Freeport NIP(8.1)-LR060302'ikone Engineering
lad'
Client: Duke Construction LP
Mr. Bruce Barclay
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project:
Services:
Freeport XIV XV
800 700 W Bethel Road
Coppell, Texas
Reinforcing Steel Inspection
On this date, a Rone Engineering Services, Ltd. representative(s) arrived on site
as scheduled to perform Reinforcing Steel Inspection The results are attached
Technician Time: 12 45am 3:15am
Page 1 of 2
Technician: ,Timmy Hall
Report Distribution:
(1) Duke Construction LP
(1) Extranet
(1) Pond, Robinson Associates
REPORT OF REINFORCING STEEL INSPECTION
Report of Inspection
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
7701 W Little York, Ste 600, Houston, TX 77040
Corporate Phone: (214) 630 -9745
Report No.:
Project No.:
Date of Service:
Report Date:
251762
0510795
02/28/2006
03/02/2006
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented hcrein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Ronc Engineering Services, Ltd
9911H Paec 1 of 1
ilems Inspected:
Conforming
Non
Lontor rang
Items Inspected:
Conforming
Non
t..ontoamtng
Items Inspected:
Conforming
Non
Lontormulg
Placing Drawings
Approved
x
lint Length
and Shape
x
Column 1 les Properly
Tied and Spaced
NA
Bar Sire
x
Proper Bar Placement
x
Stirrup Spacing
NA
Bar Gordo
x
Properly Ticd
x
Stirrup Type
NA
Bars Clean
x
Dowel Bars in Place
x
Lapped Splices
x
Form CIcw,
x
Proper Bar Supports
x
Comer Bus
NA
Number ofBars
x
Proper Cover
x
Mechanical Splices
NA
one Engineering
Discrepancies Comments:
Project: Freeport XIV XV
Client: Duke Construction LP
Locations and Items Inspected Northwest side of Building 14, south side of fire lane.
1 No dowel covers.
2. Dowels in existin
3. No chairs.
concrete placement.
aving are not there.
Discrepancies noted above were corrected prior to
Inspector's Signature
Client/Contractor Signature
Client/Contractor Copies with Results Yes No
8908 Ambassador Row, Dallas, IX 75247
2696 Gravel Drive, Fort North, TX 76118
7701 W Little York, Suite 600, Houston 77040
Corporate Phone: (214) 630 -9745
Report of
Reinforcing Steel Inspection
Report No 251762
Project No 0510795
Date of Service. 2/28/2006
Page 2 of 2
LIMITATIONS. The test results presented herein were prepared based upon the specific samples provided for Testing. We assume no responsibility for variation in quality (composition.
appearance, performance. etc l or any outer leature of ,,nular subject manor provxled try persons or conmtroru over which we have no control Ihtr cotters and reports ale for are exclusive
use of the clients to whom they are addressed and shall not be reproduced except u, tall 0,dtout the written approval o1 Kane tngmeeang Services. Ltd