Denton Tap 3A-CS060515May 15, 2006
Ken Head
Head Construction Inc
3030 LBJ Frwy, Ste 700
Dallas, TX 75234
RE: Denton Tap Development, Lot 3 Block A (Coppell Montessori Academy)
Final Acceptance Pending
To Whom It May Concern
The City of Coppell Engineering Department has provided construction inspection services to
the referenced project since it was permitted on December 13, 2005 All necessary inspections
have been performed at the site during the course of construction of public facilities, which
included water, sewer, drainage, fire line and paving structures There are several more
inspections to be done on the project before final acceptance will be granted for the infrastructure
portion of the development.
If you should have .ns or need additional information, please advise
Sincere
0 y D.
nstructio Inspector
!ffice 972 -304 -3684
Fax 972 304 -3570