Denton Tap 3A-LR060525CLIENT Head Construction, Inc REPORT DATE. 5/25/06 TEST DATE 5/24/06
3030 LBJ, Suite 7000
Dallas, Texas 75234 TEST METHOD.ASTMD -2292 3017
PROJECT Proposed Coppell Monte ri Academy *ASTM D698A See Proctor Report for Details
136 Fitness Court
Coppell, Texas Minimum Required Compaction 95%
PROJECT 817TXIK5 REPORT 7 PAGE 1 OF 1
ATTN Ken Head SE &T TECHNICIAN: Jude Brignac
TEST AREA
4t
"Tla w n..
�6't%f
FIELD
iii e
RESULTS
eY
x+'Pd ua a 8
a.t ..9
LAB RESULTS
rf.
f a fl
a tt�1�R!
..z qqg
■e d �FPk
v 4
X x(f
Front Driveway East
Final
1
112
12
1
113
15
12 -1:/
99
P
Front Driveway Center
Final
1
109
13
1
113
15
12-1
96
P
Front Driveway West
Final
1
111
12
1
113
15
12 -18
98
P
I
project and we trust that this report is satisfactory
Very Truly Yours,
SAM Engineering Testing, L P
Sadik (SAM) Al- Musawe, M Sc Ph D P E
Civil Environmental Engineer
Texas Registration Number 61893
SAM ENGINEERING TESTING, L.P.
Serving The Geo- Industry Since 1974
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone (972) 790 -1910 FAX (972) 790 -0967
IN -PLACE DENSITY
require va unless otherwise note
as been a pleasure to serve you on this
Materials
Testing
Geotechnical
Environmental
G /2005 /817TXIK5 /DENSITY /Den7
Failure
Investigation