Loading...
WA9701-CS060510� Suzan Taylor - Re 16 -inch Water Line From: "Doug Showers" <DShowers @BHCLLP COM> To <staylor @ci. coppell. tx. us> Date: 5/10/2006 2.56 55 PM Subject: Re 16 -inch Water Line DART is asking the City to place the City of Coppell Standard Water Line Utility Marker at each side of the DART ROW Not the DART marker Doug >>> "Suzan Taylor" <staylor @ci.coppell tx.us> 5/10/2006 2 53 12 PM >>> Do you think that we need a set of the DART utility standard drawings or do you think that the written requirements explain it well enough? >>> "Doug Showers" <DShowers @BHCLLP COM> 5/10/2006 2 46 PM >>> Suzan, Pay item #33 states that the contractor shall "fabricate, procure and install 2 Utility Markers (one at each end) at each end of the proposed waterline as it crosses the DART ROW Each marker shall be 12x12 aluminum fastened to a metal post embedded in concrete The marker shall meet both City and DART requirements Section 6 9 'Utility Markers' of the DART standards outlines the requirements. 6 9 UTILITY MARKERS Markers as shown in the utilities standard drawings shall be used to indicate the location of below -grade utilities installations whether belonging to DART, private utilities companies, or local governments 6 9 1 Location Markers shall be placed at the centerline of the facility being marked Lines beginning or ending within the DART right -of -way shall be marked at their ends Lines crossing DART right -of -way shall be marked at a point near the edge of the subballast shoulder Track underdrains shall be marked at changes in direction and at outflows Markers are not required for underdrains extending along bases or tops of retaining walls Markers, when required, shall be placed on retaining walls in retained sections. Where a marker location, as prescribed above, results in a conflict with other underground facilities, the marker shall be placed away from the trackbed at a point near the right -of -way line Utility markers are not required, however, for storm drains crossing under the DART trackway when the storm drains can be readily located by trackside catch basins, manholes, or headwalls, or when the storm drains are so deep that they will not be affected by trackway work. The section designer shall indicate the location of utility markers on project plan drawings and shall prepare a schedule of utility markers for facilities in their Page 1 Suzan Taylor - Re 16-inch Line Page 21 project, defining the legend for each marker The schedule shall be on a project drawing 6 9.2 Description Utilities markers shall consist of a metal target plate mounted vertically on a formed metal post and shall be furnished and installed by the contractor The front face of the target plate shall be marked as indicated on utilities standard drawings, with the station number, a symbol identifying the type of facility, and the utilities owner Markers located near the edge of the subballast shoulder shall be oriented so that the front face faces away from the tracks. Markers located away from the trackbed shall be oriented so that the front face faces the tracks. So the contractor is responsible for all materials, labor and installation The city of Coppell standard water line utility sign should be installed I hope that this helps clarify this situation Sincerely, Douglas K. Showers, P E Birkhoff, Hendricks & Conway, L.L.P 7502 Greenville Ave, #220 Dallas, Texas 75231 Phone (214) 361 -7900 Fax: (214) 361 -0204 >>> "Suzan Taylor" <staylor @ci.coppell.tx.us> 5/8/2006 4 08 17 PM >>> Doug The water line utility markers that go on either side of the DART ROW is the contractor supposed to supply those or are they something that I would need to ask the utilities department to supply Rick wants to know what they are supposed to look like Thanks Suzan