Freeport NIP(8.1)-LR060322'Bone Engineerin
Client: Duke Construction LP
Mr Bruce Barclay
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project:
Services:
Page 1 of 2
Freeport XIV XV
800 700 W Bethel Road
Coppell, Texas
Reinforcing Steel Inspection
Technician Time: 1 30pm 3 OOpm
Technician: .Timmy Hall
Report Distribution:
(1) Duke Construction LP
(I) Exiranet
(1) Pond, Robinson Associates
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
7701 W Little York, Ste 600, Houston, TX 77040
Corporate Phone: (214) 630 -9745
REPORT OF REINFORCING STEEL INSPECTION
Report of Inspection
Report No.•
Project No_:
Date of Service:
Report Date:
252779
0510795
03/16/2006
03/22/2006
On this date, a Rone Engineering Services, Ltd. representative(s) arrived on site
as scheduled to perform Reinforcing Steel Inspection The results are attached
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, etc or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports arc
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd
99TM
Items Inspected:
Conforming
Nun
Unitortnmg
Hems inspected:
Conforming
x
Non
Lon:orrnmg
Hems Inspected:
Column 1 tes Properly
Tied and Spaced
Conforming
NA
Non
a.ontormmg
'Placing Drawings
Approved
x
Bar Length
and Shope
Bar Size
x
Proper Bar Placement
x
Stirrup Spacing
NA
Bar Grade
x
Properly Tied
x
Stirrup Type
NA
Bars Clean
x
Dowel Bars in Place
x
Lapped Splices
x
Form Clean
x
Proper Bar Supports
x
Conies Bars
NA
Number of Bus
x
Proper Cover
x
Mechanical Splices
NA
Rohe E gineering
Client: Duke Construction, LP
Project: Freeport XIV XV Date of Service 3/16/2006
Page 2 of 2
Locations and Items Inspected• Paving, east and west side of Buildings 14 and 15
Discrepancies Comments
Report of
Reinforcing Steel Inspection
Report No. 252779
Project No 0510795
1 No steel chairs.
2. No dowel covers.
Discrepancies noted above were corrected prior to
concrete placement.
Inspector's Signature
Client/Contractor Signature.
Client/Contractor Copies with Results Yes No
8908 Ambassador Row, Dallas, IX 75247
2696 Gravel Drive, Fort Worth, IX 76118
7701 W little York, Suite 600, Houston 77040
Corporate Phone: (214) 630 -9745
LIMITATIONS. The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition
appearance penormance. etc.) or any other lcature o1 nmdar subject matter provided by persons or conditions over which we have no control Our letters and reports are tot the excttstve
use of the chests to whom they are addressed and shall not be reproduced except In lull without the wnnen approval or Kane bngmeenng Services. ltd.