
3010 LBJ Freeway, Suite 990
Dallas, Texas 75234
Ph 972-280-9300 x 225
Fax 972-280-9715
CC <staylor@ci.coppell tx us>, <atees@apaienv com>
p,
A, ~'
Page 1
~ _~-