Freeport NIP(8.1)-LR060213Rone Engineering
Project:
Services:
Page 1 of 2
Technician: Nathan Witherell
Report Distribution
(1) Duke Construction LP
(1) Extranet
Client: Duke Construction LP
Mr Bruce Barclay
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Freeport XIV XV
800 700 W Bethel Road
Coppell, Texas
Reinforcing Steel Inspection
Technician Time 3 OOam 4 OOam
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
7701 W Little York, Ste 600, Houston, TX 77040
Corporate Phone: (214) 630 -9745
REPORT OF REINFORCING STEEL INSPECTION
Report of Inspection
Report No.:
Project No.:
Date of Service:
Report Date:
250473
0510795
02/06/2006
02/13/2006
On this date, a Rone Engineering Services, Ltd representative(s) arrived on site
as scheduled to perform Reinforcing Steel Inspection The results are attached
K. Scott Watson, AET
CMT Operations Manager
LIMITAIIONS• The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, etc or any otter feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd
99TM Page 1 of 1
Items Inspected:
Conforming
an
t.ontormmg
Items Inspected:
Conforming
Non
t.onlornung
Items Inspected:
Conforming
Non
t..ontormsttg
Placing
Approval
x
Bar Length
and Shape
x
Column I tes Properly
Tied and Spaced
NA
Bar Size
x
Proper Bar Placement
x
Stirrup Sparing
NA
Bar Grade
x
Properly Tied
x
Stirrup Type
NA
Bars Clean
Note 1
Dowel Bars in Place
x
Lapped Splices
x
Farm Clean
x
Proper Bar Supports
5
Comer Bon
NA
Number of Bars
x
Proper Cover
Note 2
Mechanical Splices
NA
done Engineering
Client: Duke Construction LP
Report of
Reinforcing Steel Inspection
Report No 250473
Project No. 0510795
Project: Freeport XIV XV Date of Service: 2/6/2006
Page 2
Locations and Items Inspected North side paving (south half), Building XV
Discrepancies Comments: 1 Mud on reinforcing steel in multiple sections throughout
placement.
2. No reinforcing steel chairs in place.
Discrepancies noted above were corrected prior
to concrete placement.
Inspector's Signature
Client/Contractor Signature:
Client/Contractor Copies with Results: Yes No
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, port Worth, IX 76118
7701 W Little York, Suite 600, Houston 77040
Corporate Phone: (2I4) 630 -9745
2
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibly for varierian in quality (composition
appearance. performance. etc.) or any other feature otsimdar subject mailer provided by persons or condemns over Much we have no control. Uur feners and reports are for ere exclusive
use of the clients ro whom they ere odoressed and shalt not be reproduced except in lull without the written approval of }tone t:nyneenng Serous, lad.