DR0601-CS060511MEMORANDUM TO: Jim Witt, City Manager FROM: Keith Marvin, P.E., Assistant City Engineer '�t VIA: Ken Griffin, P E , Director of Engineering and Public Works DATE: May 11, 2006 REF: Consider awarding Bid/Contract # Q- 0406 -01 to Ed A. Wilson, Inc. for the construction of the MacArthur Blvd. / Cribbs Dr. Drainage Project, in an amount of $47,820, as provided for in Drainage Utility District funds. On May 4, 2006 the City of Coppell received and opened four bids for the construction of the MacArthur Blvd. / Cribbs Dr Drainage Project. This project provides for the installation of approximately 168 linear feet of slotted drain and one inlet intended to alleviate nuisance storm water that ponds at the named intersection. Refer to the attached exhibit for the limits of construction. The bids on this project ranged from a low bid of $47,820 00 to a high bid of $78,700 00. Ed A. Wilson, Inc submitted the low bid on the project. This contractor has bid on various projects in the City of Coppell, but they have never submitted the lowest successful bid. They were, however, able to supply references from several municipalities in the Metroplex for work of magnitude comparable to this project. Correspondence with those references was favorable and indicated this contractor is highly capable of completing the project on time and within budget. The Engineering department completed the design for this project in house and our estimate was $42,911 Staff recommends award of the contract for the MacArthur Blvd. / Cribbs Dr Drainage Project to Ed A. Wilson, Inc , in the amount of $47,820 00, with an estimated completion time of 45 calendar days. If you have any questions, please give me a call at 972/304 -3679. BID TABULATION: MACARTHUR BLVD. / CRIBBS DR. DRAINAGE PROJECT # DR 06 -01 Item Quantity Unit Description Engineer s Estimate Total Price Ed A. Wilson Humphrey & Morton J.T Dersner North Texas Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 -1 1 LS Traffic Control $5000 5,000.00 5,000.00 3,210.00 3,210.00 10,000.00 10,000.00 8.000.00 8,000.00 1 -2 97 Sy Remove & Dispose of Existing Concrete Paving $2,910 30.00 2,910.00 27.00 2,619.00 35.00 3,395.00 100.00 9,700.00 1 -3 50 LF Furnish & Install 18" Class IV RCP $4,000 125.00 6,250.00 111.00 5,550.00 175.00 8,750.00 80.00 4,000.00 I 4 1 EA Construct 2-Grate Inlet $8,500 4,500.00 4,500.00 2,600.00 2,600.00 4,500.00 4,500.00 3,000.00 3,000.00 I -5 168 LF Furnish & Install 18" Slotted Drain $10,920 125.00 21,000.00 161.00 27,048.00 250.00 42,000.00 230.00 38,640.00 I -6 96 S Construct Concrete Pavement w /Integral Curb $7680 85.00 8,160.00 83.00 7,968.00 85.00 8,160.00 160.00 15,360 00 31 Calendar Days 45 N/A 60 TOTAL $ 42,911 $47,820.00 $48,99500 $76,805 00 $78,70000