Loading...
SW0501-CS060524T H E C 1 T Y O F COFFELL May 24 2006 Ms Kim Nobles Community Development Administrator Dallas County 411 Elm Street, 3` Floor Dallas, Texas 75202 RE CDBG FY 2006 Funding S w s- °J Project Applications Automatic Doors at Coppell Aquatic and Recreation Center / William T Cozby Public Library Samuel Boulevard Curb Ramps Dear Ms Nobles Enclosed are the full applications for FY 2006 funding on the Automatic Doors at the Coppell Aquatic and Recreation Center and the William T Cozby Public Library project, and the completion of the Samuel Boulevard ADA Ramp (Samuel Boulevard Curb Ramps SW 05 -01) project The resolution approving the projects for FY 2006 funding consideration is attached to each application Should you have any questions or need any additional information, please adN ise Sincerely, N Suzan TaN ]or CIP Coordinator Engineering Department Direct 972- 304 -7019 Fax 972 -304 -3570 E -mail sta�lor!a - c oppell.tx us Enclosures Y Up � x FY2006 DALLAS COUNTY CDBG PROJECT /ACTIVITY APPLICATION 'T "It Each project /activity must be on a separate application. NAME OF CITY C of Connell TITLE OF PROJECT /ACTIVITY Samuel Boulevard ADA Ramps (SW 05 -01 Samuel Boulevard Curb Ramps) (I ) Number of beneficiaries Project will benefit entire city (population of 35, 958) (2) Percentage of beneficiaries being low /moderate income 11.9% of the city is low /moderate income (3 ) How was number of beneficiaries /% of beneficiaries being low /moderate income calculated? [ ] by a survey conducted on [ ] by 2000 census data [ X] other, explain. percentage provided by Dallas County in FY 2005 based on 2000 census data (4) Please provide the information below for the project. (Required) (All census track and block group numbers within the city are listed since the project benefits all residents) Census Tract _141_.1 Block Group 1 41.171, 1 41.1 72 Census Tract _1.41 Block Group 141.181 141. 183 _ Census Tract _141.1. Block Group 141.191 141. 193 Census Tract 14 Block Group 141.201, 141 .202, 141. Census Tract _141 Block Group 141.211 Census Tract 1 22 Block Group 141.221. 141 .222, 141.2 141.224 Census Tract _.141.21 Block Group 141.231, 141.2 141.23 141.234 Census Tract 1.41.26 Block Group 1 41.261. 1 41.26 2, 141.26 141.264 Census Tract 217 10 Block Group _217 (5) Identify which national CDBG objective this project addresses [ ] primarily assists low /moderate income [ ] eradicates blight [ ] eliminates community - threatening condition [ X] n/a (to be used for consultant studies and projects involving ADA accommodations and the elderly which are assumed to automatically address a national objective) (6) Is the service area for this project city -wide? [ X] Yes [ J No If no, a map with the project's service area boundaries clearly marked must be attached. For capital improvement projects, the map must clearly show the location of the project and its beginning and ending points. (7) Describe proposed project. This description should adequately explain what will be undertaken, where it will occur, why it needs to be undertaken, and what problems it will solve Please be very specific in the description -if, for instance, the proposed project involves improving a road or replacing a water line, be sure to state that the project will cover a certain amount of linear feet from Point A to Point B The proposed project consists of the reconstruction of 26 accessibility ramps along the west side of Samuel Boulevard from Parkway Boulevard to MacArthur Boulevard. The current ramps at the seven intersecting streets and the six intersecting alleys are not compliant with the Americans with Disabilities Act (ADA) The project was approved for FY 2005 funding in the amount of $68,932 and reallocated funds in the amount of $3447.68. The city submitted a variance application to the Texas Department of Licensing and Regulation (TDLR) in Nov ember 2005, requesting a variance in all of the locations where the new improvements tie into the existing facilities The city did not intend to reconstruct any sidewalks or crosswalks as p art of this project and wanted a variance before starting design of the project. The TDLR does not grant blanket variances and needs to have each variance location identified and the c ross -slope recorded Funding for the TDLR review, inspection, and variance application fees were not included in the original estimate for this project. The cost of the survey has increased from the original estimate due to the amount of detail that is required for the variance reque If TDLR denies any or all of the variance requests, the quantity of the removal and replacement of concrete sidewalk and ramps could increase These items have been revi from the original estimate and additional funds need to be allocated for the project 2 (8) Project represents [ ] new project/activity [ ] continuation of on -going activity (i.e., code enforcement) [X ] completion of an existing project (i e , a project- usually a capital improvement project - -that has received funding in the past, but still needs additional funding in order to be constructed) (9) Attach a line -item budget for the proposed project/activity Describe within this budget how proposed costs are derived. For capital improvement projects, also provide itemized costs and quantities for such components including, but not limited to, right -of- way /easement acquisition, surveying/engineering design, utility materials, construction management, materials, and permits /fees Where possible for capital improvement projects, have the estimates provided by a licensed professional engineer (10) Describe how project/activity is to be funded. • FY2006 CDBG funding being allocated • CDBG funding from completed/canceled projects now being reallocated (Carryover amount from award letter) • Previous CDBG funding that has been allocated (FY 2005) • Non -CDBG funding that has been allocated (See note below *) • Additional funding still needed TOTAL BUDGET $5616.00 344768 68,932 00 000 0.00 $77,995.68 *Note: please provide the source of any non-CDBG funding that will be used for this project (example: city funds, other government entity, etc.) (1l) If carry -over CDBG funding (amount from award letter) from previous projects is going to be used, identify the previous projects from which this funding is being reallocated and the amounts being reallocated. (Please note that carryover funds are not available until the project is officially completed and all outstanding invoices have been paid). Funding from FY 1998 Coppell Middle School West Restroom Protect in the amo of $3,447.68 has been reallocated for use on this project The resolution approving the reallocation was approved on May 24 2005 3 (12) If non -CDBG funding is to be used, describe whether this funding has already been secured or when such funding will become available. Not applicable (13) If additional funding will still be needed, describe how additional funding will be provided (example: through future CDBG funds, city bond program, etc.). The city does not anticipate needing any additional funding for the project. (14 ) Describe what portions of the project, to the extent applicable, that will be implemented /managed by the County, the City, another organization, or some combination of these entities. The city will implement /manage the following (1) engineering des ign, (2) land rights acquisition, (3) coordination and relocation of utilities, (4) bidding the project, (5) inspection of the project, (6) contract administration, and (7) managing consultant contracts An outside consultant will perform the following (1) design survey, and ( 2) preparation of the legal descriptions and plats. (15) Prepesed start date for implementing project October 2005 (16 ) Proposed completion date October 2007 (17) Date(s) of public hearing(s) held by City to identify possible projects April 26, 2005 Contact person for project: Suzan Taylor — CIP Coordinator Phone number: 972 - 304 -7019 Fax number: 972 - 304 -3570 Authorized signature: Kenneth M Griffin, P.E. D irector of Engineermg/Public Works 4 SAMUEL BOULEVARD - CURB RAMPS PRELIMINARY COST ESTIMATE (REVISED) ITEM NO.11 DESCRIPTION QUANTITY UNIT JI PRICE I AMOUNT 1 Construction Desi n Plans In -House 1 EA. 11 $450 00 $3,150 00 $0.00 $0.00 2 Contract Administration In -House 1 L.S $145.00 $000 3 Ins ection In -House 1 L.S $25000 $25000 ITEM NO.11 DESCRIPTION 1 Desi n Sui I QUANTITY I I 1 L.S 1 1 L PRICE IF $5,76500 AMOUNT $5,76500 2 1 Preparation of Legal Description & Plats Corner Clips) 7 1 1 1 EA. 11 $450 00 $3,150 00 ITEM NO. DESCRIPTION QUANTITY UNIT - PRICE I AMOUNT 1 Project Registration 1 L.S $17500 $17500 2 Texas Department of Licensing & Regulation Prelimina Review Fe 1 L.S $145.00 $145.00 3 Texas Department of Licensing & Regulation Review Fee 1 L.S $25000 $25000 4 Texas Department of Licensing & Regulation Inspection Fee 1 L.S $35000 $35000 5 Texas De artment of I icensin & Regulation Variance Re uest Fee 13 EA. $175.00 $2,275.00 ITEM NO. DESCRIPTION QUANTITY UNIT 1 PRICE AMOUNT 1 Mobilization 1 L.S $7,00000 $7,00000 2 Remove & Replace Concrete Curb 593 L.F $35.00 $20,75 3 Remove & Replace Concrete Sidewalk and Ramp 196 S Y $7500 $14,70000 4 Relocate Existing Streetlights 7 EA. $1,00000 $7,00000 5 Relocate Existing Signs 4 EA. $150.00 $600.00 6 Relocate & Replace Existing Fire Hydrants 1 E 3 EA. $2,00000 $6,000.00 7 Remove & Replace Irrigation, Landscaping and Solid Sod 1 L.S $3,000.00 $3,00000 8 Fumish, Install &Maintain Erosion Control Devices 1 L.S $1,00000 $1,000.00 9 JlFumish, Install & Maintain Traffic Control Devices 1 L.S $5,000.00 $5,00000 TOTAL $77,165.00 ESTIMATE OF QUANTITIES TOTALI 26 1 14 593 1 196 1 4 1 7 Estimated quantities for the concrete curb, ramp, and sidewalk removal and replacement taken from GIS AutoCad & TDLR information. Extimated costs taken from bid tabulations and preliminary cost estimates for similar on -going and completed city projects. Number Number Concrete Curb Concrete Sidewalk & Ramp Existing Existing No Street or Alley Location of Ramps of Corner Remove & Replace Remove & Replace Signs Streetlights Clips Linear Foot (Square Yard (Each)Each 1 Hood Drive 2 2 62 23 1 1 2 Hood Drive / Johnson Street Alley 2 33 10 2 1 3 Johnson Drive 2 2 65 20 4 Johnson Drive / Duncan Drive Alley 2 34 6 5 Duncan Drive 2 2 76 26 1 1 6 Plumlee Place 2 2 40 13 1 7 Plumlee Place / Coats Street Alley 2 24 9 8 Coats Street 2 2 57 22 1 9 Coats Street / Parr Street Alley 2 33 9 10 Parr Street 2 2 57 18 1 11 Parr Street / Harwell Street Alley 2 29 9 12 Harwell Street 2 2 53 21 1 13 Harwell Street / Parkway Blvd. Alley 2 29 9 TOTALI 26 1 14 593 1 196 1 4 1 7 Estimated quantities for the concrete curb, ramp, and sidewalk removal and replacement taken from GIS AutoCad & TDLR information. Extimated costs taken from bid tabulations and preliminary cost estimates for similar on -going and completed city projects. •----A.r.hitectural Barriers Fee Schedule Page I of 3 Ski�to content Skip to in ide Archite ctural Barriers Skip _to_Registered Acc Ski to tof Licensing and Reg u Ii Architectural Barriers Fee Schedule Effective February 1, 2005 Construction Cost $50,000 - $200,000 200,001 - 500,000 500,001 - 1,000,000 1,000,001 - 5,000,000 5,000,001 - 10,000,000 10,000,001 - 15,000,000 15,000,001 - 25,000,000 25,000,001 - 50,000,000 50,000,001 - 75,000,000 >75,000,000 Review Fee Inspection Fee $250 $350 315 375 380 400 445 445 575 575 620 620 785 785 955 955 1,175 1,175 Contact TDLR for negotiated fee • Inspection of State Leases, (no construction involved) - $225 per lease • Preliminary Review Fee - $145 each • Special Inspection Fee - $215 per hour, one hour minimum • Variance Application Fee - $175 each • Variance Appeal - $200 • Project Filing Fee - $175 • Late Project Filing Fee - $300 • Replacement Notices - $25 each Registered Accessibility Specialist: • Application for Certificate of Registration - $200 (Dual Endorsement - $300) • Registration Renewal - $150 (Dual Endorsement - $250) . Texas Accessibility Academy Entrance Fee - $150 Examination - $100 . Wall Certificate Duplicate or Replacement - $25 Wallet Card Duplicate or Replacement - $25 • Revised Registration - $25 • Add or Subtract Endorsement - $25 When the estimated construction cost is less than $50,000, and the project is registered with the department for review, inspection, or for review and inspection, the following shall apply (1) the project filing fee and a $200 plan review fee shall be paid for registration and review only, (2) the project filing fee, a $200 plan review fee, and $200 inspection fee shall be paid for http. / /www license state tx us /ab /abfees htm sii ni ?nn6 Home About_TDLR_ Em loy_ment Contact Us BumuN & CiAwF u, UC LAND SURVEYING & TOPOGRAPHIC MAPPING City of Coppeli 255 Parkway P O Box 9478 Coppell, Texas 75019 972/304 -7019, FAX 972/304 -3570 sta I or(&Ci c tx.us Attention Ms Suzan Taylor, CIP Coordinator Engineering Department Dear Ms. Taylor Re Project #SW 05 -01 Samuel Boulevard Curb Ramps Reconstruction Project Pursuant to request your request we hereby submit our proposal to provide survey services. I understand your desired scope of services is as follows Design Survey — Survey and prepare a design /topographic survey map of the six streets and seven alley locations, along the west curb of Samuel Boulevard from Parkway Boulevard to Hood Drive The topographic surveys will be within the right -of -way of Samuel Boulevard only and will extend fifty feet south and fifty feet north of each curb intersection and will indicate spot elevations on each side of each expansion joint for the sidewalks, and will include the elevations of the top of curbs, the gutter, and alt surface features including fences within the topographic area and will indicate the actual right -of- way lines The power poles and telephone pedestal iynibols will also be drawn to scale ( ontourin`, will not be Included in this proposal Special Service — Survey and prepare Including Iron rod corners the right -of -way corker clips for a maxim►nn o1 seven (7) parcels The Design Survey will be prepared for a lump sum fee of' $5,765 00 based upon 34 hours of 2 Man Survey Crew time at $110.00 per hour ($3,740 00), and 27 hours of electronic drafting at $75.00 per hour ($2,025 00) Fhe Special Services (right -of -way documents) will be prepared for a fee of $450.00 per document based upon I hour of 2 Man Survey Crew time at $110.00 per hour, i / 4 hour time for Registered Professional Land Surveyor at $120.00 per hniir and 4 133 hours of electronic dral'tinc at $75.00 per hour ($450 x 7) _ $3,150.00 for 7 documents Total maximum fee proposed $8,915.00 By: We sincerely appreciate being considered for this project and look forward to working With you again CITY OF COPPELL JIM WITT, City Manager Date: April 12, 2006 RespectfulIN submitted. r f James 1, Bnttain R.P L S ,LH;,„ „ James L. Brittain, R.PL S, Jack M Crawford, R PL.S , Stuart F Smith, R.PL.S and Chris L. Blevins, R.PL.S PO Box 11374 ' 3908 South Freeway ' Fort Worth, Texas 76110 ` (817) 926 -0211 ' Metro 429 -5112 ` Fax (817) 926 -9347 Email - admin@brittain- crawford corn