Freeport NIP(8.1)-LR060309Rone Engineering
Project:
Services:
Page 1 of 2
Client: Duke Construction LP
Mr Bruce Barclay
5495 Belt Line Rd Ste 360
Dallas TX 75254
Freeport XIV XV
800 700 W Bethel Road
Coppell, Texas
Reinforcing Steel inspection
On this date, a Rone Engineering Services, Ltd representative(s) arrived on site
as scheduled to perform Reinforcing Steel Inspection The results are attached
Technician Time
Technician: Jimmy Hall
Report Distribution:
(1) Duke Construction LP
(1) Extranet
(I) Pond, Robinson Associates
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
7701 W Little York, SIc 600, Houston, TX 77040
Corporate Phone: (214) 630 -9745
REPORT OF REINFORCING STEEL INSPECTION
12.00am 2:15am
Report of Inspection
Report No.:
Project No.:
Date of Service:
Report Date:
251859
0510795
03/01/2006
03/09/2006
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd
99 TM
Items Inspected:
Conforming
Non
Lontommng
Items Inspected:
Conforming
Non
uontormrag
Items Inspected:
Conforming
Non
r,7ontormmg
Placing Drawings
Approved
x
Bar Length
and Shape
x
Column ties Properly
Tied and Spaced
NA
Bar Size
x
Proper Bar Placement
x
Stirrup Spacing
NA
Bar Grade
x
Properly Tied
x
Stirrup Type
NA
Bars Clean
x
Dowel Bars in Place
x
Lapped Splices
x
Form Clean
x
Proper Bar Supports
x
Comer Bars
NA
Number of Bars
x
Proper Cover
x
Mechanical Splices
NA
Rone Engineering
Client: Duke Construction LP
Project: Freeport XIV XV Date of Service: 3/1/2006
Page 2 of 2
Locations and Itelns Inspected Northeast side of Building 14, paving (180').
Discrepancies Comments:
Report of
Reinforcing Steel Inspection
Report No.. 251859
Project No 0510795
1. No chairs and dowel covers.
Discrepancies noted above to be corrected prior
to concrete placement.
Inspector's Signature.
Client/Contractor Signature
Client/Contractor Copies with Results Yes No
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort worth, TX 76118
7701 W Little York, Suite 600, Itouston 77040
Corporate Phone: (214) 630 -9745
LIMITATIONS. The test results presnrled herein we1e prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition,
appr_+rancs, performance, etc.) or any other texture of 5lrtaLlf subject made: provided by persons or conditions over which we have no control Utu levers end reports we for ome exclusive
use of the clients to whom they are addressed and shall not be reproduced except m lull w1llxwl the wnhvi approval 01 hone bl5aneettng Services. Lid.