TR9701-SY 980218 (3)Irving and Coppell
Belt Line Road / Denton Tap Road
Performed for -
Dallas County City of Coppell City of Irving
February 18, 1998
Sverdrup
Appendix C
Coordinatability Analysis
Coordinatability Analysis Using Current Cycle Lengths- March 18, 1997
Link: Denton Tap Road, Parkway Boulevard to Sandy Lake Road
•uii
Travel Time (s)
40
Travel Time okay For Coordination
CF1
53
Travel Time okay For Coordination
Traffic / Storage Space
017
Storage Space is adequate
CF2
17
Storage Space is adequate
Proportion of Traffic In Platoon
083
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
3083
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
150
at Parkway Boulevard
Cycle Length
65
at Sandy Lake Road
Combined Cycle Length
150
at Bethel School Road
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
69
Coordination probably recommended
Link: Denton Tap Road, Sandy Lake Road to Bethel School Road
Variable
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
041
Storage Space is adequate
CF2
41
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
4008
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Sandy Lake Road
Cycle Length
150
at Bethel School Road
Combined Cycle Length
150
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
65
Coordination probably recommended
Synchro 3 Report C \SYNCHRO3 \DATA\PROJECT \013776 \AMPEAK \OOI.SY5
, Sverdrup Page I
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Denton Tap Road, Bethel School Road to Bethel Road
Variable
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
039
Storage Space is adequate
CF2
39
Proportion of Traffic In Platoon
078
Traffic moderately platooned
Ap, platoon adjustment
-2
Main Street Volume (vph)
4776
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at Bethel School Road
Cycle Length
100
at Bethel Road
Combined Cycle Length
150
Cycle Length Increase
50
Large increase in cycle length
Ac, Cycle Adjustment
-25
CF, Coordinatability Factor
50
Coordination probably not recommended
Link: Denton Tap Road, Bethel Road to Belt Line Road
Variabl
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
0.22
Storage Space is adequate
CF2
22
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
4028
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Bethel Road
Cycle Length
75
at Belt Line Road
Combined Cycle Length
100
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
67
Coordination probably recommended
Synchro 3 Report C \SYNCHRO3\ DATA \PROJECT\013776\AMPEAK \OOLSY5
Sverdrup Page 2
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Southwestern Boulevard to Airline Drive
1 •uu - i -
Travel Time (s)
23
Travel Time okay For Coordination
CF1
75
Traffic / Storage Space
036
Storage Space is adequate
CF2
36
Proportion of Traffic In Platoon
082
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
4172
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Southwestern Boulevard
Cycle Length
70
at Airline Drive
Combined Cycle Length
75
Cycle Length Increase
5
Large increase in cycle length
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
93
Coordination definitely recommended
Link: Belt Line Road, Airline Drive to Wrangler Drive
Value Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
094
Traffic exceeds 80% of storage, coordination needed
CF2
94
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
4318
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Airline Drive
Cycle Length
130
at Wrangler Drive
Combined Cycle Length
130
Cycle Length Increase
60
Large increase in cycle length
Ac, Cycle Adjustment
-30
CF, Coordinatability Factor
86
Coordination definitely recommended
Synchro 3 Report C \ SYNCHRO3IDATA IPROJECT10137761AMPEAK1001 SY5
Sverdrup Page 3
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Wrangler Drive to Lakeshore Drive
Variable
Value
Comments
Travel Time (s)
26
Travel Time okay For Coordination
CF1
71
Traffic / Storage Space
022
Storage Space is adequate
CF2
22
Proportion of Traffic In Platoon
073
Traffic moderately platooned
Ap, platoon adjustment
-5
Main Street Volume (vph)
4439
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
130
at Wrangler Drive
Cycle Length
40
at Lakeshore Drive
Combined Cycle Length
130
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
74
Coordination definitely recommended
Link: Belt Line Road, Lakeshore Drive to IH 635 WBFR
Variabl
Value
Comments
Travel Time (s)
59
Travel Time okay For Coordination
CF1
28
Traffic / Storage Space
012
Storage Space is adequate
CF2
12
Proportion of Traffic In Platoon
072
Traffic moderately platooned
Ap, platoon adjustment
-5
Main Street Volume (vph)
3817
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
40
at Lakeshore Drive
Cycle Length
65
at IH 635 WBFR
Combined Cycle Length
65
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
31
Coordination probably not recommended
Synchro 3 Report C ISYNCHRO3I DATA IPROJECT\013776\AMPEAK1001.SY5
Sverdrup Page 4
Page
Coordinatability Analysis Using Current Cycle Lengths: March 18, 1997
Link: Belt Line Road, 11-11635 WBFR to IH 635 EBFR
Variable
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
2.10
Traffic exceeds 80% of storage, coordination needed
CF2
100
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
4748
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at IH 635 WBFR
Cycle Length
150
at IH 635 EBFR
Combined Cycle Length
150
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
120
Coordination definitely recommended
Link: Belt Line Road, 11-11635 EBFR to Regent Boulevard
Variable
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
1 19
Traffic exceeds 80% of storage, coordination needed
CF2
100
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
3863
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at IH 635 EBFR
Cycle Length
150
at Regent Boulevard
Combined Cycle Length
150
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
127
Coordination definitely recommended
Synchro 3 Report C 1SYNCHR031DATA \PROJECT1013776\AMPEAK 1001 SY5
, Sverdrup Page 5
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Regent Boulevard to Royal Lane
Variable
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Proportion of Traffic In Platoon
093
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Main Street Volume (vph)
3541
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at Regent Boulevard
Cycle Length
65
at Royal Lane
Combined Cycle Length
150
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
67
Coordination probably recommended
Link: Belt Line Road, Royal Lane to SH 114 WBFR
Variable
Value
Comments
Travel Time (s)
35
Travel Time okay For Coordination
CF1
59
Traffic / Storage Space
045
Storage Space is adequate
CF2
45
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
4017
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Royal Lane
Cycle Length
150
at SH 114 WBFR
Combined Cycle Length
150
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
79
Coordination definitely recommended
Synchro 3 Report C , SYNC HRO3\ DATATROJECT \013776\AM PEA K \OOI.SY5
, Sverdrup Page 6
Coordinatability Analysis Using Current Cycle L engths.
March 18, 1997
Link: Belt Line Road, SH 114 WBFR to SH 114 EBFR
11=— - If
Travel Time (s)
9
Travel Time okay For Coordination
CF1
93
Traffic / Storage Space
2.08
Traffic exceeds 80% of storage, coordination needed
CF2
100
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
4824
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at SH 114 WBFR
Cycle Length
150
at SH 114 EBFR
Combined Cycle Length
150
Cycle Length Increase
0
Large increase in cycle length
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
123
Coordination definitely recommended
Link: Belt Line Road, SH 114 EBFR to Valley View Lane
Variable
Travel Time (s)
88
Travel Time too far for coordination
CF1
0
Traffic / Storage Space
008
Storage Space is adequate
CF2
8
Proportion of Traffic In Platoon
081
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
3301
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at SH 114 EBFR
Cycle Length
100
at Valley View Lane
Combined Cycle Length
150
Cycle Length Increase
50
Large increase in cycle length
Ac, Cycle Adjustment
-25
CF, Coordinatability Factor
3
Coordination definitely not recommended
Synchro 3 Report C \SYNCHRO3\ DATA \PROJECT OI3776\AMPEAK \00 LSY5
Sverdrup Page 7
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, Valley View Lane to SH 161 WBFR
Variable
Value
Comments
Travel Time (s)
53
Travel Time okay For Coordination
CF 1
36
Storage Space is adequate
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Traffic heavily platooned, coordination is appropriate
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
High Volumes, coordination is high priority
Main Street Volume (vph)
3149
High Volumes, coordination is high priority
Av, volume adjustment
20
at SH 161 WBFR
Cycle Length
100
at Valley View Lane
Cycle Length
50
at SH 161 WBFR
Combined Cycle Length
100
Cycle Length Increase
0
Ac, Cycle Adjustment
0
Coordination definitely recommended
CF, Coordinatability Factor
61
Coordination probably recommended
Link: Belt Line Road, SH 161 WBFR to SH 161 EBFR
Variable
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
063
Storage Space is adequate
CF2
63
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3431
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
50
at SH 161 WBFR
Cycle Length
130
at SH 161 EBFR
Combined Cycle Length
130
Cycle Length Increase
15
Ac, Cycle Adjustment
-7
CF, Coordinatability Factor
103
Coordination definitely recommended
Synchro 3 Report C \ SYNCHRO3 ,DATA\PROJECT�013776\AMPEAK \001 SY5
Sverdrup Page 8
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, SH 161 EBFR to Story Road
Variabie
Value
Comments
Travel Time (s)
36
Travel Time okay For Coordination
CF1
58
Traffic / Storage Space
039
Storage Space is adequate
CF2
39
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3565
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
130
at SH 161 EBFR
Cycle Length
150
at Story Road
Combined Cycle Length
150
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
73
Coordination definitely recommended
Link: Belt Line Road, Story Road to Walnut Hill Lane
Va riabl e
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
032
Storage Space is adequate
CF2
32
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3314
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at Story Road
Cycle Length
65
at Walnut Hill Lane
Combined Cycle Length
150
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
66
Coordination probably recommended
Synchro 3 Report C \ SYNCHRO3. DATA\PROJECT \013776\AMPEAK \OOLSY5
, Sverdrup Page 9
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Walnut Hill Lane to Country Club Road
Variable
Travel Time (s)
Value
32
Comments
Travel Time okay For Coordination
CF1
63
Travel Time okay For Coordination
Traffic / Storage Space
015
Storage Space is adequate
CF2
15
Storage Space is adequate
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
2930
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
65
at Walnut Hill Lane
Cycle Length
65
at Country Club Road
Combined Cycle Length
65
at Northgate Drive
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
85
Coordination definitely recommended
Link: Belt Line Road, Country Club Road to Northgate Drive
Variabl
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
0.22
Storage Space is adequate
CF2
22
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3007
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Country Club Road
Cycle Length
65
at Northgate Drive
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
95
Coordination definitely recommended
Synchro 3 Report C 1SYNCHRO3IDATA PROJECT\013776�AMPEAK1001.SY5
, Sverdrup Page 10
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Northgate Drive to Finley Road
Variable
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
015
Storage Space is adequate
CF2
15
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3204
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Northgate Drive
Cycle Length
100
at Finley Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
57
Coordination probably recommended
Link: Belt Line Road, Finley Road to Rochelle Road
Variable
Valu
Comments
Travel Time (s)
25
Travel Time okay For Coordination
CF1
72
Traffic / Storage Space
033
Storage Space is adequate
CF2
33
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
3425
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Finley Road
Cycle Length
46
at Rochelle Road
Combined Cycle Length
100
Cycle Length Increase
4
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
97
Coordination definitely recommended
Synchro 3 Report C \SYNCHRO3 \DATA PROJECT\013776\AMPEAK \001.SY5
, Sverdrup Page 1 1
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Rochelle Road to Strait Street
Variable
Value
Comments
Travel Time (s)
18
Travel Time okay For Coordination
CF1
82
Storage Space is adequate
Traffic / Storage Space
023
Storage Space is adequate
CF2
23
Traffic heavily platooned, coordination is appropriate
Proportion of Traffic In Platoon
096
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
8
High Volumes, coordination is high priority
Main Street Volume (vph)
3126
High Volumes, coordination is high priority
Av, volume adjustment
20
at Strait Street
Cycle Length
46
at Rochelle Road
Cycle Length
50
at Strait Street
Combined Cycle Length
50
Cycle Length Increase
4
Ac, Cycle Adjustment
-2
Coordination definitely recommended
CF, Coordinatability Factor
108
Coordination definitely recommended
Link: Belt Line Road, Strait Street to Grande Bulevar
V=. . f
Travel Time (s)
10
Travel Time okay For Coordination
CF1
92
Traffic / Storage Space
054
Storage Space is adequate
CF2
54
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
3049
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
50
at Strait Street
Cycle Length
46
at Grande Bulevar
Combined Cycle Length
50
Cycle Length Increase
4
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
117
Coordination definitely recommended
Synchro 3 Report C \SYNCHRO3\ DATA \PROJECT\013776\AMPEAK \OO1.SY5
Sverdrup Page 12
Coordinatability Analysis Using Current Cycle Lengths:
March 18, 1997
Link: Belt Line Road, Grande Bulevar to Irving Mall Entrance
Variable
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Travel Time okay For Coordination
Traffic / Storage Space
061
Storage Space is adequate
CF2
61
Storage Space is adequate
Proportion of Traffic In Platoon
094
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
3280
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
46
at Grande Bulevar
Cycle Length
150
at Irving Mall Entrance
Combined Cycle Length
150
at SH 183 WBFR
Cycle Length Increase
29
Moderate increase in cycle length
Ac, Cycle Adjustment
-14
Moderate increase in cycle length
CF, Coordinatability Factor
93
Coordination definitely recommended
Link: Belt Line Road, Irving Mall Entrance to SH 183 WBFR
Variable
Value
Comments
Travel Time (s)
15
Travel Time okay For Coordination
CF1
86
Traffic / Storage Space
0.22
Storage Space is adequate
CF2
22
Proportion of Traffic In Platoon
098
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
9
Main Street Volume (vph)
1302
High Volumes, coordination is high priority
Av, volume adjustment
11
Cycle Length
150
at Irving Mall Entrance
Cycle Length
50
at SH 183 WBFR
Combined Cycle Length
150
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
94
Coordination definitely recommended
Synchro 3 Report CA SYNCHRO3 \DATATROJECT\013776\AMPEAK\00I SY5
Sverdrup Page 13
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, SH 183 WBFR to Irving Boulevard
Variable Value Comments
Travel Time (s) 27 Travel Time okay For Coordination
CF1 70
Traffic / Storage Space 0.20 Storage Space is adequate
CF2 20
Proportion of Traffic In Platoon
092
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Main Street Volume (vph)
2690
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
50
at SH 183 WBFR
Cycle Length
100
at Irving Boulevard
Combined Cycle Length
100
High Volumes, coordination is high priority
Cycle Length Increase
0
Ac, Cycle Adjustment
0
at SH 183 EBFR
CF, Coordinatability Factor
96
Coordination definitely recommended
Link: Belt Line Road, SH 183 EBFR to Willow Creek Drive
Variabl
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
098
Traffic exceeds 80% of storage, coordination needed
CF2
98
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
3414
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at SH 183 EBFR
Cycle Length
65
at Willow Creek Drive
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
108
Coordination definitely recommended
Synchro 3 Report C• \SYNCHRO3\ DATA \PROJECT \OOI.SY5
, Sverdrup Page 14
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, Willow Creek Drive to Pioneer Drive
Variabie
Value
Comments
Travel Time (s)
31
Travel Time okay For Coordination
CF1
64
Traffic / Storage Space
0.24
Storage Space is adequate
CF2
24
Proportion of Traffic In Platoon
094
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
3260
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Willow Creek Drive
Cycle Length
65
at Pioneer Drive
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
91
Coordination definitely recommended
Link: Belt Line Road, Pioneer Drive to Conflans Road
Va riabl e
Value
Comments
Travel Time (s)
47
Travel Time okay For Coordination
CF1
43
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Proportion of Traffic In Platoon
084
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
3309
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Pioneer Drive
Cycle Length
150
at Conflans Road
Combined Cycle Length
150
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
59
Coordination probably recommended
Synchro 3 Report C \SYNCHRO3` DATATROJECT\0137761AMPEAK\00I SYS
, Sverdrup Page 15
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Conflans Road to Rock Island Road
Variable
Value
Comments
Travel Time (s)
44
Travel Time okay For Coordination
CF1
47
Traffic / Storage Space
033
Storage Space is adequate
CF2
33
Proportion of Traffic In Platoon
077
Traffic moderately platooned
Ap, platoon adjustment
-3
Main Street Volume (vph)
3186
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at Conflans Road
Cycle Length
150
at Rock Island Road
Combined Cycle Length
150
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
64
Coordination probably recommended
Link: Belt Line Road, Rock Island Road to Shady Grove Road
Variabl
Value
Comments
Travel Time (s)
74
Travel Time okay For Coordination
CF1
8
Traffic / Storage Space
0.20
Storage Space is adequate
CF2
20
Proportion of Traffic In Platoon
079
Traffic moderately platooned
Ap, platoon adjustment
-1
Main Street Volume (vph)
3184
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at Rock Island Road
Cycle Length
150
at Shady Grove Road
Combined Cycle Length
150
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
39
Coordination probably not recommended
Synchro 3 Report C SYNCHRO3 IDATAIPROJECT10137761AMPEAK1001 SY5
, Sverdrup Page 16
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Shady Grove Road to Oakdale Road
Va
Value
Comments
Travel Time (s)
65
Travel Time okay For Coordination
CF1
20
Traffic / Storage Space
018
Storage Space is adequate
CF2
18
Proportion of Traffic In Platoon
084
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
2740
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
150
at Shady Grove Road
Cycle Length
65
at Oakdale Road
Combined Cycle Length
150
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
36
Coordination probably not recommended
Synchro 3 Report C ', SYNCHR031 DAT.. A\PROJECT10I3776\AMPEAK1001.SY5
Sverdrup Page 17
Coordinatability Analysis Using Current Cycle Le ngths
March 18, 1997
Link: Denton Tap Road, Parkway Boulevard to Sandy Lake Road
Variable
Value
Comments
Travel Time (s)
40
Travel Time okay For Coordination
CF1
53
Traffic / Storage Space
006
Storage Space is adequate
CF2
6
Proportion of Traffic In Platoon
078
Traffic moderately platooned
Ap, platoon adjustment
-2
Main Street Volume (vph)
1514
High Volumes, coordination is high priority
Av, volume adjustment
13
Cycle Length
85
at Parkway Boulevard
Cycle Length
85
at Sandy Lake Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
64
Coordination probably recommended
Link: Denton Tap Road, Sandy Lake Road to Bethel School Road
Variable
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
006
Storage Space is adequate
CF2
6
Proportion of Traffic In Platoon
083
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
1665
High Volumes, coordination is high priority
Av, volume adjustment
15
Cycle Length
85
at Sandy Lake Road
Cycle Length
85
at Bethel School Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
62
Coordination probably recommended
Synchro 3 Report C \SYNCHR03\ DATA\ PROJECT\013776 \NOONPEAK \001.SY5
, Sverdrup Page I
Coordinatability Analysis Using Current Cycle Lengt
March 18, 1997
Link: Denton Tap Road, Bethel School Road to Bethel Road
Variable
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
009
Storage Space is adequate
CF2
9
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
2099
High Volumes, coordination is high priority
Av, volume adjustment
19
Cycle Length
85
at Bethel School Road
Cycle Length
85
at Bethel Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
81
Coordination definitely recommended
Link: Denton Tap Road, Bethel Road to Belt Line Road
Variable
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
009
Storage Space is adequate
CF2
9
Proportion of Traffic In Platoon
096
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
8
Main Street Volume (vph)
1903
High Volumes, coordination is high priority
Av, volume adjustment
17
Cycle Length
85
at Bethel Road
Cycle Length
85
at Belt Line Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
82
Coordination definitely recommended
Synchro 3 Report C SYNC HRO3 \DATA\PROJECT \013776 \NOONPEAK \001.SY5
, Sverdrup Page 2
Coordinatability Analysis Using Current Cycle Lengths: March 18, 1997
Link: Belt Line Road, Southwestern Boulevard to Airline Drive
Variable
Travel Time (s)
Value
23
Comments
Travel Time okay For Coordination
CF1
75
Travel Time okay For Coordination
Traffic / Storage Space
012
Storage Space is adequate
CF2
12
Storage Space is adequate
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
1829
High Volumes, coordination is high priority
Av, volume adjustment
16
High Volumes, coordination is high priority
Cycle Length
85
at Southwestern Boulevard
Cycle Length
85
at Airline Drive
Combined Cycle Length
85
at Wrangler Drive
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
94
Coordination definitely recommended
Link: Belt Line Road, Airline Drive to Wrangler Drive
Variabl
Value
Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
019
Storage Space is adequate
CF2
19
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1922
High Volumes, coordination is high priority
Av, volume adjustment
17
Cycle Length
85
at Airline Drive
Cycle Length
85
at Wrangler Drive
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
104
Coordination definitely recommended
Synchro 3 Report C 1 SYNCHRO3IDATAIPROJECT10137761NOONPEAK \001 SYS
Sverdrup Page 3
Coordinatability Analysis Using Current Cycle Lengths. Marc 18 1 997
Link: Belt Line Road, Wrangler Drive to Lakeshore Drive
Variable
Value
Comments
Travel Time (s)
26
Travel Time okay For Coordination
CF1
71
Traffic I Storage Space
Oil
Storage Space is adequate
CF2
11
Proportion of Traffic In Platoon
1 00
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
10
Main Street Volume (vph)
1801
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
85
at Wrangler Drive
Cycle Length
85
at Lakeshore Drive
Combined Cycle Length
85
Cycle Length Increase
0
Moderate increase in cycle length
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
97
Coordination definitely recommended
Link: Belt Line Road, Lakeshore Drive to 11-1635 WBFR
Variable
Value
Comments
Travel Time (s)
59
Travel Time okay For Coordination
CF1
28
Traffic / Storage Space
005
Storage Space is adequate
CF2
5
Proportion of Traffic In Platoon
099
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
9
Main Street Volume (vph)
1633
High Volumes, coordination is high priority
Av, volume adjustment
14
Cycle Length
85
at Lakeshore Drive
Cycle Length
65
at IH 635 WBFR
Combined Cycle Length
85
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
41
Coordination probably not recommended
Synchro 3 Report C \SYNCHR03\ DATA \PROJECT 0 13 776\NOON PEA K,00 I SY5
Sverdrup Page 4
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, IH 635 WBFR to 11-11635 EBFR
Variable
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
0.24
Storage Space is adequate
CF2
24
Proportion of Traffic In Platoon
094
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1837
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
65
at IH 635 WBFR
Cycle Length
65
at IH 635 EBFR
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
114
Coordination definitely recommended
Link: Belt Line Road, 11-1635 EBFR to Regent Boulevard
Variable
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
026
Storage Space is adequate
CF2
26
Proportion of Traffic In Platoon
093
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Main Street Volume (vph)
1898
High Volumes, coordination is high priority
Av, volume adjustment
17
Cycle Length
65
at IH 635 EBFR
Cycle Length
70
at Regent Boulevard
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
112
Coordination definitely recommended
Synchro 3 Report C \ SYNCHRO3 , DAT'A\PROJECT\013776 \NOONPEAK \001 SY5
Sverdrup Page 5
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Regent Boulevard to Royal Lane
Value Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Travel Time okay For Coordination
Traffic / Storage Space
008
Storage Space is adequate
CF2
8
Storage Space is adequate
Proportion of Traffic In Platoon
093
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
1704
High Volumes, coordination is high priority
Av, volume adjustment
15
High Volumes, coordination is high priority
Cycle Length
70
at Regent Boulevard
Cycle Length
100
at Royal Lane
Combined Cycle Length
100
at SH 114 WBFR
Cycle Length Increase
30
Moderate increase in cycle length
Ac, Cycle Adjustment
-15
CF, Coordinatability Factor
52
Coordination probably recommended
Link: Belt Line Road, Royal Lane to SH 114 WBFR
Va riabi
Value
Comments
Travel Time (s)
35
Travel Time okay For Coordination
CF1
59
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Proportion of Traffic In Platoon
082
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
1996
High Volumes, coordination is high priority
Av, volume adjustment
18
Cycle Length
100
at Royal Lane
Cycle Length
100
at SH 114 WBFR
Combined Cycle Length
100
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
77
Coordination definitely recommended
Synchro 3 Report C 'SYNCHRO3 \DATA\PROJECT 0 13 776 NOONPEAK \00I SY5
, Sverdrup Pace 6
Coordinatability Analysis Using Current Cycle Lengths
March 18, 1997
Link: Belt Line Road, SH 114 WBFR to SH 114 EBFR
Value Comments
Travel Time (s)
9
Travel Time okay For Coordination
CF1
93
Travel Time too far for coordination
Traffic / Storage Space
050
Storage Space is adequate
C F2
50
Storage Space is adequate
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
2344
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
100
at SH 114 WBFR
Cycle Length
65
at SH 114 EBFR
Combined Cycle Length
100
at Valley View Lane
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
Moderate increase in cycle length
CF, Coordinatability Factor
100
Coordination definitely recommended
Link. Belt Line Road, SH 114 EBFR to Valley View Lane
Va riabl e
Value
Comments
Travel Time (s)
88
Travel Time too far for coordination
CF1
0
Traffic / Storage Space
006
Storage Space is adequate
CF2
6
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
2641
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 114 EBFR
Cycle Length
100
at Valley View Lane
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
16
Coordination definitely not recommended
Synchro 3 Report C 'SYNCHR03 PROJECT'\013776 \NOONPEAK \001 SY5
Sverdrup Page 7
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Valley View Lane to SH 161 WBFR
Va
Value
Comments
Travel Time (s)
53
Travel Time okay For Coordination
CF1
36
Storage Space is adequate
Traffic / Storage Space
008
Storage Space is adequate
CF2
8
Traffic heavily platooned, coordination is appropriate
Proportion of Traffic In Platoon
1 00
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
10
High Volumes, coordination is high priority
Main Street Volume (vph)
2337
High Volumes, coordination is high priority
Av, volume adjustment
20
at SH 161 WBFR
Cycle Length
100
at Valley View Lane
Cycle Length
65
at SH 161 WBFR
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
Coordination definitely recommended
CF, Coordinatability Factor
49
Coordination probably not recommended
Link: Belt Line Road, SH 161 WBFR to SH 161 EBFR
Value Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
025
Storage Space is adequate
CF2
25
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
2441
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 161 WBFR
Cycle Length
65
at SH 161 EBFR
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
111
Coordination definitely recommended
Synchro 3 Report C \SYNC HRO3\ DATA \PROJECT1013776 \NOONPEAK \001 SY5
Sverdrup Page 8
Coordinatability Analysis Using Current Cycle Lengths, March 18, 1997
Link: Belt Line Road, SH 161 EBFR to Story Road
Variable
Value
Comments
Travel Time (s)
36
Travel Time okay For Coordination
CF1
58
Traffic / Storage Space
015
Storage Space is adequate
CF2
15
Proportion of Traffic In Platoon
096
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
8
Main Street Volume (vph)
3263
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 161 EBFR
Cycle Length
65
at Story Road
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
86
Coordination definitely recommended
Link: Belt Line Road, Story Road to Walnut Hill Lane
Variable
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
010
Storage Space is adequate
CF2
10
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3231
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Story Road
Cycle Length
70
at Walnut Hill Lane
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
70
Coordination probably recommended
' Report C 'SYNC HRO3\ DATA \PROJECT 013776 \NOONPEAK \001.SY5
Sverdrup Page 9
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Walnut Hill Lane to Country Club Road
Variable
Value
Comments
Travel Time (s)
32
Travel Time okay For Coordination
CF1
63
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Proportion of Traffic In Platoon
081
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
3067
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Walnut Hill Lane
Cycle Length
65
at Country Club Road
Combined Cycle Length
70
Cycle Length Increase
5
Moderate increase in cycle length
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
81
Coordination definitely recommended
Link: Belt Line Road, Country Club Road to Northgate Drive
Variable
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
0.27
Storage Space is adequate
CF2
27
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3107
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Country Club Road
Cycle Length
100
at Northgate Drive
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
78
Coordination definitely recommended
Synchro 3 Report C 1SYNCHRO3 DATAIPROJECT\013776 1NOONPEAK' SY5
, Sverdrup Page 10
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, Northgate Drive to Finley Road
Variable
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
017
Storage Space is adequate
CF2
17
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
3954
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Northgate Drive
Cycle Length
65
at Finley Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
56
Coordination probably recommended
Link: Belt Line Road, Finley Road to Rochelle Road
ariabl
Value
Comments
Travel Time (s)
25
Travel Time okay For Coordination
CF1
72
Traffic / Storage Space
031
Storage Space is adequate
CF2
31
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3883
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Finley Road
Cycle Length
90
at Rochelle Road
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
85
Coordination definitely recommended
Synchro ; Report C 1SYNCHRO3 DATAIPROJECT1013776�NOONPEAK \001 SY5
Sverdrup Page it
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, Rochelle Road to Strait Street
Variable
Value
Comments
Travel Time (s)
18
Travel Time okay For Coordination
CF1
82
Traffic / Storage Space
047
Storage Space is adequate
C F2
47
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
4126
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
90
at Rochelle Road
Cycle Length
65
at Strait Street
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
95
Coordination definitely recommended
Link: Belt Line Road, Strait Street to Grande Bulevar
Variabl
Value
Comments
Travel Time (s)
10
Travel Time okay For Coordination
CF1
92
Traffic / Storage Space
086
Traffic exceeds 80% of storage, coordination needed
CF2
86
Proportion of Traffic In Platoon
080
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
-1
Main Street Volume (vph)
3993
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Strait Street
Cycle Length
75
at Grande Bulevar
Combined Cycle Length
75
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
106
Coordination definitely recommended
Synchro 3 Report C \ SYNCHRO3IDATA `PROJECT\0137761NOONPEAK\00I SY5
, Sverdrup Page 12
Coordinatability Analysis Using Current Cycle Lengths:
March 18, 1997
Link: Belt Line Road, Grande Bulevar to Irving Mall Entrance
Variable
Value
Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
036
Storage Space is adequate
CF2
36
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3784
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Grande Bulevar
Cycle Length
70
at Irving Mall Entrance
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
101
Coordination definitely recommended
Link: Belt Line Road, Irving Mall Entrance to SH 183 WBFR
ri bl
Value
Comments
Travel Time (s)
15
Travel Time okay For Coordination
CF1
86
Traffic / Storage Space
051
Storage Space is adequate
CF2
51
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3852
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Irving Mall Entrance
Cycle Length
60
at SH 183 WBFR
Combined Cycle Length
70
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
103
Coordination definitely recommended
Synchro 3 Report C SYNCHR03 \DATA PROJECT\013776 \NOONPEAK \001 SY5
, Sverdrup Page 13
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, SH 183 WBFR to Irving Boulevard
Variable
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
018
Storage Space is adequate
CF2
18
Proportion of Traffic In Platoon
081
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
3228
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
60
at SH 183 WBFR
Cycle Length
65
at Irving Boulevard
Combined Cycle Length
65
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
88
Coordination definitely recommended
Link: Belt Line Road, SH 183 EBFR to Willow Creek Drive
Variable
Value
Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
044
Storage Space is adequate
CF2
44
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3109
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 183 EBFR
Cycle Length
80
at Willow Creek Drive
Combined Cycle Length
80
Cycle Length Increase
15
Ac, Cycle Adjustment
-7
CF, Coordinatability Factor
103
Coordination definitely recommended
Synchro 3 Report C \SYNCHRO3\ DATA \PROJECT\013776 \NOONPEAK \001 SY5
, Sverdrup Page 14
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Willow Creek Drive to Pioneer Drive
Variable
Travel Time (s)
31
Travel Time okay For Coordination
CF1
64
Travel Time okay For Coordination
Traffic / Storage Space
016
Storage Space is adequate
CF2
16
Storage Space is adequate
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
2844
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
80
at Willow Creek Drive
Cycle Length
75
at Pioneer Drive
Combined Cycle Length
80
at Conflans Road
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
87
Coordination definitely recommended
Link: Belt Line Road, Pioneer Drive to Conflans Road
Vari able
Value
Comments
Travel Time (s)
47
Travel Time okay For Coordination
CF1
43
Traffic / Storage Space
010
Storage Space is adequate
CF2
10
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
2861
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Pioneer Drive
Cycle Length
70
at Conflans Road
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
65
Coordination probably recommended
Synchro 3 Report C ,SYNCH RO3\DATAI PROJECT ',013776 \NOON PEA K \OOI.SY5
Sverdrup Page 15
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, Conflans Road to Rock Island Road
Variable
Travel Time (s)
Value
44
Comments
Travel Time okay For Coordination
CF1
47
Travel Time okay For Coordination
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Storage Space is adequate
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
2443
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
70
at Conflans Road
Cycle Length
90
at Rock Island Road
Combined Cycle Length
90
at Shady Grove Road
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
61
Coordination probably recommended
Link: Belt Line Road, Rock Island Road to Shady Grove Road
Variabl
Value
Comments
Travel Time (s)
74
Travel Time okay For Coordination
CF1
8
Traffic / Storage Space
007
Storage Space is adequate
CF2
7
Proportion of Traffic In Platoon
082
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
2063
High Volumes, coordination is high priority
Av, volume adjustment
19
Cycle Length
90
at Rock Island Road
Cycle Length
100
at Shady Grove Road
Combined Cycle Length
100
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
22
Coordination definitely not recommended
Synchro 3 Report C \SYNCHRO3 \DATA \PROJECT.OI3776 \NOONPEAK OOI SY5
Sverdrup Page 16
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Shady Grove Road to Oakdale Road
Variable
Value
Comments
Travel Time (s)
65
Travel Time okay For Coordination
CF1
20
Traffic / Storage Space
005
Storage Space is adequate
CF2
5
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1763
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
100
at Shady Grove Road
Cycle Length
65
at Oakdale Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
26
Coordination definitely not recommended
Synchro 3 Report C \SYNCHRO3 L)ATA\PROJECP013776\NOONPEAk \001 W5
, Sverdrup Pa -e 17
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Denton Tap Road, Parkway Boulevard to Sandy Lake Road
Variable Value Comments
Travel Time (s) 40 Travel Time okay For Coordination
CF1 53
Traffic / Storage Space 006 Storage Space is adequate
CF2 6
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Travel Time okay For Coordination
Main Street Volume (vph)
1533
High Volumes, coordination is high priority
Av, volume adjustment
13
Storage Space is adequate
Cycle Length
85
at Parkway Boulevard
Cycle Length
85
at Sandy Lake Road
Combined Cycle Length
85
Cycle Length Increase
0
High Volumes, coordination is high priority
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
68
Coordination probably recommended
Link: Denton Tap Road, Sandy Lake Road to Bethel School Road
Variabl
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
006
Storage Space is adequate
CF2
6
Proportion of Traffic In Platoon
083
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
1743
High Volumes, coordination is high priority
Av, volume adjustment
15
Cycle Length
85
at Sandy Lake Road
Cycle Length
85
at Bethel School Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
62
Coordination probably recommended
Synchro 3 Report C 1SYNCHRO ADATATROJECT1013776\PMOFF100I SYS
, Sverdrup Page I
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Denton Tap Road, Bethel School Road to Bethel Road
Variable
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
009
Storage Space is adequate
C F2
9
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
2099
High Volumes, coordination is high priority
Av, volume adjustment
19
Cycle Length
85
at Bethel School Road
Cycle Length
85
at Bethel Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
81
Coordination definitely recommended
Link: Denton Tap Road, Bethel Road to Belt Line Road
Variabl
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
009
Storage Space is adequate
CF2
9
Proportion of Traffic In Platoon
096
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
8
Main Street Volume (vph)
1763
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
85
at Bethel Road
Cycle Length
85
at Belt Line Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
81
Coordination definitely recommended
Synchro 3 Report C SYNCHR03 \13ATATROJECT\013776 PMOFF \001 SY5
Sverdrup Page 2
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Southwestern Boulevard to Airline Drive
Va riabl e
Value
Comments
Travel Time (s)
23
Travel Time okay For Coordination
CF1
75
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Proportion of Traffic In Platoon
092
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Main Street Volume (vph)
1988
High Volumes, coordination is high priority
Av, volume adjustment
18
Cycle Length
85
at Southwestern Boulevard
Cycle Length
85
at Airline Drive
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
99
Coordination definitely recommended
Link: Belt Line Road, Airline Drive to Wrangler Drive
Variable
Value
Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
019
Storage Space is adequate
CF2
19
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
1922
High Volumes, coordination is high priority
Av, volume adjustment
17
Cycle Length
85
at Airline Drive
Cycle Length
85
at Wrangler Drive
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
102
Coordination definitely recommended
Synchro 3 Report C F O O SYNCH 001 SY5
Sverdrup Page 3
Coordinatability Analysis Using Current Cycle Lengths.
March 18, 1997
Link: Belt Line Road, Wrangler Drive to Lakeshore Drive
•uu m
Travel Time (s)
26
Travel Time okay For Coordination
CF1
71
Travel Time okay For Coordination
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Storage Space is adequate
Proportion of Traffic In Platoon
1 00
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
10
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
1801
High Volumes, coordination is high priority
Av, volume adjustment
16
High Volumes, coordination is high priority
Cycle Length
85
at Wrangler Drive
Cycle Length
85
at Lakeshore Drive
Combined Cycle Length
85
at IH 635 WBFR
Cycle Length Increase
0
Ac, Cycle Adjustment
0
Moderate increase in cycle length
CF, Coordinatability Factor
97
Coordination definitely recommended
Link: Belt Line Road, Lakeshore Drive to 11-1635 WBFR
Variable
Value
Comments
Travel Time (s)
59
Travel Time okay For Coordination
CF1
28
Traffic / Storage Space
005
Storage Space is adequate
CF2
5
Proportion of Traffic In Platoon
099
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
9
Main Street Volume (vph)
1583
High Volumes, coordination is high priority
Av, volume adjustment
14
Cycle Length
85
at Lakeshore Drive
Cycle Length
65
at IH 635 WBFR
Combined Cycle Length
85
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
41
Coordination probably not recommended
Synchro 3 Report C \SYNCHRO3\ DATA \PROJECT\013776 \PMOFF'OOLSY5
Sverdrup Page 4
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, 111-11636 WBFR to 11-11636 EBFR
Value Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Travel Time okay For Coordination
Traffic / Storage Space
0.20
Storage Space is adequate
CF2
20
Storage Space is adequate
Proportion of Traffic In Platoon
094
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
1550
High Volumes, coordination is high priority
Av, volume adjustment
14
High Volumes, coordination is high priority
Cycle Length
65
at IH 635 WBFR
Cycle Length
65
at IH 635 EBFR
Combined Cycle Length
65
at Regent Boulevard
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
112
Coordination definitely recommended
Link: Belt Line Road, 11-1635 EBFR to Regent Boulevard
Variabie
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
0.22
Storage Space is adequate
CF2
22
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
1808
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
65
at IH 635 EBFR
Cycle Length
70
at Regent Boulevard
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
110
Coordination definitely recommended
Svnchro 3 Report C \ SYNCHR03 \DATATROJECT\OI3776TMOFF\00I SY5
, Sverdrup Pa 5
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Regent Boulevard to Royal Lane
value Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Travel Time okay For Coordination
Traffic / Storage Space
008
Storage Space is adequate
CF2
8
Storage Space is adequate
Proportion of Traffic In Platoon
093
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
1704
High Volumes, coordination is high priority
Av, volume adjustment
15
High Volumes, coordination is high priority
Cycle Length
70
at Regent Boulevard
Cycle Length
100
at Royal Lane
Combined Cycle Length
100
at SH 114 WBFR
Cycle Length Increase
30
Moderate increase in cycle length
Ac, Cycle Adjustment
-15
CF, Coordinatability Factor
52
Coordination probably recommended
Link: Belt Line Road, Royal Lane to SH 114 WBFR
Vari
Value
Comments
Travel Time (s)
35
Travel Time okay For Coordination
CF1
59
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Proportion of Traffic In Platoon
082
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
2076
High Volumes, coordination is high priority
Av, volume adjustment
19
Cycle Length
100
at Royal Lane
Cycle Length
100
at SH 114 WBFR
Combined Cycle Length
100
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
78
Coordination definitely recommended
Synchro 3 Report C \ SYNCHRO3 \DATA\PROJ EC 13776 \PMOFF \001 Sti 5
Sverdrup Page 6
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, SH 114 WBFR to SH 114 EBFR
Variable
Value
Comments
Travel Time (s)
9
Travel Time okay For Coordination
CF1
93
Traffic / Storage Space
054
Storage Space is adequate
CF2
54
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
2224
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at SH 114 WBFR
Cycle Length
65
at SH 114 EBFR
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
101
Coordination definitely recommended
Link: Belt Line Road, SH 114 EBFR to Valley View Lane
Va riabi
Value
Comments
Travel Time (s)
88
Travel Time too far for coordination
CF1
0
Traffic / Storage Space
005
Storage Space is adequate
CF2
5
Proportion of Traffic In Platoon
093
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Main Street Volume (vph)
2289
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 114 EBFR
Cycle Length
100
at Valley View Lane
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
14
Coordination definitely not recommended
Synchro 3 Report C \SYNCHRO3\ DATA TROJECT\013776 \PMOFF \OOI.SY5
Sverdrup Page 7
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Valley View Lane to SH 161 WBFR
Va riabi
Travel Time (s)
53
CF1
36
Traffic / Storage Space
006
CF2
6
Proportion of Traffic In Platoon
096
Ap, platoon adjustment
8
Main Street Volume (vph)
1875
Av, volume adjustment
17
Cycle Length
100
Cycle Length
65
Combined Cycle Length
100
Cycle Length Increase
35
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
44
Comments
Travel Time okay For Coordination
Storage Space is adequate
Traffic heavily platooned, coordination is appropriate
High Volumes, coordination is high priority
at Valley View Lane
at SH 161 WBFR
Moderate increase in cycle length
Coordination probably not recommended
Link. Belt Line Road, SH 161 WBFR to SH 161 EBFR
Var iabi
Value
Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
024
Storage Space is adequate
CF2
24
Proportion of Traffic In Platoon
083
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
2193
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 161 WBFR
Cycle Length
65
at SH 161 EBFR
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
108
Coordination definitely recommended
Synchro 3 Report C SYNCHR03\ DATA .PROJECT\013776 \PMOFF \001.SY5
Sverdrup Page 8
Coordinatability Analysis Using Current Cycle Lengths
March 18, 1997
Link: Belt Line Road, SH 161 EBFR to Story Road
1 •uu
Travel Time (s)
36
Travel Time okay For Coordination
CF1
58
Travel Time okay For Coordination
Traffic / Storage Space
012
Storage Space is adequate
CF2
12
Storage Space is adequate
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
2686
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
65
at SH 161 EBFR
Cycle Length
65
at Story Road
Combined Cycle Length
65
at Walnut Hill Lane
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
85
Coordination definitely recommended
Link: Belt Line Road, Story Road to Walnut Hill Lane
Varia
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
007
Storage Space is adequate
CF2
7
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
2188
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Story Road
Cycle Length
70
at Walnut Hill Lane
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
72
Coordination definitely recommended
Y,nchro 3 Report C \SYNCHR03 \DA TA PROJFCT\013776 \PMOFF \001 SY5
�verdrup Page 9
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Walnut Hill Lane to Country Club Road
Variable
Value
Comments
Travel Time (s)
32
Travel Time okay For Coordination
CF1
63
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
2807
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Walnut Hill Lane
Cycle Length
65
at Country Club Road
Combined Cycle Length
70
Cycle Length Increase
5
Moderate increase in cycle length
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
83
Coordination definitely recommended
Link: Belt Line Road, Country Club Road to Northgate Drive
Variable
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
0.25
Storage Space is adequate
CF2
25
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
2845
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Country Club Road
Cycle Length
100
at Northgate Drive
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
78
Coordination definitely recommended
Synchro 3 Report C SYNC HRO3\DATA \PROJECT\0I3776 \PMOFF' 001 SY5
Sverdrup Page 10
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Northgate Drive to Finley Road
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Travel Time okay For Coordination
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Storage Space is adequate
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
3401
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
100
at Northgate Drive
Cycle Length
65
at Finley Road
Combined Cycle Length
100
at Rochelle Road
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
Moderate increase in cycle length
CF, Coordinatability Factor
56
Coordination probably recommended
Link: Belt Line Road, Finley Road to Rochelle Road
Va riabl e
Value
Comments
Travel Time (s)
25
Travel Time okay For Coordination
CF1
72
Traffic / Storage Space
027
Storage Space is adequate
CF2
27
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3656
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Finley Road
Cycle Length
90
at Rochelle Road
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
85
Coordination definitely recommended
Synchro 3 Report C SYNCH R03 11DATATROJECT''.013776\PMOFF100I SY5
, Sverdrup Page I I
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Rochelle Road to Strait Street
Variable
Value
Comments
Travel Time (s)
18
Travel Time okay For Coordination
CF1
82
Traffic / Storage Space
037
Storage Space is adequate
CF2
37
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3268
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
90
at Rochelle Road
Cycle Length
65
at Strait Street
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
95
Coordination definitely recommended
Link: Belt Line Road, Strait Street to Grande Bulevar
Va riabl e
Value
Comments
Travel Time (s)
10
Travel Time okay For Coordination
CF1
92
Traffic / Storage Space
069
Storage Space is adequate
CF2
69
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
3262
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Strait Street
Cycle Length
75
at Grande Bulevar
Combined Cycle Length
75
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
111
Coordination definitely recommended
Synchro 3 Report C 1SYNCHR03' DATATROJECT.013 SY5
Sverdrup Page 12
Coordinatability Analysis Using Current Cycle Lengths
March 18, 1997
Link: Belt Line Road, Grande Bulevar to Irving Mall Entrance
Variable
Value
Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Storage Space is adequate
Traffic / Storage Space
034
Storage Space is adequate
CF2
34
Traffic heavily platooned, coordination is appropriate
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
High Volumes, coordination is high priority
Main Street Volume (vph)
3440
High Volumes, coordination is high priority
Av, volume adjustment
20
at Irving Mall Entrance
Cycle Length
75
at Grande Bulevar
Cycle Length
70
at Irving Mall Entrance
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
Coordination definitely recommended
CF, Coordinatability Factor
103
Coordination definitely recommended
Link: Belt Line Road, Irving Mall Entrance to SH 183 WBFR
Value Comments
Travel Time (s)
15
Travel Time okay For Coordination
CF1
86
Traffic / Storage Space
042
Storage Space is adequate
CF2
42
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3347
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Irving Mall Entrance
Cycle Length
60
at SH 183 WBFR
Combined Cycle Length
70
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
103
Coordination definitely recommended
Synchro 3 Report C SYNCH RO3 IDATA\PROJECT\013776 1001 SY5
Sverdrup Page I3
Coordinatability Analysis Using Current Cycle Lengths
March 18, 1997
Link: Belt Line Road, SH 183 WBFR to Irving Boulevard
Variable
Value
Commonts
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
018
Storage Space is adequate
CF2
18
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
2826
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
60
at SH 183 WBFR
Cycle Length
65
at Irving Boulevard
Combined Cycle Length
65
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
90
Coordination definitely recommended
Link: Belt Line Road, SH 183 EBFR to Willow Creek Drive
Vari
Value
Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
052
Storage Space is adequate
CF2
52
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3176
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 183 EBFR
Cycle Length
80
at Willow Creek Drive
Combined Cycle Length
80
Cycle Length Increase
15
Ac, Cycle Adjustment
-7
CF, Coordinatability Factor
102
Coordination definitely recommended
Synchro 3 Report C , SYNCHRO3 % DATA, PROJECT1013776'.PMOFF \001 SY5
Sverdrup Page 14
Coordinatability Analysis Using Current Cycle Lengths
March 18, 1997
Link: Belt Line Road, Willow Creek Drive to Pioneer Drive
Variable
Value
Comments
Travel Time (s)
31
Travel Time okay For Coordination
CF1
64
Traffic / Storage Space
016
Storage Space is adequate
CF2
16
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
2972
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
80
at Willow Creek Drive
Cycle Length
75
at Pioneer Drive
Combined Cycle Length
80
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
85
Coordination definitely recommended
Link: Belt Line Road, Pioneer Drive to Conflans Road
Variable
Value
Comments
Travel Time (s)
47
Travel Time okay For Coordination
CF1
43
Traffic / Storage Space
010
Storage Space is adequate
CF2
10
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
2848
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Pioneer Drive
Cycle Length
70
at Conflans Road
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
63
Coordination probably recommended
Sy nchro 3 Report C \ SYNCHRO3 \DATA\PROJECT\013776 \PMOFF OO LSY5
Sverdrup Page 15
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Conflans Road to Rock Island Road
Value Comments
Travel Time (s)
44
Travel Time okay For Coordination
CF1
47
Travel Time okay For Coordination
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Storage Space is adequate
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
2443
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
70
at Conflans Road
Cycle Length
90
at Rock Island Road
Combined Cycle Length
90
at Shady Grove Road
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
61
Coordination probably recommended
Link: Belt Line Road, Rock Island Road to Shady Grove Road
Var
Value
Comments
Travel Time (s)
74
Travel Time okay For Coordination
CF1
8
Traffic / Storage Space
007
Storage Space is adequate
CF2
7
Proportion of Traffic In Platoon
082
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
2063
High Volumes, coordination is high priority
Av, volume adjustment
19
Cycle Length
90
at Rock Island Road
Cycle Length
100
at Shady Grove Road
Combined Cycle Length
100
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
22
Coordination definitely not recommended
Synchro 3 Report C \SYNCHRO3 \DATA \013776 \PMOFF \001 SY5
, Sverdrup Page 16
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Shady Grove Road to Oakdale Road
Variable
Value
Comments
Travel Time (s)
65
Travel Time okay For Coordination
CF1
20
Traffic / Storage Space
005
Storage Space is adequate
CF2
5
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1763
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
100
at Shady Grove Road
Cycle Length
65
at Oakdale Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
26
Coordination definitely not recommended
Synchro 3 Report C \ SYNCHRO3DATA \PROJECT \PMOFF \001 SN i
, Sverdrup
Page I 7
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Denton Tap Road, Parkway Boulevard to Sandy Lake Road
Variable
Value
Comments
Travel Time (s)
40
Travel Time okay For Coordination
CF1
53
Traffic / Storage Space
0.23
Storage Space is adequate
CF2
23
Proportion of Traffic In Platoon
077
Traffic moderately platooned
Ap, platoon adjustment
-3
Main Street Volume (vph)
2983
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
85
at Parkway Boulevard
Cycle Length
85
at Sandy Lake Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
70
Coordination probably recommended
Link: Denton Tap Road, Sandy Lake Road to Bethel School Road
Variabl
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Proportion of Traffic In Platoon
079
Traffic moderately platooned
Ap, platoon adjustment
-1
Main Street Volume (vph)
2790
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
85
at Sandy Lake Road
Cycle Length
85
at Bethel School Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
65
Coordination probably recommended
Synchro 3 Report
Sverdrup
C ' SY NCHR03IDATA \PROJECT10137761PMPE AK OOI .SYS
Page I
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Denton Tap Road, Bethel School Road to Bethel Road
Variable
Travel Time (s)
Value
37
Comments
Travel Time okay For Coordination
CF1
57
Travel Time okay For Coordination
Traffic / Storage Space
026
Storage Space is adequate
CF2
26
Storage Space is adequate
Proportion of Traffic In Platoon
078
Traffic moderately platooned
Ap, platoon adjustment
-2
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
4131
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
85
at Bethel School Road
Cycle Length
85
at Bethel Road
Combined Cycle Length
85
at Belt Line Road
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
75
Coordination definitely recommended
Link: Denton Tap Road, Bethel Road to Belt Line Road
Variabl
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
009
Storage Space is adequate
CF2
9
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1739
High Volumes, coordination is high priority
Av, volume adjustment
15
Cycle Length
85
at Bethel Road
Cycle Length
85
at Belt Line Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
79
Coordination definitely recommended
r
Synchro 3 Report
, Sverdrup
C \SYNCHR03 \DATA \PROJECT\013776 \PMPEAK OOI.SY5
Page 2
Coordinatability Analysis Using Current Cycle Lengths- March 18, 1997
Link: Belt Line Road, Southwestern Boulevard to Airline Drive
Variable
Value
Comments
Travel Time (s)
23
Travel Time okay For Coordination
CF1
75
Traffic / Storage Space
037
Storage Space is adequate
CF2
37
Proportion of Traffic In Platoon
084
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
3588
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
85
at Southwestern Boulevard
Cycle Length
85
at Airline Drive
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
96
Coordination definitely recommended
Link: Belt Line Road, Airline Drive to Wrangler Drive
Variable
Value
Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
047
Storage Space is adequate
CF2
47
.— Proportion of Traffic In Platoon
077
Traffic moderately platooned
Ap, platoon adjustment
-3
Main Street Volume (vph)
3652
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
85
at Airline Drive
Cycle Length
85
at Wrangler Drive
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
97
Coordination definitely recommended
Synchro 3 Report C 1 SYNCHRO3 \DATA\PROJECT1013776 \PMPEAK'00I SY�
, Sverdrup
Pae 3
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Wrangler Drive to Lakeshore Drive
Variable
Value
Comments
Travel Time (s)
26
Travel Time okay For Coordination
CF1
71
Traffic / Storage Space
027
Storage Space is adequate
CF2
27
Proportion of Traffic In Platoon
078
Traffic moderately platooned
Ap, platoon adjustment
-2
Main Street Volume (vph)
3041
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
85
at Wrangler Drive
Cycle Length
85
at Lakeshore Drive
Combined Cycle Length
85
Cycle Length Increase
0
Moderate increase in cycle length
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
89
Coordination definitely recommended
Link: Belt Line Road, Lakeshore Drive to 11-11635 WBFR
Variable
Value
Comments
Travel Time (s)
59
Travel Time okay For Coordination
CF1
28
Traffic / Storage Space
017
Storage Space is adequate
CF2
17
Proportion of Traffic In Platoon
077
Traffic moderately platooned
Ap, platoon adjustment
-3
Main Street Volume (vph)
3854
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
85
at Lakeshore Drive
Cycle Length
65
at IH 635 WBFR
Combined Cycle Length
85
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
35
Coordination probably not recommended
Synchro 3 Report C \SYNCHR03 \DATA \PROJECT\013776`PMPEAK \001 SY>
, Sverdrup
Page 4
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, 11-11635 WBFR to 11-1635 EBFR
Varia
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
044
Storage Space is adequate
CF2
44
Proportion of Traffic In Platoon
083
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
3160
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at IH 635 WBFR
Cycle Length
65
at IH 635 EBFR
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
112
Coordination definitely recommended
Link: Belt Line Road, 11-1635 EBFR to Regent Boulevard
Variabl
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
063
Storage Space is adequate
CF2
63
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
4263
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at IH 635 EBFR
Cycle Length
70
at Regent Boulevard
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
111
Coordination definitely recommended
Synchro 3 Report C \SYNCHRO3 \DATA \PROJECT\013776,PMPEAK \001 SY5
, Sverdrup Page 5
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Regent Boulevard to Royal Lane
Variable
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
015
Storage Space is adequate
CF2
15
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3604
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Regent Boulevard
Cycle Length
100
at Royal Lane
Combined Cycle Length
100
Cycle Length Increase
30
Moderate increase in cycle length
Ac, Cycle Adjustment
-15
CF, Coordinatability Factor
54
Coordination probably recommended
Link: Belt Line Road, Royal Lane to SH 114 WBFR
Variabl
Value
Comments
Travel Time (s)
35
Travel Time okay For Coordination
CF1
59
Traffic / Storage Space
0.20
Storage Space is adequate
CF2
20
Proportion of Traffic In Platoon
071
Traffic moderately platooned
Ap, platoon adjustment
-6
Main Street Volume (vph)
3904
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Royal Lane
Cycle Length
100
at SH 114 WBFR
Combined Cycle Length
100
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
73
Coordination definitely recommended
Synchro 3 Report C SYNC HRO3 \DATA' \PM PEA K \001 SY5
Sverdrup Page 6
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, SH 114 WBFR to SH 114 EBFR
Variabl
Value
Comments
Travel Time (s)
9
Travel Time okay For Coordination
CF1
93
Traffic / Storage Space
076
Storage Space is adequate
C F2
76
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
4052
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at SH 114 WBFR
Cycle Length
65
at SH 114 EBFR
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
101
Coordination definitely recommended
Link: Belt Line Road, SH 114 EBFR to Valley View Lane
Variable
Value
Comments
Travel Time (s)
88
Travel Time too far for coordination
CF1
0
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
-- Proportion of Traffic In Platoon
077
Traffic moderately platooned
Ap, platoon adjustment
-3
Main Street Volume (vph)
4575
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 114 EBFR
Cycle Length
100
at Valley View Lane
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
11
Coordination definitely not recommended
S�nchro 3 Report C ' SYNCHRO3IDATAIPROJECT 10137761PMPEAK�001 SY5
Sverdrup
Page 7
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Valley View Lane to SH 161 WBFR
Variable
Value
Comments
Travel Time (s)
53
Travel Time okay For Coordination
CF1
36
Traffic / Storage Space
009
Storage Space is adequate
CF2
9
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
3200
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Valley View Lane
Cycle Length
65
at SH 161 WBFR
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
44
Coordination probably not recommended
Link: Belt Line Road, SH 161 WBFR to SH 161 EBFR
Variable
Value
Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
0.27
Storage Space is adequate
CF2
27
Proportion of Traffic In Platoon
078
Traffic moderately platooned
Ap, platoon adjustment
-2
Main Street Volume (vph)
2770
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 161 WBFR
Cycle Length
65
at SH 161 EBFR
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
105
Coordination definitely recommended
Synchro 3 Report C \SYNCHRO3 \DATA \PROJECT\013776 \PMPEAK 001 SY5
, Sverdrup Page 8
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, SH 161 EBFR to Story Road
Variable
Value
Comments
Travel Time (s)
36
Travel Time okay For Coordination
CF1
58
Traffic / Storage Space
0.20
Storage Space is adequate
CF2
20
Proportion of Traffic In Platoon
079
Traffic moderately platooned
Ap, platoon adjustment
-1
Main Street Volume (vph)
4321
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 161 EBFR
Cycle Length
65
at Story Road
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
77
Coordination definitely recommended
Link: Belt Line Road, Story Road to Walnut Hill Lane
Variable
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3579
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Story Road
Cycle Length
70
at Walnut Hill Lane
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
70
Coordination probably recommended
Synchro 3 Report C \SYNCHRO3 \PROJECT" 013776 \PMPEAK \001 SY5
, Sverdrup Pace 9
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Walnut Hill Lane to Country Club Road
Value Comments
Travel Time (s)
32
Travel Time okay For Coordination
CF1
63
Travel Time okay For Coordination
Traffic / Storage Space
021
Storage Space is adequate
CF2
21
Storage Space is adequate
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
3785
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
70
at Walnut Hill Lane
Cycle Length
65
at Country Club Road
Combined Cycle Length
70
at Northgate Drive
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
Moderate increase in cycle length
CF, Coordinatability Factor
84
Coordination definitely recommended
Link: Belt Line Road, Country Club Road to Northgate Drive
Variable
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
035
Storage Space is adequate
CF2
35
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3707
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Country Club Road
Cycle Length
100
at Northgate Drive
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
75
Coordination definitely recommended
Synchro 3 Report C \SYNCHRO3 DATA\PROJECT\013776 \PMPEAK \001 SY5
, Sverdrup
Page 10
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Northgate Drive to Finley Road
Variable
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
016
Storage Space is adequate
CF2
16
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
4243
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Northgate Drive
Cycle Length
65
at Finley Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
56
Coordination probably recommended
Link: Belt Line Road, Finley Road to Rochelle Road
Variable
Value
Comments
Travel Time (s)
25
Travel Time okay For Coordination
CF1
72
Traffic / Storage Space
036
Storage Space is adequate
CF2
36
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
4477
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Finley Road
Cycle Length
90
at Rochelle Road
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
82
Coordination definitely recommended
Synchro 3 Report ( SYNCHR03 \DATA SY5
Sverdrup Page II
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Rochelle Road to Strait Street
Variable
Value
Comments
Travel Time (s)
18
Travel Time okay For Coordination
CF1
82
Traffic / Storage Space
043
Storage Space is adequate
C F2
43
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
4251
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
90
at Rochelle Road
Cycle Length
65
at Strait Street
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
95
Coordination definitely recommended
Link: Belt Line Road, Strait Street to Grande Bulevar
Variable
Value
Comments
Travel Time (s)
10
Travel Time okay For Coordination
CF1
92
Traffic / Storage Space
087
Traffic exceeds 80% of storage, coordination needed
CF2
87
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
4047
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Strait Street
Cycle Length
75
at Grande Bulevar
Combined Cycle Length
75
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
110
Coordination definitely recommended
5} nchro 3 Report
Sverdrup
C \SYNCHRO3 \DATA PROJECT \013776 \PMPEAK \OOI.SY5
Page 12
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Grande Bulevar to Irving Mall Entrance
Variable
Value
Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
044
Storage Space is adequate
CF2
44
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
4270
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Grande Bulevar
Cycle Length
70
at Irving Mall Entrance
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
103
Coordination definitely recommended
Link: Belt Line Road, Irving Mall Entrance to SH 183 WBFR
Variable
Value
Comments
Travel Time (s)
15
Travel Time okay For Coordination
CF1
86
Traffic / Storage Space
054
Storage Space is adequate
CF2
54
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3925
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Irving Mall Entrance
Cycle Length
60
at SH 183 WBFR
Combined Cycle Length
70
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
103
Coordination definitely recommended
Synchro 3 Report C \SYNCH R03\DATATROJECT\O I 3776\PMPEAK,00 I SY5
, Sverdrup
Page 13
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, SH 183 WBFR to Irving Boulevard
Vari
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
027
Storage Space is adequate
CF2
27
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
4034
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
60
at SH 183 WBFR
Cycle Length
65
at Irving Boulevard
Combined Cycle Length
65
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
90
Coordination definitely recommended
Link: Belt Line Road, SH 183 EBFR to Willow Creek Drive
Variabi
Value
Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
071
Storage Space is adequate
CF2
71
Proportion of Traffic In Platoon
081
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
4002
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 183 EBFR
Cycle Length
80
at Willow Creek Drive
Combined Cycle Length
80
Cycle Length Increase
15
Ac, Cycle Adjustment
-7
CF, Coordinatability Factor
100
Coordination definitely recommended
Synchro ; Report C \SYNCHR03 \DATA \PROJECT 01 ,776 \PMPEAK1001 SY5
Sverdrup
Page 14
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Willow Creek Drive to Pioneer Drive
Variable
Value
Comments
Travel Time (s)
31
Travel Time okay For Coordination
CF1
64
Traffic / Storage Space
0.20
Storage Space is adequate
CF2
20
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3869
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
80
at Willow Creek Drive
Cycle Length
75
at Pioneer Drive
Combined Cycle Length
80
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
85
Coordination definitely recommended
Link. Belt Line Road, Pioneer Drive to Conflans Road
Variable
Val
Comments
Travel Time (s)
47
Travel Time okay For Coordination
CF1
43
Traffic / Storage Space
012
Storage Space is adequate
CF2
12
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3429
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Pioneer Drive
Cycle Length
70
at Conflans Road
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
64
Coordination probably recommended
Synchro 3 Report C \SYNCHRO3 DATA\PROJECT\013776 \PMPEAK \001 SY5
Sverdrup
Pale 15
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Conflans Road to Rock Island Road
Variabl
Value
Comments
Travel Time (s)
44
Travel Time okay For Coordination
CF1
47
Traffic / Storage Space
017
Storage Space is adequate
CF2
17
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3509
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Conflans Road
Cycle Length
90
at Rock Island Road
Combined Cycle Length
90
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
60
Coordination probably recommended
Link: Belt Line Road, Rock Island Road to Shady Grove Road
Variabl
Value
Comments
Travel Time (s)
74
Travel Time okay For Coordination
CF1
8
Traffic / Storage Space
012
Storage Space is adequate
CF2
12
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3044
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
90
at Rock Island Road
Cycle Length
100
at Shady Grove Road
Combined Cycle Length
100
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
30
Coordination definitely not recommended
Synchro 3 Report
, Sverdrup
C \SYNCHRO3 \DATA \PROJECT\013776 Pfv1PEAK \001 SY5
Page 16
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Shady Grove Road to Oakdale Road
Variab
Value
Comments
Travel Time (s)
65
Travel Time okay For Coordination
CF1
20
Traffic / Storage Space
008
Storage Space is adequate
CF2
8
Proportion of Traffic In Platoon
084
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
2721
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Shady Grove Road
Cycle Length
65
at Oakdale Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
24
Coordination definitely not recommended
Synchro 3 Report
Sverdrup
\SYNCHRO3\DATA PR0JECT\013776 \PMPEAK SY5
Page 17
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Denton Tap Road, Parkway Boulevard to Sandy Lake Road
Variable
Value
Comments
Travel Time (s)
40
Travel Time okay For Coordination
CF1
53
Traffic / Storage Space
006
Storage Space is adequate
CF2
6
Proportion of Traffic In Platoon
078
Traffic moderately platooned
Ap, platoon adjustment
-2
Main Street Volume (vph)
1514
High Volumes, coordination is high priority
Av, volume adjustment
13
Cycle Length
85
at Parkway Boulevard
Cycle Length
85
at Sandy Lake Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
64
Coordination probably recommended
Link: Denton Tap Road, Sandy Lake Road to Bethel School Road
Variable
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
006
Storage Space is adequate
CF2
6
Proportion of Traffic In Platoon
083
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
1665
High Volumes, coordination is high priority
Av, volume adjustment
15
Cycle Length
85
at Sandy Lake Road
Cycle Length
85
at Bethel School Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
62
Coordination probably recommended
Svnchro 3 Report
, S erdrup
C ,SYNCHR03 \DATA\PROJECT013776 \SATURDAY \001.SY5
Page I
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Denton Tap Road, Bethel School Road to Bethel Road
Va rlabi
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
009
Storage Space is adequate
C F2
9
Proportion of Traffic In Platoon
091
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
2099
High Volumes, coordination is high priority
Av, volume adjustment
19
Cycle Length
85
at Bethel School Road
Cycle Length
85
at Bethel Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
81
Coordination definitely recommended
Link: Denton Tap Road, Bethel Road to Belt Line Road
Variable
Value
Comments
Travel Time (s)
37
Travel Time okay For Coordination
CF1
57
Traffic / Storage Space
009
Storage Space is adequate
CF2
9
Proportion of Traffic In Platoon
096
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
8
Main Street Volume (vph)
1903
High Volumes, coordination is high priority
Av, volume adjustment
17
Cycle Length
85
at Bethel Road
Cycle Length
85
at Belt Line Road
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
82
Coordination definitely recommended
Synchro 3 Report C \SYNCHR03 DATAIPROJECT10137761SATURDAY 1001 SY5
Sverdrup
Pa 2
Coordinatability Analysis Using Current Cycle Lengths: March 18, 1997
Link: Belt Line Road, Southwestern Boulevard to Airline Drive
Variable
Value
Comments
Travel Time (s)
23
Travel Time okay For Coordination
CF1
75
Traffic / Storage Space
012
Storage Space is adequate
CF2
12
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
1829
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
85
at Southwestern Boulevard
Cycle Length
85
at Airline Drive
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
94
Coordination definitely recommended
Link: Belt Line Road, Airline Drive to Wrangler Drive
Variable
Value
Comments
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
019
Storage Space is adequate
CF2
19
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1922
High Volumes, coordination is high priority
Av, volume adjustment
17
Cycle Length
85
at Airline Drive
Cycle Length
85
at Wrangler Drive
Combined Cycle Length
85
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
104
Coordination definitely recommended
Synchro 3 Report C , SYNC HRO3 \DATA\PROJECT1013776 SATURDAY SY5
Sverdrup Page 3
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Wrangler Drive to Lakeshore Drive
Variable
Value
Comments
Travel Time (s)
26
Travel Time okay For Coordination
CF1
71
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Proportion of Traffic In Platoon
1 00
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
10
Main Street Volume (vph)
1801
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
85
at Wrangler Drive
Cycle Length
85
at Lakeshore Drive
Combined Cycle Length
85
Cycle Length Increase
0
Moderate increase in cycle length
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
97
Coordination definitely recommended
Link: Belt Line Road, Lakeshore Drive to 11-1635 WBFR
Variable
Value
Comments
Travel Time (s)
59
Travel Time okay For Coordination
CF1
28
Traffic / Storage Space
005
Storage Space is adequate
CF2
5
Proportion of Traffic In Platoon
099
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
9
Main Street Volume (vph)
1633
High Volumes, coordination is high priority
Av, volume adjustment
14
Cycle Length
85
at Lakeshore Drive
Cycle Length
65
at IH 635 WBFR
Combined Cycle Length
85
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
CF, Coordinatability Factor
41
Coordination probably not recommended
Synchro 3 Report C ' SYNCHRO3 DATA ,PROJECT'\013776\SATURDAY1001 SY5
Sverdrup
Page 4
Coordinatability Analysis Using Current Cycle Lengths- March 18, 1997
Link: Belt Line Road, 11-11635 WBFR to 11-11635 EBFR
Variable
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
024
Storage Space is adequate
C F2
24
Proportion of Traffic In Platoon
094
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1837
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
65
at IH 635 WBFR
Cycle Length
65
at IH 635 EBFR
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
114
Coordination definitely recommended
Link: Belt Line Road, 11-11635 EBFR to Regent Boulevard
Variabl
Value
Comments
Travel Time (s)
11
Travel Time okay For Coordination
CF1
91
Traffic / Storage Space
026
Storage Space is adequate
CF2
26
Proportion of Traffic In Platoon
093
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Main Street Volume (vph)
1898
High Volumes, coordination is high priority
Av, volume adjustment
17
Cycle Length
65
at IH 635 EBFR
Cycle Length
70
at Regent Boulevard
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
112
Coordination definitely recommended
Synchro 3 Report C \SYNCHRO3\ DATA \PROJECT\013776`.SATU RDA Y\OOI SY5
Sverdrup
Page 5
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Regent Boulevard to Royal Lane
Variable
Value
Comments
Travel Time (s)
45
Travel Time okay For Coordination
CF1
46
Traffic / Storage Space
008
Storage Space is adequate
CF2
8
Proportion of Traffic In Platoon
093
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
6
Main Street Volume (vph)
1704
High Volumes, coordination is high priority
Av, volume adjustment
15
Cycle Length
70
at Regent Boulevard
Cycle Length
100
at Royal Lane
Combined Cycle Length
100
Cycle Length Increase
30
Moderate increase in cycle length
Ac, Cycle Adjustment
-15
CF, Coordinatability Factor
52
Coordination probably recommended
Link: Belt Line Road, Royal Lane to SH 114 WBFR
Variable
Value
Comments
Travel Time (s)
35
Travel Time okay For Coordination
CF1
59
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Proportion of Traffic In Platoon
082
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
1996
High Volumes, coordination is high priority
Av, volume adjustment
18
Cycle Length
100
at Royal Lane
Cycle Length
100
at SH 114 WBFR
Combined Cycle Length
100
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
77
Coordination definitely recommended
Synchro 3 Report C' SYNCHR03 1DATA ' SY5
Sverdrup Page 6
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, SH 114 WBFR to SH 114 EBFR
Value Comments
Travel Time (s)
9
Travel Time okay For Coordination
CF1
93
Travel Time too far for coordination
Traffic / Storage Space
050
Storage Space is adequate
CF2
50
Storage Space is adequate
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
2344
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
100
at SH 114 WBFR
Cycle Length
65
at SH 114 EBFR
Combined Cycle Length
100
at Valley View Lane
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
Moderate increase in cycle length
CF, Coordinatability Factor
100
Coordination definitely recommended
Link: Belt Line Road, SH 114 EBFR to Valley View Lane
Va riabl e
Value
Comments
Travel Time (s)
88
Travel Time too far for coordination
CF1
0
Traffic / Storage Space
006
Storage Space is adequate
CF2
6
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
2641
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 114 EBFR
Cycle Length
100
at Valley View Lane
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
16
Coordination definitely not recommended
Synchro 3 Report C ' SYNCHR03 1DATAIPROJECP0137761SATURDAY 001 SY5
, Sverdrup
Page 7
Coordinatability Analysis Using Current Cycle Lengths: March 18, 1997
Link: Belt Line Road, Valley View Lane to SH 161 WBFR
I--
Variable
Value
Comments
Travel Time (s)
53
Travel Time okay For Coordination
CF1
36
Traffic / Storage Space
008
Storage Space is adequate
CF2
8
Proportion of Traffic In Platoon
1 00
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
10
Main Street Volume (vph)
2337
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Valley View Lane
Cycle Length
65
at SH 161 WBFR
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
49
Coordination probably not recommended
Link: Belt Line Road, SH 161 WBFR to SH 161 EBFR
Variable
Value
Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
0.25
Storage Space is adequate
CF2
25
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
2441
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 161 WBFR
Cycle Length
65
at SH 161 EBFR
Combined Cycle Length
65
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
111
Coordination definitely recommended
Synchro 3 Report
Sverdrup
C \SYNCHRO3 DATATROJECT1013776\SATURDAY100I SY5
Page 8
Coordinatability Analysis Using Current Cycle Lengths* March 18, 1997
Link: Belt Line Road, SH 161 EBFR to Story Road
Value Commonts
Travel Time (s)
36
Travel Time okay For Coordination
CF1
58
Travel Time okay For Coordination
Traffic / Storage Space
015
Storage Space is adequate
CF2
15
Storage Space is adequate
Proportion of Traffic In Platoon
096
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
8
Traffic heavily platooned, coordination is appropriate
Main Street Volume (vph)
3263
High Volumes, coordination is high priority
Av, volume adjustment
20
High Volumes, coordination is high priority
Cycle Length
65
at SH 161 EBFR
Cycle Length
65
at Story Road
Combined Cycle Length
65
at Walnut Hill Lane
Cycle Length Increase
0
Ac, Cycle Adjustment
0
CF, Coordinatability Factor
86
Coordination definitely recommended
Link: Belt Line Road, Story Road to Walnut Hill Lane
Variable
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
010
Storage Space is adequate
CF2
10
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
3231
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Story Road
Cycle Length
70
at Walnut Hill Lane
Combined Cycle Length
70
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
70
Coordination probably recommended
Synchro 3 Report C .SYNCHRO3I DATA , PROJECT1013776 , ,SATURDAY1001 SY
, Sverdrup
Page 9
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Walnut Hill Lane to Country Club Road
Variabie
Value
Comments
Travel Time (s)
32
Travel Time okay For Coordination
CF1
63
Traffic / Storage Space
014
Storage Space is adequate
CF2
14
Proportion of Traffic In Platoon
081
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
3067
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Walnut Hill Lane
Cycle Length
65
at Country Club Road
Combined Cycle Length
70
Cycle Length Increase
5
Moderate increase in cycle length
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
81
Coordination definitely recommended
Link: Belt Line Road, Country Club Road to Northgate Drive
Variabi
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
032
Storage Space is adequate
CF2
32
-- Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
Main Street Volume (vph)
3219
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Country Club Road
Cycle Length
100
at Northgate Drive
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
77
Coordination definitely recommended
Synchro 3 Report C SYNCHRO3 \DATA\PROJECT \013776 \SATURDAY\OOI.SY5
, Sverdrup
Page 10
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Northgate Drive to Finley Road
Variable
Value
Comments
Travel Time (s)
43
Travel Time okay For Coordination
CF1
49
Traffic / Storage Space
019
Storage Space is adequate
CF2
19
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
4673
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
100
at Northgate Drive
Cycle Length
65
at Finley Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
55
Coordination probably recommended
Link: Belt Line Road, Finley Road to Rochelle Road
Variabl
Value
Comments
Travel Time (s)
25
Travel Time okay For Coordination
CF1
72
Traffic / Storage Space
031
Storage Space is adequate
CF2
31
Proportion of Traffic In Platoon
090
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
5
Main Street Volume (vph)
4545
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Finley Road
Cycle Length
90
at Rochelle Road
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
85
Coordination definitely recommended
�%nchro 3 Report C \SYNCH ROY DATA\PROJECT\013776 \SATU RDA Y \001 SY5
1verdrup Page II
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Rochelle Road to Strait Street
Variable
Value
Comments
Travel Time (s)
18
Travel Time okay For Coordination
CF1
82
Traffic / Storage Space
052
Storage Space is adequate
CF2
52
Proportion of Traffic In Platoon
084
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
1
Main Street Volume (vph)
4660
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
90
at Rochelle Road
Cycle Length
65
at Strait Street
Combined Cycle Length
90
Cycle Length Increase
25
Moderate increase in cycle length
Ac, Cycle Adjustment
-12
CF, Coordinatability Factor
91
Coordination definitely recommended
Link: Belt Line Road, Strait Street to Grande Bulevar
Variable
Value
Comments
Travel Time (s)
10
Travel Time okay For Coordination
CF1
92
Traffic / Storage Space
096
Traffic exceeds 80% of storage, coordination needed
CF2
96
Proportion of Traffic In Platoon
088
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
4706
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at Strait Street
Cycle Length
75
at Grande Bulevar
Combined Cycle Length
75
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
114
Coordination definitely recommended
Synchro 3 Report C' SYNCHRO3\DATA TROJECT10I3776' RDA Y OOLSY5
Sverdrup Page 12
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Grande Bulevar to Irving Mall Entrance
Variable
Value
Commonts
Travel Time (s)
19
Travel Time okay For Coordination
CF1
80
Traffic / Storage Space
046
Storage Space is adequate
CF2
46
Proportion of Traffic In Platoon
087
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
3
Main Street Volume (vph)
4809
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Grande Bulevar
Cycle Length
70
at Irving Mall Entrance
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
101
Coordination definitely recommended
Link. Belt Line Road, Irving Mall Entrance to SH 183 WBFR
Variable
Value
Comments
Travel Time (s)
15
Travel Time okay For Coordination
CF1
86
Traffic / Storage Space
068
Storage Space is adequate
CF2
68
Proportion of Traffic In Platoon
065
Traffic moderately platooned
Ap, platoon adjustment
-9
Main Street Volume (vph)
5781
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
70
at Irving Mall Entrance
Cycle Length
60
at SH 183 WBFR
Combined Cycle Length
70
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
92
Coordination definitely recommended
Synchro ; Report C 1SYNCHRO3, DATA \PROJECPO]3776\SATURDAY'001.SY5
Sverdrup
Page 13
Coordinatability Analysis Using Current Cycle Lengths: March 18, 1997
Link: Belt Line Road, SH 183 WBFR to Irving Boulevard
Variable
Value
Comments
Travel Time (s)
27
Travel Time okay For Coordination
CF1
70
Traffic / Storage Space
033
Storage Space is adequate
CF2
33
Proportion of Traffic In Platoon
081
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
5806
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
60
at SH 183 WBFR
Cycle Length
65
at Irving Boulevard
Combined Cycle Length
65
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
88
Coordination definitely recommended
Link: Belt Line Road, SH 183 EBFR to Willow Creek Drive
Variable
Value
Comments
Travel Time (s)
14
Travel Time okay For Coordination
CF1
87
Traffic / Storage Space
063
Storage Space is adequate
CF2
63
Proportion of Traffic In Platoon
077
Traffic moderately platooned
Ap, platoon adjustment
-3
Main Street Volume (vph)
4070
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
65
at SH 183 EBFR
Cycle Length
80
at Willow Creek Drive
Combined Cycle Length
80
Cycle Length Increase
15
Ac, Cycle Adjustment
-7
CF, Coordinatability Factor
97
Coordination definitely recommended
Synchro 3 Report C'SYNCHRO3 \DA Fa ,, PROJECT\013776 \SATURDAY S'Y
, Sverdrup
Page 14
Coordinatability Analysis Using Current Cycle Lengths. March 18, 1997
Link: Belt Line Road, Willow Creek Drive to Pioneer Drive
r--
Variable
Value
Comments
Travel Time (s)
31
Travel Time okay For Coordination
CF1
64
Traffic / Storage Space
0.21
Storage Space is adequate
CF2
21
Proportion of Traffic In Platoon
085
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3670
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
80
at Willow Creek Drive
Cycle Length
75
at Pioneer Drive
Combined Cycle Length
80
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
84
Coordination definitely recommended
Link. Belt Line Road, Pioneer Drive to Conflans Road
Variable
Value
Comments
Travel Time (s)
47
Travel Time okay For Coordination
CF1
43
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Proportion of Traffic In Platoon
086
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
2
Main Street Volume (vph)
3268
High Volumes, coordination is high priority
Av, volume adjustment
20
Cycle Length
75
at Pioneer Drive
Cycle Length
70
at Conflans Road
Combined Cycle Length
75
Cycle Length Increase
5
Ac, Cycle Adjustment
-2
CF, Coordinatability Factor
63
Coordination probably recommended
Synchro 3 Report C " FAIPROJECT1013776\SA rURDAY1001 S 5
Sverdrup
Page 15
Coordinatability Analysis Using Current Cycle Lengths March 18, 1997
Link: Belt Line Road, Conflans Road to Rock Island Road
Variable
Value
Comments
Travel Time (s)
44
Travel Time okay For Coordination
CF1
47
Storage Space is adequate
Traffic / Storage Space
Oil
Storage Space is adequate
CF2
11
Traffic heavily platooned, coordination is appropriate
Proportion of Traffic In Platoon
089
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
4
High Volumes, coordination is high priority
Main Street Volume (vph)
2443
High Volumes, coordination is high priority
Av, volume adjustment
20
at Rock Island Road
Cycle Length
70
at Conflans Road
Cycle Length
90
at Rock Island Road
Combined Cycle Length
90
Cycle Length Increase
20
Moderate increase in cycle length
Ac, Cycle Adjustment
-10
Coordination definitely not recommended
CF, Coordinatability Factor
61
Coordination probably recommended
Link: Belt Line Road, Rock Island Road to Shady Grove Road
Value Comments
Travel Time (s)
74
Travel Time okay For Coordination
CF1
8
Traffic / Storage Space
007
Storage Space is adequate
CF2
7
Proportion of Traffic In Platoon
082
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
0
Main Street Volume (vph)
2063
High Volumes, coordination is high priority
Av, volume adjustment
19
Cycle Length
90
at Rock Island Road
Cycle Length
100
at Shady Grove Road
Combined Cycle Length
100
Cycle Length Increase
10
Ac, Cycle Adjustment
-5
CF, Coordinatability Factor
22
Coordination definitely not recommended
Synchro 3 Report C SYNCHRO3\ DATA , PR(�JE,CT1013776 \SATURDAY\001 SY5
Sverdrup
Page 16
Coordinatability Analysis Using Current Cycle Lengths. March 18,1997
Link: Belt Line Road, Shady Grove Road to Oakdale Road
Variable
Travel Time (s)
65
Travel Time okay For Coordination
CF1
20
Traffic / Storage Space
005
Storage Space is adequate
CF2
5
Proportion of Traffic In Platoon
095
Traffic heavily platooned, coordination is appropriate
Ap, platoon adjustment
7
Main Street Volume (vph)
1763
High Volumes, coordination is high priority
Av, volume adjustment
16
Cycle Length
100
at Shady Grove Road
Cycle Length
65
at Oakdale Road
Combined Cycle Length
100
Cycle Length Increase
35
Moderate increase in cycle length
Ac, Cycle Adjustment
-17
CF, Coordinatability Factor
26
Coordination definitely not recommended
Synchro 3 Report C , SYNCH R03 1DATATROJECT1013776\SATURDAI ,001 SY5
Sverdrup Page 17