Loading...
Freeport NIP(8.1)-LR060310Rune Engineering Client: Duke Construction LP Mr Bruce Barclay 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Services: On this date, a Rone Engineering Services, Ltd representative(s) arrived on site as scheduled to perform Reinforcing Steel Inspection The results are attached. Technician Time Page 1 of 2 Freeport XIV XV 800 700 W Bethel Road Coppell, Texas Reinforcing Steel Inspection Technician Jimmy Hall Report Distribution: (1) Duke Construction LP (1) Extranet (1) Pond, Robinson Associates REPORT OF REINFORCING STEEL INSPECTION 12 OOam 1 15am Report of Inspection 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 Report No.: Project No.: Date of Service: Report Date: 252140 0510795 03/06/2006 03/10/2006 i( Scott Watson, AET CMT Operations Manager LIMITAIIONS The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 991-M Items Inspected: Conforming Non Lontorrnrng Items Inspected: Conforming Non Lonnormmg Items Inspected: Conforming Non Lonlorming I'locmg Drawings Approved x Bar Length and Shope x Column I ics Properly Tied and Spaced NA Bar Size x Proper Bar Placement x Stirrup Spacing NA Bar Grade x Properly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place NA Lapped Splices X Form Clean x Proper Bar Supports NA Comer Bars NA Number of Bars z Proper Cover NA Mechonicat Splices NA Rone En ineer n Client: Duke Construction LP Project: Freeport XIV XV Report of Reinforcing Steel Inspection Report No. 252140 Project No.. 0510795 Date of Service 3/6/2006 Page 2 of 2 Locations and Items Inspected Southwest side of Building 14 (approximately 360') and northwest side (approximately 270') Discrepancies Comments. 1 No chairs or dowels on southwest side. 2. No chairs or dowels on northwest side. Discrepancies noted above were corrected prior to concrete placement. Inspector's Signature C11entlContractor Signature Client/Contractor Copies with Results. Yes No 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 4V Little York, Suite 600, Houston 77040 Corporate Phone: (214)630 9745 LIMITATIONS. The test results presented herein were prepared band upon the specific samples provided for testing. We assume no responsibility for variation in quoliry (composition, appearance penonnance etc J or any Other Nature 01 5lmdar subject miner provnded by persons or conditions over ;Nnrh we have no COn110I Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except to lull wrWout the wnnen approval at Ilene 1•ngmeenng Services Ltd.