Loading...
SW0501-AG060523T H E C 1 T Y O F_ DEPT- Engineering AGf �NDA REQUEST FORM COPPELL DATE- May 23, 2006 T a ITEM # 17 /D ITEM CAPTION Consider approval of a resolution authorizing the use of Community Development Block Grant funds from FY 2006 in the - amount of $59,284 for the installation of Americans with Disabilities Act compliant automatic doors at the Coppell Aquatic and Recreation Center and the William T Cozby Public Library, and for the completion of the FY 2005 funded project - Samuel Boulevard Curb Ramps (SW 05 -01), and authorizing the City Manager to execute the necessary documents for such funds, and authorizing the Mayor to sign. APPROVED BY GOAL(S) CITY COUNCIL ON ABOVE DATE 'Motion to Approve Res # 2006 -0523 1 M - Tunnell S - Peters Vote - 6 -0 Hinojosa - Flores absent �' Libby Ball 2006 0525 16.57 40 0500' EXECUTIVE SUMMARY Approval of this agenda item will allow the city to submit an official application to Dallas County to request approval to utilize its allocated FY 2006 Community Development Block Grant (CDBG) funding for the installation of automatic doors at the Coppell Aquatic and Recreation Center and the William T Cozby Public Library, and for the completion of the FY 2005 funded project - Samuel Boulevard Curb Ramps (SW 05 -01) Staff will be available to answer any questions at the Council meeting FINANCIAL COMMENTS Agenda Request Form - Revised 09/04 Document Name #CDBG T H E C I T Y O F tea i MEMORANDUM TO: Mayor and City Council FROM: Kenneth M Griffin, P E, Director of Engineering and Public Works DATE: May 23, 2006 REF: Consider approval of a resolution authorizing the use of Community Development Block Grant funds from FY 2006 in the amount of $59,284 for the installation of Americans with Disabilities Act compliant automatic doors at the Coppell Aquatic and Recreation Center and the William T Cozby Public Library, and for the completion of the FY 2005 funded project - Samuel Boulevard Curb Ramps (SW 05 -01), and authorizing the City Manager to execute the necessary documents for such funds, and authorizing the Mayor to sign. The City of Coppell is eligible to receive $59,824 in FY 2006 CDBG funding from Dallas County on October 1, 2006 The city is interested in utilizing the new FY 2006 funding and is completing the requirements of the allocation process The public meeting for citizen input on possible projects for CDBG FY 2006 funding was held on April 25, 2006 Following the meeting, it was decided that the installation of automatic doors at the Coppell Aquatic and Recreation Center (CARC) and the William T Cozby Public Library would be an appropriate project. The remaining funds from FY 2006 would be used towards the completion of the FY 2005 funded project - Samuel Boulevard Curb Ramps The existing swing, double -doors at the front, front vestibule, back and back vestibule entries to CAR(- meet the American with Disabilities Act (ADA) standards for door opening force required to push or pull a door open However, most of the activities at the center require the individual to have their own exercise and /or swimming equipment Opening these doors while carrying eyiiipment can be difficult for someone with a disability Many of these individuals are seniors and persons in rehabilitation and an automatic door would better meet their needs There is a pair of single -doors at the front entry and a pair of single doors at the vestibule entry to the library One of the single -doors at each of the entries is an ADA compliant, push- button, automatic s%\ mg door The other single -doors are swing doors that also meet ADA standards The automatic doors swing in one direction and have numerous maintenance problems due to children playing with the buttons and the wind catching the front entry door when it is in the process of swinging shut It is no longer economical to maintain the automatic doors at each of the entries and they need to be replaced with another type of automatic door system The existing double -doors at the front, front vestibule, back and back vestibule entrees to CARC will be removed and replaced with a biparting automatic sliding door system The pair of single -doors at the front entry and the pair of single -doors at the vestibule entry to the library will be removed and replaced with a biparting automatic sliding door system. All of the door systems at both facilities will have two -way motion sensors, dual safety beams, and threshold presence sensors Providing ADA compliant, automatic doors at CARC and the library will benefit the entire city The estimated cost for the development of the bid specifications, removal of the existing doors, and the installation of biparting automatic sliding door systems at the CARC and library is $53,668 00 This leaves $5,616 00 remaining in FY 2006 funding that we will request to be added to the FY 2005 funds for the completion of the Samuel Boulevard Curb Ramps project. The estimated cost for the design survey and construction of the Samuel Boulevard Curb Ramps project was $72,205 00 The city has FY 2005 funds in the amount of $72,379 68 Increased surveying costs, and the Texas Department of Licensing and Regulation requirements have increased the estimated cost of the project to $77,165 00 The Project /Activity Application for each project along with a resolution authorizing the submission of the proposed projects must be submitted to Dallas County by May 26, 2006 Staff recommends approval of the resolution authorizing the use of FY 2006 Community Development Block Grant funds for the installation of Americans with Disabilities Act compliant automatic doors at the Coppell Aquatic and Recreation Center and the William T Cozby Public Library and for the completion of the FY 2005 funded project - Samuel Boulevard Curb Ramps (SW 05 -01) Staff will be available to answer any questions NOW THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: Hereby requests that Dallas County use all of the aforesaid available funds from Fiscal Year 2006 funding installation of Americans with Disabilities Act compliant biparting automatic sliding door systems at the Coppell Aquatic and Recreation Center and the William T Cozby Public Library and for the completion of the FY 2005 funded project - Samuel Boulevard Curb Ramps (SW 05 -01), and the City Manager is further authorized to execute the necessary documents to acquire such funds as may be required. DULY PASSED and approved by the City Council of the City of Coppell, Texas on this the Vled of , 2006. TY OF CO DOMED N. STOVER, MAYOR ATTEST: LIBBY B , CITY SECRETARY v APPROVED CITY ATTORNEY RESOLUTION OF THE CITY OF COPPELL RESOLUTION NO. ~ & _ _ , 1 A RESOLUTION OF THE CITY OF COPPELL, TEXAS, AUTHORIZING THE USE OF COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS FROM CURRENT FISCAL YEAR 2006 IN THE AMOUNT OF $59,284 AND THE INSTALLATION OF AMERICANS WITH DISABILITIES ACT COMPLIANT AUTOMATIC DOORS AT THE COPPELL AQUATIC AND RECREATION CENTER AND THE WILLIAM T. COZBY PUBLIC LIBRARY, AND FOR THE COMPLETION OF THE FISCAL YEAR 2005 PROJECT - SAMUEL BOULEVARD CURB RAMPS (SW 05 -01), AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE NECESSARY DOCUMENTS FOR SUCH FUNDS WHEREAS, the existing double -doors at the front, front vestibule, back, and back vestibule entries to the Coppell Aquatic and Recreation Center (CARC) meet the Americans with Disabilities Act (ADA) standards for door opening force required to push or pull open a door; and WHERE 4S, an automatic door system at the front, front vestibule, back and back vestibule entries mould better meet the needs of the individuals with disabilities that utilize the CARC, and WHEREAS, one of the pair of existing single -doors at the front entry and one of the pair of existing single -doors at the vestibule entry to the William T. Cozby Library is an ADA compliant, push - button, automatic swing door; and WHEREAS, the automatic single -doors at the front and vestibule entry require constant maintenance, and need to be replaced with another type of automatic door system; and WHEREAS, the installation of ADA compliant, biparting automatic sliding door systems at the Coppell Aquatic and Recreation Center, and the William T. Cozby Public Library has been approved as an appropriate project for the use of Community Development Block Grant (CDBG) funds; and WHEREAS, the FY 2005 funded project - Samuel Boulevard Curb Ramps requires additional funding for completion, and WHEREAS, the city has available CDBG funds totaling $59,284 from Fiscal Year 2006 by Dallas Countv; and ÷äóéèóîõ ìêíìíé÷ø ìÊÍÌÍÉרøÍÍÊê×ÌÐÛÙ×Ï×ÎÈ åÓÐÐÓÛÏèùÍÂÚÃìÇÚÐÓÙðÓÚÊÛÊà ùÓÈÃÍÖùÍÌÌ×ÐÐìÊÍÒ×ÙÈïû  2550 0 1 INCH = FT. 50 Created on: 12 May 2006 by Scott Latta Created in LDDT S:\CAD\In_Design\MISC EXHIBITS\dwg\EXHIBITS.dwg\Cozby Exhibit ÷äóéèóîõ ìêíìíé÷ø ìÊÍÌÍÉרøÍÍÊê×ÌÐÛÙ×Ï×ÎÈ ùÍÌÌ×ÐÐûËÇÛÈÓÙê×ÙÊ×ÛÈÓÍÎùÈÊ ùÓÈÃÍÖùÍÌÌ×ÐÐìÊÍÒ×ÙÈïû  2550 0 1 INCH = FT. 50 Created on: 12 May 2006 by Scott Latta Created in LDDT S:\CAD\In_Design\MISC EXHIBITS\dwg\EXHIBITS.dwg\CARC Exhibit