Loading...
Denton Tap 3A-LR060525CLIENT Head Construction, Inc REPORT DATE. 5/25/06 TEST DATE 5/24/06 3030 LBJ, Suite 7000 Dallas, Texas 75234 TEST METHOD.ASTMD -2292 3017 PROJECT Proposed Coppell Monte ri Academy *ASTM D698A See Proctor Report for Details 136 Fitness Court Coppell, Texas Minimum Required Compaction 95% PROJECT 817TXIK5 REPORT 7 PAGE 1 OF 1 ATTN Ken Head SE &T TECHNICIAN: Jude Brignac TEST AREA 4t "Tla w n.. �6't%f FIELD iii e RESULTS eY x+'Pd ua a 8 a.t ..9 LAB RESULTS rf. f a fl a tt�1�R! ..z qqg ■e d �FPk v 4 X x(f Front Driveway East Final 1 112 12 1 113 15 12 -1:/ 99 P Front Driveway Center Final 1 109 13 1 113 15 12-1 96 P Front Driveway West Final 1 111 12 1 113 15 12 -18 98 P I project and we trust that this report is satisfactory Very Truly Yours, SAM Engineering Testing, L P Sadik (SAM) Al- Musawe, M Sc Ph D P E Civil Environmental Engineer Texas Registration Number 61893 SAM ENGINEERING TESTING, L.P. Serving The Geo- Industry Since 1974 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone (972) 790 -1910 FAX (972) 790 -0967 IN -PLACE DENSITY require va unless otherwise note as been a pleasure to serve you on this Materials Testing Geotechnical Environmental G /2005 /817TXIK5 /DENSITY /Den7 Failure Investigation