Loading...
DR0501-SP060424 (4)M SUBMITTAL COVER SHEET Project: Contract # Section Submittal # Wagon Wheel Park Outfall Structure Project Q- 0306 -02 005 To. _Larry Davis Date. Construction Inspector 255 Parkway Coppell, Texas 75019 4!24/2006 Division. # 200 Quantity Remarks Description: Man -Hole Cover & Accessories 5 r I� I Man -Hole Cover & Accessories rr 5 /Of �r M 0 p ^�•,< F.J." .'..�- < ..F��.� �- r i ii- -- C- m # 380 -24 P LID 175 lbs. RING 205 lbs. Water -tight Manhole SET 380 lbs. TECHNICAL DATA BULLETIN BUTYL=NEK Preformed Plastic Joint Sealant for Pipe, Box, Vaults, Manholes 4 TEST REQUIRED Chemical Composition METHOD 1 68-29 Hydrocarbon. 9' by t ASTM D 50-70 64.86 55.0 51 Inert Mineral Filler, % by weight HTO T111 30.50 30.02 33.45 45.0 35 Volatile Matter, % by weight ASTM D 6-80 2.0 Max. 169 1.69 0.0 1.2 Physical Properties* Spec gravity, (a) 77F. ASTM D 71-84 1.2 -1.35 1.3343 1.3319 1.29 1.25 Ductility at 77F cm ATM D 113-85 5,0 min. 6.0 6.0 5.0 10 Softening Point R1nq & Ball 77F ASTM D 36-86 320 min. 325 325 -- Penetration, Cone, @ 77 F, ASTM D 217 -82 50 -120 86 75 70 55-60 150 q, 5 sec. in 0.1 mm Flash Point, Cleveland Open Cup, F ASTM D 92-85 600 min. 615 620 600 450 Fire Point Cleveland Op@n u F ASTM D 92-85 625 min. 635 635 625 475 Compression Test 77 F Ibf /in' ASTM C 972 100 max. N/A 100 Compression Test @ 32 F lbf /in' ASTM D 972 200 max. N/A 198 ----- -- Sag or Flow Resistance Sag or flow resistance, in vertical position FS SS- S -210A No sagging No visible No visible — — for 5 days @ 135 F sect 4.5.3/ASTM changes changes C 990 Chemical Resistance 30 days immersion @ room temperature In FS SS-S -2120A each of the following: sect 3.6/ASTM C 990 5% Solution of Caustic Potash No visible Deterioration 5° Solution of HvdrochWc Acid No visible Deterloration - Complies ComDlies ies 57 Suffuric Acid No visible Deter Comolies Comblies Saturated Hydrogen Sulfide Solution No visible Deterioration Complies Complies Complex C-Vnes 1 BUTYL -NEK meets or exceeds the c' 'mac requirements of of Federal Spec!& req Specrf} ;rf�� lunirrtr I � cation SS- 5- 210(210A), AASHTO M -1986, and ASTM C -990-91 z � P aswoaUUn CAFTR Ass ° For additional information, literature or to place an order please call (800)239 -4549 GASKET VOLUME MEASUREMENTS 1.25" 1.25" 15.0 ' 1 50" 188 22.5 1 75" 3.00 360 2." 3.50 42.0 3 x 2 34 1.50" 8 x 7 97 2.0" 3 x 3 3.9 1.50" 54 8 x 8 10.2 2.0" 4 x 2 41 1.50" 5.0 9 x 5 9.2 2.0" 4 x 3 47 1 50" 1 75" 9 x 6 98 2.0" 4 x 4 5.3 1 50" 27 9 x 7 104 2.0" 5 x 2 48 1 75" 2.5 9 x 8 10.9 2.0" 5 x 3 54 1 75" 150" 9 x 9 11.5 2.0" 5 x 4 59 1 75" 10 x 5 9.9 2.0" 5 x 5 6.5 1 75" 102 10 x 6 10.5 2.0" 6 x 3 61 1 75" 90 10 x 7 11 1 2.0" 6 x 4 67 1 75" 2" 10 x 8 11 7 2.0" 6 x 5 7.2 1 75" 10 x 9 12.2 2.0" 6 x 6 7.8 175" 10 x 10 12.8 2.0" 7 x 4 68 1 75" 12 x 6 11.9 2.0" 7 x 5 79 1 75" 12 x 7 12.5 2.0" 7 x 6 85 1 75" 12 x 8 131 2.0" 7 x 7 91 1 75" 12 x 9 137 2.0" 8 x 4 79 2.00" 12 x 10 14.2 2.0" 8 x 5 85 2.00" 12 x 11 14.8 2.0" 8 x 6 91 2.00" 12 x 12 154 2.0" 12 15 In 51 4.3 175" 15 1 8 1. 54 4.5 1 75" 18 2.1 1. 60 5.0 1 75 21 2.5 1 66 5.5 1 75" 24 2.0 1.25" 72 6.0 2" 27 2.2 1.25 78 6.5 2" 30 2.5 1.25" 84 70 2" 33 2.7 150" 90 7.5 2" 36 3.0 150" 96 8.0 2" 39 3.3 150" 102 8.5 2" 42 3.5 1 50" 108 90 2" 45 37 1 50" 120 10.2 2" CALL (800)231 -4549 TO PLACE AN ORDER OR REQUEST ADDITIONAL INFORMATION Nilson Contractor 5eit wims LLC 107 Bell Sane 3 Dentin, Temm 7630 (940) 243 -1174 PH (940) 898-1173 FX LETTER OF TRANSMITTAL DATE: April 20, 2006 RE: Ring & Cover Project: Wagon Wheel Park Outfall Structure Drainage Project DR 05-01 City of Coppell, Texas To Whom It May Concern, It is the intent of this letter to propose to the parties involved a critical path of construction of the above mentioned project in regards to the water tight ring and Cover. Upon preparing the purchase orders for this project it has come to light that atop flan hol d mn d(111r:n� nd cy st item I am being told by manufacturers that a cast can be made and this ring and cover cast for a costly fee, but more importantly with an extremely long lead time (6 to 8 weeks). We are proposing as an alternative to use the standard "Storm Sewer" bolt down ring and cover (the cut sheet included). By using 3/8" x 3-3/4 "stainless steel wedge anchor bolts we can secure the ring to the pre -cast top slab. Then we will form up the 6" needed to flush mount the ring & cover for the full length / width of the top slab, dowel in 8" No. 4 bar 24" OC 4" into the top slab the remaining 4" to be embedded into the new concrete (5000 PSI). We will incorporate the attached rebar certification as stipulated in the plan documents. #5 bent bars with #3 spiral ties at 6" pitch with the two flat turns at top and bottom of both piers. The steel will tied into the steel for the headwall ( #4 rebar) Please contact me with any questions or concerns. My email address is aamw ilson.contrra A erizon.net . Sincerely, , Date Anthony Martinez — VP, WCS Confidential Page 1 of 1 4/20/2006