Loading...
WA9701-CS060524May 25 06 08:21a O P1 , MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Rick O' Dell, Construction Inspector Engineering From: Derrick Thomas, Streets Division Public Works Date May 24, 2006 RE: Walk -thru Belthue /Denton Tap 16" Water Line PAVING 1. Bethel /Denton Tap cracked concrete in median nose. 2. Concrete patch south of Bethel on west side needs saw cuts and seal. 3 Signal boxes in medians are broken and full of dirt (Bethel to Southwestern /Beltline). 4 Sinking concrete in median nose west of Pecan Creek Nursery. 5. Median nose north of train tracks across from Dickey' s has cracks. 6. Crack in median nose near Bloom Embroidery 7. Approach to " The Mercantile" needs seal around edges surrounding the manholes. S Clean debris at southwest corner p.1 CITY OF COPPELL PUBLIC WORKS DEP4RTA1F_NT T M E G 1 T Y O F COPPELL F - 9 MEMORANDUM TO- Rick O'Dell FROM: Ernest Powell, Utilities DATE; May 24, 2006 REF: 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 WA97 -01 Belt Line / Denton Tap 16" water line Station 3900 needs marking on west curb, south of Bethel Road, 50' from intersection 8" water line First valve at Denton Tap and Bethel needs extension reset Second valve needs to have extension reset First fire hydrant needs marking to be in red First fire hydrant need valve extension reset Station 36 93, second fire hydrant needs markings to be in red Valve needs extension. Lid needs painting. Station 34 12 — fire hydrant valve need extension and needs marking painted. Station 34 12 valve stack not centered. Station 34 12 mark on west side of street — lid needs paint Fourth fire hydrant does not turn easy and extension needs to be reset. Marking needs to be painted red. First air relief needs rampan, concrete around it and markings on both sides — ARV as well as painting on ltd and markings. Station 28 60 needs extension on valves, markings on both sides of curb and paint. Station 26 82 — 8" water line needs marking and paint on both sides of curb Write MLV on curb Station 25 57 — 16" water line needs marking and paint on both sides of curb Wnte MLV on curb Station 24 20 — markings and paint on both sides of curb Station 23 18 — marking and paint on both sides Station 22 49 needs extension, marking on curb and paint Sewer manhole needs rain pan and markings Station 20 34 — fire hydrant — needs extension, markings on both sides of median, paint markings and lid red i-d dga :io 90 � P ew 20 Station 18 06 needs extension, marking on both sides and paint 21 Second air relief valve needs rain pan and concrete, marking with the letters ARV, paint - and the air relief valve in the manhole is holding water - c lVf - elLI 1 e e- 22 Station 16 60 lid need painting and markings need to be cut into street and painted - This valve is on the 8" line 23 The 16" valve off the 24" existing water line needs an extension, lid painted, markings cut in street. Plus the valve stack needs to be straightened. 24 Station 14 55 needs lid and markings painted. 25 Station 11 80 needs lid and marking painted. 26 Station 10 50 needs extension work 27 Valve stack in road no longer exists 28 Station 8 50 needs extension, marking and paint 29 Third our relief valve marking - ARV on curb, rain pan, concrete pad and paint. 30 Station 5 35 needs marking and paint. 31 Fourth air relief valve needs marking, paint, rain pan and concrete pad 32 Station 4 65 needs marking, paint, lid painted 33 Station 1 20 needs marking, paint, lid painted 34 Fire hydrant on Airline, marking and painting � � r (O / N� 35 Station 0 00 - paint l ' After completion of punch list, call 972 -462 -5150 to schedule a follow -up walkthru. T d dLZ:bo 90 ve Rew