ST0004(2006)-CN060523 May 19, 2006 Sam L. Garrett Advanced Paving Company 2257 Joe Field Road Dallas, TX 75229 RE: Freeport Parkway Reconstruction Project # ST 00-04 '2006' Change Order #1 Dear Mr. Garrett: Attached are three original Charge Order #1 documents for the referenced project. These documents make official the material and quantity changes already agreed to prior to the start of the job. This change also includes an additional three weeks of contract time per your recent request. With this additional time your completion date will be June 10, 2006. Please execute the documents and return two of the originals to me. One of the original Change Order #1 documents is for your file. If you have any questions or need any additional information please feel free to contact Rick O'Dell, Construction Inspector at (972) 304-7090. Sincerely, Keith R. Marvin, P.E. Assistant City Engineer Office 972/304-3679 Fax 972/304-7041 cc: Rick O'Dell, Construction Inspector CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT Freeport Parkway Reconstruction Project # ST 00- 04'2006' CONTRACTOR Advanced Paving Company OWNER. City of Coppell CHANGE ORDER NO One (1) DATE May 17, 2006 Item Description Quantity Unit Unit Price Total COST I -2 Remove & Replace 8" 40,000 SF 50 ($20,000 00) REDUCTION: Concrete Paving (Due to Change in Material) ADD- I -2 Remove & Replace 8" 3,047 SF 700 21,329 00 C oncrete Paving DECREASE I -3 Construct Monolithic 192 LF 1124 ($2,15808) Concrete Curb Total Revision to Contract Amount Change Ord. #1 ($829.08) Previous contract amount $419,616.00 Net Decrease in contract amount ( 829.08) Revised contract amount $418,786.92 Net increase in contract time of completion 21 Day Revised Contract time of completion 61 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. S•1�•b ,q,ii Griffin, P E, City Engineer Date Acce y Ji itt, City ager Date iJ Agreed t by Paving Company Date Paee 1 of 1 Ir lr I� I V C 0 Profess4riaft An Pawuig Cons1pidm n 8 Repai April 10, 2006 Keith Marvin Engineer City of Coppell 255 Parkway Coppell, TX 75019 Project. Freeport Parkway Repairs ADDITIONAL REPAIRS Re April 5, 2006 REDUCTION - Street Repairs Not in the Contract ADD -ON REPAIRS ARE NUMBERED IN A #300 SERIES #311 10X40 = 400 #312 20X21 = 420 REDUCED #313 10X20 = 200 #314 10X20 = 200 Approximately Less Misc. In contract Balance of Additional Repairs SIZE S F #295 10X12 = 120 #296 10X12 = 120 #297 10X12 = 120 #299 12X20 = 240 #300 12X20 = 240 #301 20X21 = 420 REDUCED #302 20X21 = 420 REDUCED #303 12X20 = 240 #304 20X21 = 420 REDUCED #305 12X20 = 240 #306 12X20 = 240 #307 12X20 = 240 #308 12X20 = 240 #309 12X20 = 240 #311 10X40 = 400 #312 20X21 = 420 REDUCED #313 10X20 = 200 #314 10X20 = 200 Approximately Less Misc. In contract Balance of Additional Repairs 40,000 SF Remove and replace 8" of concrete @ $ 7.00 1SF 3,047 SF Additional 8" concrete repairs @ $ 7.00 /SF Total for Contract Item # 1 -2 SUB TOTAL: Less Curb Reduction 192/LF @ $ 11.24 /LF Combined Total: Les Rogers 2257 Joe Field Road, Dallas, TX 75299 cell 214 - 325 -4317 $ 280,000.00 8 21.329.00 $ 301,329.00 $ 1,329.00 $ 2,158.00 < $ 829.00 > 972 - 245 -0000 fax: 972 - 247 -2011 SF #315 10X20 = 200 #316 10X20 = 200 #317 10X20 = 200 #318 10X40 = 400 #320 16X16 = Nose DELETED #320 curb 3 0 LF #321 2X20 = median DELETED #322 10X20 = 200 #323 10X20 = 200 #325 2X20 = median DELETED #326 5X20 = 100 #327 5X20 = 100 #328 5X 6 = 30 REDUCED #329 6X12 = 72 #330 16X16 = Nose DELETED #331 11X12 = 132 + 6594 SF < 3567 > 3,047 40,000 SF Remove and replace 8" of concrete @ $ 7.00 1SF 3,047 SF Additional 8" concrete repairs @ $ 7.00 /SF Total for Contract Item # 1 -2 SUB TOTAL: Less Curb Reduction 192/LF @ $ 11.24 /LF Combined Total: Les Rogers 2257 Joe Field Road, Dallas, TX 75299 cell 214 - 325 -4317 $ 280,000.00 8 21.329.00 $ 301,329.00 $ 1,329.00 $ 2,158.00 < $ 829.00 > 972 - 245 -0000 fax: 972 - 247 -2011 City of Coppell / Freeport Pkwy. REDUCTION OF REPAIRS WITHIN THE EXISTING CONTRACT STREET REPAIRS #121 < - 209 > #124 < - 88 > #126 < - 309 > #127 < - 904 > #128 < - 1087 > #214 < - 56 > #217 < 894 > REDUCE by 3547 SF 43,047 SF STREET REPAIRS CURB REDUCTIONS #125 + 60 #127 + 17 LF INCREASE by 60 SF INCREASE by 17 LF STREET CURB Contract Total with Misc. included 40,000 SF 2,180 LF Less Reductions < - 3.547 > < - 209 > NEW ADDITIONS / # 300's. 6,594 17 LF Combined Total Net ADDITIONS: Les Rogers cell: 214 - 325 -4317 CURB REDUCTIONS #120 < - 125 > #124 < - 0 > #126 < - 31 > #128 < - 21 > #217 < - 32 > REDUCE by 209 LF 1988 LF P.2 3,047 SF < - 192 > LF 2257 Joe Field Road, Dallas, TX 75299 972 -245 -0000 fax: 972-247-2011