May 23, 2006
Darnel Heischman, P E
Dowdy, Anderson & Associates, Inc
522 Village Creek Drive, Suite 200
Plano, TX 75093
RE: MacArthur Vtsta Center, Lot 1, Block A
Fee Assessment Letter
Dear Mr Hetschman
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
.T'lease make payment for the Impact Fees to the City of Coppell in the amount of $0.00 and forward to the
Engineering Department along with a copy of the Fee Assessment table Thrs amount rs a portion of the
assessed fees that need to be paid prior to filing of the f nal plat. Please note that the Texas Legislature,
under Senate Brll 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a
Building Permit Please provide a copy of the Engineer's estimate or contract to our office so the 2°'° &
4% construction inspection fee can be verified The construction inspection fees must be pard prior to the
scheduled pre-construction meeting
The additional fees for water and sewer taps, water meters, and utilrt} inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S Coppell Road Meters ~-~rll be ordered
when those fees are paid
Appropriate navment of the required fees ~~~ill help inure a ~neceesfill tlep1nn111P ~f this 7~rniec-t V~'e lnc,k
for~~~ard to working with }ou on this project. If you have any questions please contact me
Sincerely.
Kenneth M riff n, F' E
Director of Engnleering/Public Works
cc Jemufer Armstrong, Finance Director
Mary Beth ~pletzer, Administrati~-e Secretar} Building Inspections
Glenn Hollowell Assistant Director ol~Pul,lie, Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation _
~tfen Hinckley, L1nr~est Properties, Inc ~~})(~ ,~j/,Z~~G~
zsS °F• Rh L^ 4Y y[ F i~ Einx 9a-'Ei * ,. OFF-[ LI i x ' S~ ~ + iL .. ~ ~~~ 2.. * Fo • y ~ "~~4 3E~"~
DEVELOPMENT FEE TABLE
Project: MacArthur Vista Center, Lot 1, Block A
Date: 5/l9/2006
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $6,300 00
(100% due at Issuance of Buildtng Permit)
Water Tap Inspection Fee $100 00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $204 34
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Firelme) $62 74
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30 00
(100% due at Issuance of Water Meter)
Irrigation/Firelme Meter Deposit $30 00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,797 00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50 00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50 00
(100% due at Issuance of Building Permit)
Park Fee $0 00 $0 00
(100% due prior to F~lmg Plat)
Roadway Impact Fee $0 00 $0 00
(100% due prior to F~l~ng Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100° ~ due prior to Start of Construction)
TOTAL $1 1,624 08
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0 00
DEVELOPMENT FEE WORKSHEET
PROJECT: MacArthur Vista Center, Lot 1, Block A
DATE 5/19/2006
Water Impact Fee:
Domestic Meter(s) 1 - 2 inch
Irrigation Meter(s) 1 - 1 inch
0
Fireline Meter(s)
0
= 5 33 ESU's
= 167 ESU's
= 0 ESU's
= 0 ESU's
Total #• 7 ESU's @ $900 00 ea $6,300 00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #• 2 Connections @ $50 00 ea $100 00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #• 1 Domestic Meter(s) @ $204 34 $204 34
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #~ 1 Irrigation Meter(s) @ $62 74 $62 74
Total #~ 0 Additional Irrigation Meter(s) @ $0 00 $0 00
Total #• 0 Fireline Meter(s) @ $0 00 $0 00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #• 1 Meter(s) @ $30 00 ea $30 00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #• 1 Meter(s) @ $30 00 ea $30 00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's 5 33 @ $900 00 ea $4,797 00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #• 1 Connections @ $50 00 ea $50 00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All deg elopments):
Total #~ 1 Lots @ $50 00 ea $50 00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0 Single-family @ $0 00 per lot $0 00
0 Multi-family @ $0 00 per unit $0 00
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $0 00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way Information not Available
This fee cannot be assessed until after T U Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292 60 per light will be assessed
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: MacAr1/rur Vista Center/Lot I, Block A
DATE. 5/19/2006
ROADWAY IMPACT FEE.
Service Area * 1
Category ** Retail/Commercial
Land Use ** Commercial Others Not S ecified
Building Area (sf) 5,000
Development Units ** 5 00
Vehicle Miles per Development Umt ** 7.92
Category ** Office
Land Use ** General Office Buildin
Budding Area (sf) 2,500
Development Units ** 2.50
Vehicle Miles per Development Umt ** 7 15
Category ** Office
Land Use ** Med~cal!Dental Office
Building Area (sf) 2,500
Development Umts ** 2.50
Vehicle Miles per Development Unit ** 17 86
Fee per Vehicle Mile *** $] 50
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Un-t) x (Fee per Vehicle Mile} _ $15,318 75
* (Figure 4 1 -Roadway Impact Fee Study)
** (Table 4 10 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -The Master Fee Schedule)
Percent of Credit Toward Roadway Impact Fees 100°~°
Total Credit $15,3 18 75
AMOUNT DULc. $Oa1o
** 100°r° credit due to Umvest Agreement.