Loading...
Freeport NIP(8.1)-LR060302'ikone Engineering lad' Client: Duke Construction LP Mr. Bruce Barclay 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Services: Freeport XIV XV 800 700 W Bethel Road Coppell, Texas Reinforcing Steel Inspection On this date, a Rone Engineering Services, Ltd. representative(s) arrived on site as scheduled to perform Reinforcing Steel Inspection The results are attached Technician Time: 12 45am 3:15am Page 1 of 2 Technician: ,Timmy Hall Report Distribution: (1) Duke Construction LP (1) Extranet (1) Pond, Robinson Associates REPORT OF REINFORCING STEEL INSPECTION Report of Inspection 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 Report No.: Project No.: Date of Service: Report Date: 251762 0510795 02/28/2006 03/02/2006 K. Scott Watson, AET CMT Operations Manager LIMITATIONS: The test results presented hcrein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Ronc Engineering Services, Ltd 9911H Paec 1 of 1 ilems Inspected: Conforming Non Lontor rang Items Inspected: Conforming Non t..ontoamtng Items Inspected: Conforming Non Lontormulg Placing Drawings Approved x lint Length and Shape x Column 1 les Properly Tied and Spaced NA Bar Sire x Proper Bar Placement x Stirrup Spacing NA Bar Gordo x Properly Ticd x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form CIcw, x Proper Bar Supports x Comer Bus NA Number ofBars x Proper Cover x Mechanical Splices NA one Engineering Discrepancies Comments: Project: Freeport XIV XV Client: Duke Construction LP Locations and Items Inspected Northwest side of Building 14, south side of fire lane. 1 No dowel covers. 2. Dowels in existin 3. No chairs. concrete placement. aving are not there. Discrepancies noted above were corrected prior to Inspector's Signature Client/Contractor Signature Client/Contractor Copies with Results Yes No 8908 Ambassador Row, Dallas, IX 75247 2696 Gravel Drive, Fort North, TX 76118 7701 W Little York, Suite 600, Houston 77040 Corporate Phone: (214) 630 -9745 Report of Reinforcing Steel Inspection Report No 251762 Project No 0510795 Date of Service. 2/28/2006 Page 2 of 2 LIMITATIONS. The test results presented herein were prepared based upon the specific samples provided for Testing. We assume no responsibility for variation in quality (composition. appearance, performance. etc l or any outer leature of ,,nular subject manor provxled try persons or conmtroru over which we have no control Ihtr cotters and reports ale for are exclusive use of the clients to whom they are addressed and shall not be reproduced except u, tall 0,dtout the written approval o1 Kane tngmeeang Services. Ltd