Loading...
Freeport NIP(8.1)-LR060105;-:"?.one Engineering R Client: Duke Construction LP Mr Bruce Barclay 5495 Belt Line Rd_, Ste 360 Dallas TX 75254 Project: Services: TEST NO Freeport XIV XV 800 700 W Bethel Road Coppell, Texas Perform In -Place Density rest in accordance with ASTM Standards CONTRACTOR: Duke Construction, L.P Test Methods: ASTM D -2922 ASTM D -3017 NUD No Description 1 Dark Brown Sandy Silty Clay 2 Dark Brown Silty Clay 3 Lime Treated Dark. Brown Clay TEST LOCATION Utility 1 Building 14, plumbing line, 50' east of west end, 2nd lift Utility 2 Building 14, plumbing line, 100' east of west end, final Utility 3 North water line, 50' east of west end, 3' below grade Utility PROJECT DATA Gauge: Troxler 34 11-B Gauge Serial No: 4645 Test Mode: DT MOISTURE DENSITY RELATIONS Maximum Project Requirements Moisture Density pcf Moisture Density 18.5 21.5 29.5 FIELD DENSITYJESTS PROBE M/D DEPTH No, 6 6" 3 6" 1 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, IX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING 105.0 101 0 91.5 Report No Project No.: Date of Service: Report Date: 248148 0510795 12/30 /2005 01/05/2006 Standard Counts Moisture Density Current: 572 Previous: 564 190 30 0 19.5 Optimum +4 Optimum +4 Optimum +4 121.9 114.3 123 1 Current: 17I0 Previous: 1664 MOISTURE WET DENSITY DRY DENSITY DENSITY (pct) (pct) max) 102.4 879 103 0 95 min 95 min 95 min 98 96 98 LIMI- AT70NS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, L•td 07T TI Page 1 of 2 Report No. 248148 ProjectNn.• 0510795 TEST NO TEST LOCATION Client: Duke Construction LP 4 North water line, 150' east of west end, 3' below grade Technician. Jason Bartholomew started: 12:OOp Report Distribution: (I) Duke Construction LP (1) Extranet PROBE M/D DEPTH No 6" 1 20.2 Test results on this report meet project specification, Finished: 1 45pm MOISTURE WET DENSITY DRY DENSITY (Pet) (pc0 122.7 102.1 K. Scott Watson,.AET CMT Operations Manager DENSITY max) 97 LIIvnrA noNs. The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced d of 2 except in full without the written approval of Rone Engineering Services, Ltd )7TM