Loading...
Vista Ridge 1&2-CS060518Mai 19 06 09:54a T H E C 1 Y Y O F COPPELL MEMORANDUM TO: Larry Davis, Engineering FROM: Danny Hightower, Public Works DATE: May 18, 2006 REF: The Plaza, Lots 1 and 2 (Vista Ridge Addition) 1 No locks onFDC 2 Missing blue street marker buttons for FH 3 First FH leaking 4 3" around vault for drainage 5 Mark address on FDC's per Fire Dept. 6, IM TUa "Wy Ott ,re r #xk B ow .9 z%a S p.1