Loading...
WA9701-CS060308 (2)Suzan Taylor - DTR crossing at DART 6�, .F � 1: - b AL A From: "Doug Showers" <DShowers @BHCLLP COM> To: <staylor @ci coppell.tx.us> Date: 3/8/2006 5.2008 PM Subject: DTR crossing at DART Suzan, Copy to Rick O'Dell by fax Our survey crew visited the site this morning Based on the location that Skaggs potholed to discover the Explorer Pipe Line, we find the top of pipe at Elevation 501 84 The flow line of the 24" Storm line at Sta 27 +93 is estimated to be Elev 509 0 which allows for approximately 7 feet difference More critical is the top of the 48" storm at Sta 27 +19 Our best estimate is approximately Elev 504 which allows for approximately 5 feet of difference Using 24 inch casing the cover over and under the proposed water line will be less than 18- inches. Although this is not 'problematic, it does require a sensitive boring operation. We trust that this information is helpful to the City with respect to the field change of the bore elevation where it crosses the DART ROW Sincerely, Douglas K. Showers, P E. Birkhoff, Hendricks & Conway, L.L.P 7502 Greenville Ave., #220 Dallas, Texas 75231 Phone (214) 361 -7900 Fax: (214) 361 -0204 Pa ge 1 N �, ql -o� CC: <kmarvin @ci coppell.tx.us> LL ■■■■■��iii► iiiii DI ; _10MMMOM g �..�� r��■■ ■.. L oom N ■ ■1■■■Ili It ■�JI■■ .1410 , EMMEMENINVA&M TOR ■ On, ME mrsm SIVEMEME1 EMEM 110m,will IM 1§ OEM ■I ME _MlE ■1_1 M�mmlw bi rl El ON, NPRIES ill - 1MEN ■0 EMEMI"Efill MEN ■■■■i■■■ll 4 momilmool ISO LL