Loading...
CF-Justice Center-CS060522 (2) m:>> TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning Memorandum To: Charlene La Mattina, E.I T From: Michael Wilson, P E. cc: Randall Daniel, Stuart Everett Date: 5-22-06 Re: Coppel! Police and Fire Renovation Charlene, Listed below is a memo that addresses the various DRC comments. Comment. Provide only civil portion of plans in future submittals Response Only civil related sheets will be submitted for review In future submittals. 2. Comment. A copy of plat should be submitted with the civil plan set Easements called out should correspond to easements on the plat Otherwise, provide documentation of how easements were dedicated Response Through conversations with Randall Daniel at Brinkley Sargent Architects, the plat is being prepared by Pacheco Koch It was communicated to TNP that the civil portion could be re-submitted while waiting for the plat 3 Comment. Note that paving, in addition to water, drainage and flatwork construction, shall be in accordance with City of Coppell Standard Details. Response Notes have been added on various sheets addressing this comment 4 Comment. How will fire protection and domestic water remain in service during construction? Response It is the intent to have the Contractor make the appropriate connections during non-peak hours in order to limit the disruption to the existing facilities. 5 Comment. Elaborate on how utility lines will be abandoned in the event it is not removed Response All abandoned utility lines shall be drained, filled with grout and plugged at each end This note is included on the applicable sheets in the Plans. 6 Comment. Water mains 10" and smaller shall be PVC A WW A C-900, DR-14, Class 200 Response This comment has been corrected as noted 7 Comment. Show irrigation sleeves on the paving plans. Response Irrigation sleeves are shown on the paving plans as requested 1100 Macon Street Fort Worth, Texas 76102 817336 5773 phone 817336.2813 fax www tnp-online com 8 Comment. Ensure that TCEQ guidelines for separation are met in locations where water and sanitary sewer lines cross. Response The sanitary sewer line has been re-Iocated to provide separation from the proposed water line 9 Comment. All details shown in the construction plans, which are included in the Standard Details, shall be removed from the plans. Response All details that are City Standard Details have been removed from the plans. All marked-up comments on the plans have been addressed Thanks . Page 2