Loading...
WA9701-CS060522T H E C 1 T Y O F MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Keith Marvin, Assistant City Engineer Glenn Hollowell, Asst. Director of Public Works Tim Oates, Deputy Fire Chief From: Rick O'Dell, Construction Inspector �D Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 Date: May 22, 2006 RE: WALK -THRU for WA 97 -01 Belt Line / Denton Tap 16" Waterline A final walk -thru is scheduled for the referenced project on Wednesday, Ma�24 at 9:00 a.m. Please meet at the intersection of Bethel Rd. and Denton Tap to begin the inspection. Let me know if I can be of further assistance. cc: Utilities Dept. Streets Dept. Parks Dept. Doug Showers, P.E., Birkhoff, Hendricks & Conway "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"