Loading...
ST9905DR-CS040315~ Suzan Taylor - COE Info Bethel Road Channel Improvements From• <ccbond@transystems com> To <Imokry@apaienv com> Date Mon, Mar 15, 2004 6 13 PM Subject: COE Info Bethel Road Channel Improvements Loretta, Attached are PDFs of the Plan & Profile Sheets and Typical Cross-Sections for the proposed channel improvements Also attached is a word document with a table of the fill quantities. I did not realize the City was going to provide you with awrite-upon construction methodology; what you read to me over the phone sounded good I've gone ahead and included the construction methodology write-up I drafted, there may be something you can use Please call if you need additional information or need any of the exhibits modified Thanks Craig «COE Channel Means & Methods doc» «COE Quantities doc» «0890-3d-details New Channel Details (1) pdf» «0890-3d-details New Channel Details (2) pdf» «0890-3d-details New Channel Details (3) pdf» «Channel P & P CORE (1) pdf» «Channel P & P CORE (2) pdf» «Channel P & P CORE (3) pdf» «Channel P & P CORE (4) pdf» «Channel P & P CORE (5) pdf» «Channel P & P CORE (6) pdf» «Channel P & P CORE (7) pdf» «Channel P & P CORE (8) pdf» Craig Bond TranSystems Consultant Corporation 3010 LBJ Freeway, Suite 990 Dallas, Texas 75234 Ph 972-280-9300 x 225 Fax 972-280-9715 CC <staylor@ci.coppell tx us>, <atees@apaienv com> p, A, ~' Page 1 ~ _~-