Loading...
ST0004(2006)-CS040429�' c Cj✓ D �/ MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, Director of Engineering & Public Works From: Larry Davis, Construction Inspector Date: April 29, 2004 RE: Freeport Parkway from Bethel Road to Dividend Drive Possible NB & SB Lanes Pavement and Brick Paver Repair I made contact with Will Haggard of Pavement Services and arranged to meet with him next Tuesday, May 4 at 10:00 a.m. to verify and dimension the pavement and brick paver failures along this stretch of roadway. I have previously observed the Streets Division making various repairs in this section of roadway. To curtail confusion between their work activity and these proposed repairs, would it be possible to have a Streets maintenance crew identify and mark all of their proposed work locations prior to Tuesday's meeting? Part of my observation today was, in my opinion, the bulk of the deflections in the existing pavement would be well - served to be repaired by utilizing hydraulic lift (i.e. URATEK) process. I will get back to you with more information after my meeting with Pavement Services. kj "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"