Loading...
ST0004(2006)-CS060511ADVANCED -" PAV AIG CO3, PROFESSIONALS IN PAVING CONSTRUCTION & REPAIRS May 11, 2006 The City of Coppell Attn Keith R. Marvin, P E Assistant City Engineer 255 Parkway Coppell, TX 75019 Dear Keith lFa§ -rr4--' Per our telephone conversation last week, you agreed to grant Advanced Paving Company an extension on the timeframe to complete the repairs on Freeport Parkway As you know, the city decided to change the scope of work from installing plant mix CTB to installing flex base This saved the city 50 per square foot on the job, or $20,000 00, allowing you to do more repairs to the street, as the repair areas have grown from your initial estimate As a result of this change, the flex base installation is taking considerably longer to reach the proper densities than the CTB, therefore, I requested an extension of 2 - 3 weeks on the job in order to allow us to properly complete the project. You agreed to allow this extension as long as we were continually working at the site and making process You said you've been very pleased with our diligence in completing the project to date, and as a result, did not think it would not be a problem in granting this extension I appreciate your cooperation regarding this matter, and we will do everything possible to fulfill our contract with the City of Coppell to your utmost satisfaction If you have aly ques ions, please let me know Sincerely Sam Garrett Owner /bs 2257 Joe Field Rd. - Dallas, Texas 75229 - Dallas (972) 245 -0000 - Fax (972) 247 -2011 - Ft N%rth (817) 921 -5642 Toll Free (877) 853 -1333 advancedpavingco.com