Loading...
Amberpoint BP 2R-LR060508CONCRETE COMPRESSIVE STRENGTH TEST Re ort Number 94051418 0374 Samp/e Information Date Cast. April 27, 2006 Time 6.25am Sampled by' Jose A. Martinez Weather Conditions Clear Accumulative Yards 20/ Placement Method Direct Discharge Sample Locations Sketch Sample No 1 Placement Location Pavement, N of Building 4, refer to attached sketch Service Date April 27, 2006 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214} 630-1010 Client Report Date May 08, 2006 Transwestern Commercial Services Project: AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No 94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 5 57am Plant. 2 Supplier Potter Concrete Truck No 112 Ticket No 101547 Mix I D No 7752 Water Added Onsite Before Test 10 Gallons Water Added Onsite After Test 0 Gallons Field Test Data Test Slump, inches Air Content, Concrete Temperature, of Ambient Temperature,~F Plastic Unit Weight, pcf Result 5 00 56 74 51 144 8 ~aboratory Test Data Set Specimen Diameter Area No ID (inches) (sq. inches) 1 1 6 00 28 27 2 6 00 28 27 3 4 Specification 3-5 3-6 l~~rracon Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 05/04/2006 7 123,250 4,360 05/04/2006 7 121,090 4,280 Average (7 Days) 4,320 05/25/2006 28 05/25/2006 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 1 of 3 °'-`°R"'°'-F°'°'e"aY CONCRETE COMPRESSIVE STRENGTH TEST R rt N b 94051418 0374 l~err~con epo um er Service Date Aril 27, 2006 8901 Carpenter Fnvy, Ste #t 0o P Dallas, Texas 75247 (214)630-1010 Client Report Date May 08, 2006 Transwestern Commercial Services Project: AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No • 94051418 Material Information Sample Information Specified Strength 3600 psi @ 28 Days Date Cast. April 27, 2006 Time 8 08am Sampled by Jose A. Martinez Batch Time 7 40am Plant. 2 Weather Conditions Clear Supplier Potter Concrete Accumulative Yards 170/ Truck No 109 Ticket No 101562 Placement Method Direct Discharge Mix I D No 7752 Sample Locations Sketch Sample no 2 Water Added Onsite Before Test. 5 Gallons Placement Location Pavement, N of Building 4, refer to attached sketch Field Test Data Test Result Specification Test Method Slump, inches 5 00 3-5 ASTM C143 Air Content, % 5 3 3-6 ASTM C231 Concrete Temperature, ~F 78 ASTM C1064 Ambient Temperature,~F 62 ASTM C1064 Plastic Unit Weight, pcf~ 145 6 ASTM C138 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength • No ID (inches) (sq inches) Tested (days) {Ibs) {ps 2 1 6 00 28 27 05/04/2006 7 96,360 ,410 2 2 6 DO 28 27 05/04/2006 7 103,480 3,6 Average (7 Days) 3,540 2 3 05/25/2006 28 2 4 05/25/2006 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 3 °' Powa°,-F~°'e "a" CONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0374 l~~rracon Service Date April 27, 2006 8901 Carpenter Frwy, ste #100 Dallas, Texas 75247 (214) 630-1010 Client Report Date May 08, 2006 Transwestern Commercial Services Project: AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No 94051418 Material Jnformafion Sample Information Specified Strength 3600 psi @ 28 Days Date Cast April 27, 2006 Time 9 35am Sampled by' Jose A. Martinez Batch Time 9 11 am Plant. 2 Weather Conditions Clear Supplier Potter Concrete Accumulative Yards 310/ Truck No 127 Ticket No 101576 Placement Method Direct Discharge Mix I D No 7752 Sample Locations Sketch Sample No 3 Placement Location Pavement, N of Building 4, refer to attached Water Added Onsite After Test. 5 Gallons sketch Field Test Data Test Result Specification Test Method Slump, inches 4 75 3-5 ASTM C143 Air Content, % 6 0 3-6 ASTM C231 Concrete Temperature, °F 76 ASTM C1064 Ambient Temperature,°F 73 ASTM C1064 Plastic Unit Weight, pcf• 144 0 ASTM C138 Lakorafory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No ID (inches) (sq inches) Tested {days) (Ibs) (psi) 3 1 6 00 28.27 05/04/2006 7 115,770 , 3 2 6 00 28.27 05/04/2006 7 103,960 Average (7 Days) 3,890 3 3 05/25/2006 28 3 4 05/25/2006 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples Terracon Rep Jose A. Martinez Report Distribution (1) Transwestern Commercial Services (1) TechniStructures (1) City of Coppell TX (1) Rogers O'Brien Construction Co Reviewed by' (1) City of Coppell TX (1) O'Brien 8 Assoc Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 3 0'-PDR/ROt-Future Kay PROJECT.~y er ~o ~ IJ I ~ A~ l e ! "~,7" o ~p PROJECT NO. l [~~1~~~'037 r ~rr~con Consulting Engineers & Scientists _, ~~ C •~ ~ 6~ P ~~ exrsTi"Jv9 Pau,a~q CONCRETE COMPRESSIVE STRENGTH TEST N b 94051418 0342 l~~rracon Report um er Service Date Aril 6, 2006 8901 Carpenter Frwy, Ste #100 p Dallas, Texas 75247 (214)630-1010 Client: Report Date May 08, 2006 Transwestern Commercial Services Project AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No :94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 3 57am Plant. 2 Supplier Potter Concrete Truck No 101 Ticket No 101159 Mix I D No 7752 Water Added Onsite Before Test. 0 Gallons Water Added Onsite After Test 0 Gallons Sample Information Date Cast. April 6, 2006 Time 4 16am Sampled by Barry Cuble Weather Conditions Cloudy, warm, windy Accumulative Yards 30/600 Placement Method Direct Discharge Sample Locations 30' E of W, 15' N of S Placement Location Pavement, Fire Lane & Parking, N of Building #4, See attached sketch Field Tesf Dafa Test Result Specification Test Method Slump, inches 4 50 4-5 ASTM C143 Air Content, % 5.2 4-8 ASTM C231 Concrete Temperature, ~F 86 ASTM C1064 Ambient Temperature,~F 70 ASTM C1064 Plastic Unit Weight, pcf~ 142 8 ASTM C138 Laboratory Test Data Age at Maximum C ompressive Set Specimen Diameter Area Date Test Load Strength No ID {inches) (sq inches) Tested (days) {Ibs) (psi) 1 1 6 00 28.27 04/13/2006 7 112,370 3,970 1 2 6 00 28.27 04/13/2006 7 113,780 4,020 Average (7 Days) 4,000 1 3 6 00 28.27 05/04/2006 28 146,300 5,170 1 4 6 00 28.27 05!04/2006 28 149,390 5,280 Average (28 Days) 5,230 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 1 of 4 °'-"`5~°,-FN°'e"e° CONCRETE COMPRESSIVE STRENGTH TEST • 94051418 0342 l~~rracon Report Number ssoi car enter F Service Date April 6, 2006 p rwy, ste#~oo Dallas, Texas 75247 (214) 63D-1010 Client: Report Date May 08, 2006 Transwestern Commercial Services Project: AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No 94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 5 30am Plant 2 Supplier Potter Concrete Truck No 114 Ticket No 101174 Mix I D No 7752 Water Added Onsite Before Test. 10Gallons Water Added Onsite After Test 0 Gallons Field Test Data Test Result Slump, inches 5 50 Air Content, % 5 5 Concrete Temperature, °F 85 Ambient Temperature,°F 68 Plastic Unit Weight, pcf~ 142 4 Sample Information Date Cast: April 6, 2006 Time 6 02am Sampled by' Barry Cuble Weather Conditions Cloudy, mild, windy Accumulative Yards 180/600 Placement Method Direct Discharge Sample Locations 85' E of W, 25' N of S Placement Location Pavement, Fire Lane & Parking, N of Building #4, See attached sketch Specification 4-5 4-8 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 * =Field Test Results do not meet project specifications. Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No ID (inches) (sq inches) Tested (days) (Ibs) (psi) 2 1 6 00 28.27 04/13/2006 7 105,320 3,720 2 2 6 00 28 27 04/13/2006 7 101,710 3,600 Average (7 Days) 3,660 2 3 6 00 28.27 05/04/2006 28 133,010 4,700 2 4 6 00 28.27 05/04/2006 28 137,010 4,850 Average (28 Days) 4,780 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 2 of 4 0, ncs~ao,-FU~,a KaY CONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0342 Service Date April 6, 2006 l~~rracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Report Date May 08, 2006 Transwestern Commercial Services Project: AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No • 94051418 Material lnformation Specified Strength 3600 psi @ 28 Days Batch Time 7 06am Plant. 2 Supplier Potter Concrete Truck No 101 Ticket No 101189 Mix I D No 7752 Water Added Onsite Before Test. OGallons Water Added Onsite After Test. 0 Gallons Field Test Data Test Result Slump, inches 5 00 Air Content, % 6 2 Concrete Temperature, ~F 84 Ambient Temperature,~F 68 Plastic Unit Weight, pcf~ 142 4 Laboratory Test Data Set Specimen Diameter Area No ID (inches) (sq. inches) 3 1 6 00 28.27 3 2 6 OD 28.27 3 3 6 DO 28.27 3 4 6 00 28 27 Sample Information Date Cast. April 6, 2006 Time 7 30am Sampled by' Barry Cuble Weather Conditions Cloudy, mild, windy Accumulative Yards 3301500 Placement Method Direct Discharge Sample Locations 35' S of N, 165' W of E Placement Location Pavement, Fire Lane & Parking, N of Building #4, See attached sketch Specification 4-5 4-8 Test Method H5 1 NI 0:14.5 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 04/13/2006 7 107,560 3,800 04/13/2006 7 97,140 3,440 Averag e (7 Days) 3,620 05/04/2006 28 121,210 4,290 05/04/2006 28 126,350 4,470 Average (28 Days) 4,380 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 4 °'_"`S'R°'-`~°'e"av CONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0342 Service Date April 6, 2006 l~~rracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 {214} 630-1010 Client: Report Date May 08, 2006 Transwestern Commercial Services Project• AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No : 94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 8 52am Plant. 2 Supplier Potter Concrete Truck No 102 Ticket No 101203 Mix I D No 7752 Water Added Onsite Before Test. 10Gallons Water Added Onsite After Test. 0 Gallons Field Test Data Test Slump, inches Air Content, Concrete Temperature, °F Ambient Temperature,°F Plastic Unit Weight, pcf~ Result 5 50 63 84 70 141 6 Sample Information Date Cast April 6, 2006 Time 9 17am Sampled by' Barry Cuble Weather Conditions. Partly sunny, warm, windy Accumulative Yards 470/600 Placement Method Direct Discharge Sample Locations 10' S of N, 85' W of E Placement Location Pavement, Fire Lane & Parking, N of Building #4, See attached sketch Specification Test Method 4-5 ASTM C143 4-8 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 * =Field Test Results do not meet project specifications. Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No ID (inches) (sq. inches) Tested (days) (Ibs) (psi) 4 1 6 00 28.27 04/13/2006 7 92,170 3,260 4 2 6 DO 28.27 04/13/2006 7 92,950 3,290 Average (7 Days) 3,280 4 3 6 00 28 27 05/04/2006 28 123,200 4,360 4 4 6 00 28 27 05/04/2006 28 126,160 4,460 Average (28 Days) 4,410 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples Terracon Rep Barry Cuble Report Distribution (1) Transwestern Commercial Services (1) TechniStructures (1) City of Coppell TX (1) Rogers O'Brien Consfruction Co Reviewed by' (1) City of Coppell TX (1) O'Brien & Assoc Hussein H. Abusaad, P E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the locations} referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 4 of 4 o,-ncsm°,-F~~,a "aY