Loading...
ST9904-CS060110121 114 MaJor Investment Study TOpiC ~. ~" ,. 1 ~,, Technical Committee Meeting # 74 City of Grapevine City Hall 200 South Main Street Grapevine, Texas AGENDA Tuesday January 10, 2006 10:00 AM Welcome and Introduction Curtis Loftis Alternative Analysis Results Phil Ullman Consensus Alternative Phil Ullman What's NextiSchedule Curtis Loftis Discussion Curtis Loftis Adjourn Texas Department of Transportation TxDOT HDR HDR TxDOT TxDOT +, pb c .~ r+, / ~ ~"'~r,.~,~~ of r -.~ 'X w e _ i ~,~ 11 '~ ..~ .~ _...*^ r L } (~ ~ f ~ 121 114 MEETING SUMMARY Mayor Investment Study Technical Committee Meeting #14 Date/Time January 10, 2006 10 00 AM Location. City of Grapevine City Hall, Grapevine, Texas Attendees. See Attached Sign-in Sheet Texas Department of Transportation The following summary is not intended to be a verbatim transcript of the above-mentioned meeting. It is only to serve as a summary of the topics discussed and the major points identified. Please review the contents of the summary and notify Phil Ullman with HDR Engineering (ph. (972) 960-4480) if there are any questions or additions necessary All comments must be received by February 28, 2006 in order to be included in the final summary INTRODUCTION Curtis Loftis (TxDOT-Fort Worth) opened the meeting by welcoming the committee members and then asked everyone to introduce themselves The purpose of the meeting was to update the committee where the project is at now and to view and discuss the proposed project layout. Phil Ullman later discussed in detail the current ramping and freeway layout. RECOMMENDED PLAN Phil went through and summarized the recommended ramp locations throughout the project. The ramping scheme presented recommended a limited number of ramps to reduce driver confusion. These recommendations were based on the results of traffic analysis performed using a behavioral traffic modeling software (VISSIM) and past Technical Advisory Committee inputs. Overall, the plan was accepted for presentation to the Public for the planned February 23, 2006 Public meeting. HDR was asked to further analyze three separate areas in the study project: the FM 1709 alignment and intersection, the Sandy Lake ramp and intersection, and possible traffic weaving concerns at D/FW airport. • The FM 1709 alignment and intersection require further evaluation. This includes further analysis of the FM 1709 intersection, Bank St, and Gateway Dr to better handle the traffic movements • Changes to the Sandy Lake alignment were requested to minimize additional R.O W impacts In addition, further review of the Sandy Lake exit location and a feasibility report on a direct connector from IH 635 to Sandy Lake were requested. • D/FW Airport had concerns of possible traffic weaving problems due to the close proximity of the airport entrance ramp and the short distance to the toll booths. This will require further evaluation. SCHEDULE Phil concluded the presentation with a brief list of upcoming milestones, including a public meeting on February 23, 2006 and public hearing late 2006, schematic developments, agency review of schematics, and a FONSI scheduled for early 2007 A traffic behavioral analysis is also being performed on the project with results to be presented at an upcoming Technical Advisory Meeting. The Technical meeting was then adjourned officially Page 1 of 2 MEETING ATTENDEES Jerry Hodge Crty of Grapevine Stan Laster City of Grapevine Matt SmgletonCity of Grapevine Charlie Thomas City of Southlake Ken Baker Ctty of Southlake Clayton Redmger Ctty of Southlake Ken Griffin City of Coppell Keith Marvin City of Coppell Anita Wilson FHWA Keith Wilschetz D/FW Airport Stan Hall TxDOT -Dallas Naser Askari TxDOT -Dallas Curtis Hanan TxDOT - Ft Worth Curtis Loftin TxDOT - Ft Worth - Project Manager David Cowley Fort Worth Transportation Authority Jeff Neal NCTCOG Abdul Quddus WSA /Traffic Consultant for TxDOT Phil Ullman HDR Engineering / Project Consultant for TxDOT Jennifer Scholz HDR Engineering / Project Consultant for TxDOT Brian Swindell HDR Engineering / Project Consultant for TxDOT Page 2 of 2