Loading...
CF-TownC CHC-CS 851210 , . I'" O f' ~ r> \ \ \985 RECE\VE >I '- v ~ TEXAS POWER & LIGHT COMPANY P.O. Box 819061 * Dallas, Texas 75381-9061 * 214-247-0175 December 10, 1985 Mr. Wayne Ginn 16135 Preston Road Suite 106 Dallas, Tx 75248 Mr. Ginn: As you have requested, we will install underground distribution facilities rather than standard overhead distribution lines to provide electric service to the Coppell Town Centre located on Parkway Boulevard in Coppell, Texas. We will provide underground service for no charge. This quote is based on the terrain being brought to final grade before our cable work begins, on no rock trenching being involved, and on the underground circuits being installed under streets, alleys, drives, and other paved areas prior to the paving work. This quote is subject to an additional charge of $32.50 per foot if done after that time, unless we receive at least 60 days advance notice and said premises are available to us during all said 60 days. Further, it is your responsibility to install underground service cable to the secondary terminal of our transformer. The underground service cables shall be limited to six (6), the maximum number for which our transformer is designed to connect. You will provide and install a concrete transformer pad and 1 - 4 inch PVC schedule 40 conduit from that pad to our designated pole. All work done will be based on Texas Power & Light specifications. You will be responsible for any and all damage to Texas Power & Light facilities during construction of your building. This project will provide you with 277/480, three phase service. Texas Power & Light Co. will install a temporary overhead distribution line from the east property line of the Town Centre tract to a permanent overhead line located along the east property line of Univest's Parks of Coppell tract. The City of Coppell will be responsible for costs involved in removing this temporary line. This quote will not apply to any change in the original plans as submitted, and cannot be guaranteed later than . . I""- ~ March 6, 1986. If not accepted by then, a new appraisal will be required, based on labor and material costs which may then prevail. If this meets your understanding and approval, please indicate your acceptance by signing in the space provided below, and returning the signed copy to us. We will not begin work until this letter is signed and returned. d~~~ Tim Brancheau Energy Services APPROVED: John Weinberg Assistant District Manager ACCEPTED: City of Coppell By__________________________ Title Date