Loading...
MA0601-CS060524T H E C I T Y O F COPPELL MaN 24, 2006 Ms [aim Nobles Commumty DeN- elopment Administrator Dallas County 411 Elm Street, 3�� Floor Dallas, Texas 75202 �q L 0/ RE CDBG FY 2006 Funding Project Applications Automatic Doors at Coppell Aquatic and Recreation Center / William T Cozby Public Librarti Samuel Boulevard Curb Ramps Dear Ms Nobles Enclosed are the full applications for F) 2006 funding on the Automatic Doors at the Coppell Aquatic. and Recreation Center and the %N illiam T Cozby Public Library project, and the completion of the Samuel Boulevard ADA Ramp ( Samuel BouleN and Curb Ramps SAN 05 -01 ) project The resolution approving the projects for FY 2006 funding consideration is attached to each application Should Nou halve any questions or need any additional information, please advise SincerelN � r Suzan TaN ]or CIP Coordinator Engineering Department Direct 972- 304 -7019 Fax 972 -304 -3570 E -mail std% for a u co ell tx u,, Enc.lo I i } I , I t I I I f F L - * 4 _ t, FY2006 DALLAS COUNTY CDBG PROD CT/AC.TIVITY APPLICATION Each project /activity must be on a separate application. NAME OF CITY City of Coppell TITLE OF PROJECT /ACTIVITY Automatic Doors at the Coppell Aquatic and Recreation Center & William T. Cozby Public Library (1 ) Number of beneficiaries Project will benefit entire city (population of 5,958) (2) Percentage of beneficiaries being low /moderate income 11 9% of the city is low /moderate income (3 ) How was number of beneficiaries /% of beneficiaries being low /moderate income calculated`' [ ] by a survey conducted on [ ] by 2000 census data [ X] other, explain percentage provided by Dallas County in FY 2005 based on 2000 census data (4) Please provide the information below for the project (Required) (All census track and block group numbers within the city are listed since the project benefits all residents) Census Tract 141 1.7_ Block Group 141.171, 1 172 _ Census Tract _141 18 Block Group 14.1. 181, 141 18 Census Tract 141 19 Block Group 141 191, 141 192 1 Census Tract _ 141 20 Block Group 141 201, 141 202 14 20 3 _ Census Tract 141-21 Block Group 141.211 Census Tract 1+1_2 Block Group 141 221, 141 222 1 Census Tract _141 23 Block Group 141.231, 141.232 _ 141.234 Census Tract 141 26 Block Group 141.261, 141 262,_ 141.263,1 Census Tract 217 10 Block Group 217 101_ (5) Identify which national CDBG objective this project addresses [ ] primarily assists low /moderate income [ ] eradicates blight [ ] eliminates community- threatening condition [ X] n/a (to be used for consultant studies and projects involving ADA accommodations and the elderly which are assumed to automatically address a national objective) 1 (6) Is the service area for this project city -wide [ X] Yes [ ] No If no, a map with the project's service area boundaries clearly marked must be attached For capital improvement projects, the map must clearly show the location of the project and its beginning and ending points. (7) Describe proposed project. This description should adequately explain what will be undertaken, where it will occur, why it needs to be undertaken, and what problems it will solve Please be very specific in the description -if, for instance, the proposed project involves improving a road or replacing a water line, be sure to state that the project will cover a certain amount of linear feet from Point A to Point B The existing swing, double -doors at the front front vestibule back. and back vestibule entries to the Coppell Aquatic and Recreation Center(CARC) meet the Americans with Disabilities Act (ADA) standards for opening force required to push or pull open a door. However many of the activities at the center require the individual to have their own exercise and /or swimmin g equipment Opening these doors while carrying equipment can be difficult for someone with a disability "There is a pair of single -doors at the front entry and a pair of single doors at the , vestibule entry to the William T Cozby Public Library One of the single -doors at each of the entries is an ADA compliant push- button automatic swing door The other single -doors are swing doors that also meet ADA standards The automatic doors swing in one direction and have numerous maintenance problems due to children playing with the buttons, and the wind catching the front entry door when it is the process of closing It is no longer economical to maintain the doors The existing single doors at the front, front vestibule back, and back vestibule entries to the CARL will be removed and replaced with a biparting automatic sliding door system The p air of single -doors at the front entry and the pair of single -doors at the vestibule entry to the library will be removed and replaced with a biparting automatic sliding g oor system. All of the doors at each facility will be ADA compliant and have two -way motion sensors dual safety beams, and threshold presence sensors 2 (8) Project represents [X ] new project /activity [ ] continuation of on -going activity (i e , code enforcement) [ ] completion of an existing project (i e , a project- usually a capital improvement project - -that has received funding in the past, but still needs additional funding in order to be constructed) (9) Attach a line -item budget for the proposed project /activity Describe within this budget how proposed costs are derived For capital improvement projects, also provide itemized costs and quantities for such components including, but not limited to, right -of- way /easement acquisition, surveying /engineering design, utility materials, construction management, materials, and permits /fees Where possible for capital improvement projects, have the estimates provided by a licensed professional engineer (10) Describe how project /activity is to be funded • FY2006 CDBG funding being allocated • CDBG funding from completed /canceled projects now being reallocated (Carryover amount from award letter) • Previous CDBG funding that has been allocated • Non -CDBG funding that has been allocated (See note below *) • Additional funding still needed TOTAL BUDGET $53,668.00 000 000 000 0.00 $53,668.00 *Note: please provide the source of any non -CDBG funding that will be used for this project (example: city funds, other government entity, etc.) (1 1 ) If carry -over CDBG funding (amount from award letter) from previous projects is going to be used, identify the previous projects from which this funding is being reallocated and the amounts bung reallocated (Please note that carryover funds are not available until the project is officially completed and all outstanding invoices have been paid). Not Applicable 3 (12 ) If non -CDBG funding is to be used, describe whether this funding has already been secured or when such funding will become available Not anolicable (13 ) If additional funding will still be needed, describe how additional funding will be provided (example: through future CDBG funds, city bond program, etc.). The city does not anticipate needing any additional funding for the project. (14) Describe what portions of the project, to the extent applicable, that will be implemented /managed by the County, the City, another organization, or some combination of these entities. The city will bid the project provide contract administration and inspection. An outside vendor will develop the bid specifications, install the automatic doors, and install the electrical conduit and wire (15 ) Proposed start date for implementing project October 2006 (16) Proposed completion date January 2007 (17) Date(s) of public hearing(s) held by City to identify possible projects April 25, 2006 Contact person for project: Suzan Taylor — CIP Coordinator Phone number: 972- 304 -7019 Fax number: 972 -304 -3570 Authorized signature: Kenneth M Griffin, P E Director of Engineering /Public Works 4 CD 0 0 N LO _YE } a CO J J m D a } m N O U H Q J J 3 w F- LU F- Z W U Z 0 a W Ix U W Z Q U_ Q C'1 Q J J W a CL 0 2 H � aw N N 0 O O U a Z_ OW as } Q' a m J U J m a } m N O U F- Q J J G 0 0 0 o 0 O 0 O O to U') O M O N M f• fA CO N V 64 Z V M O D O D7 O f� EA M F- to Q 69 Z ° o C) ° O CD LO OM O N M W U_ to co 04 IT to Q a ~ Q cn cn � UL W J J O O CD H C3 0 O V V O Z O .- m a W r- D M U Es d cfl - L a ~ O O m L O N O O ❑ L Q cn cn cn HI W J c � J C O ( n O c ' E ❑ Q Z fO �° c O o N ~ a d a m .X �w CD cm U) U O W c m o O_ ❑ - p ,O p N O U m E O `E N U w CL o . N o6 (n LL 7 a O m w 0 N O CL c�tn mU cv E ❑ N U Q U O L c a) a) F- N N ❑LL a- W W O Z c U m 1 — N M W o m ° .J o F_- ' n) U m O O E } Q' a m J U J m a } m N O U F- Q J J G m M LO Vl J Q F 0 F U a) O a T U a) N n E O U C c 0 O) C O m E O C U O U) - -- ns Q) rn n O N 0� a) o Y U ` to 0 O c c > O m > � C C � O E E c N O T (n () Q C O a) O O @ . N "2 Y - ca o N 3 (6 a) L m . p U C O O U U C a) N U N L N N a) O 7 -C O s 3 cn '� c °- C O L p O n (D () 2 E c E- cn o_ O O c O c :3 CM -0 `o > c O) O a) (D a) U 0 O O O � O a) a) c O a) :t-_ .. U Y C C m o > > o' a _0 N > O m E E > O 0 0 W W 0 0 0 0 0 O V V O O D7 0 f� EA M F- to 69 Z 64 O Q 0 o O o Co O O O CD cn C3 0 O V V O O .- m C W r- M U Es cfl - a ~ Q cn cn cn HI W J J J Z Q d L C 0 m p N O O N c 10 cco � (n O cv E ❑ Z O m a) rn E m c O x a a N w cm O) U O c U m c c W a o m ° .J o " ' n) U m O O E c O O v U J U m C❑ a) In F- : ,O cn N M n O ac h O d L U) U O L N U . O V c O = > E O 0 O U a) F- a) W 0 Li a- W O Z W m M LO Vl J Q F 0 F U a) O a T U a) N n E O U C c 0 O) C O m E O C U O U) - -- ns Q) rn n O N 0� a) o Y U ` to 0 O c c > O m > � C C � O E E c N O T (n () Q C O a) O O @ . N "2 Y - ca o N 3 (6 a) L m . p U C O O U U C a) N U N L N N a) O 7 -C O s 3 cn '� c °- C O L p O n (D () 2 E c E- cn o_ O O c O c :3 CM -0 `o > c O) O a) (D a) U 0 O O O � O a) a) c O a) :t-_ .. U Y C C m o > > o' a _0 N > O m E E > O 0 0 W W Terry Smith 2207 Joe Field Road Territory Manager Dallas, TX 75229 Tel 972 - 484 -5144 Fax 972 - 243 -4078 Security Solutions Quotation #69168 Attn Shari Moino City of Coppell Tel 972 462 -5152 Fax 972 462 -5199 May 10, 2006 Project Name Coppell Library Access Technologies Stanley Access Technologies, LLC is pleased to provide you a quotation to furnish and install the following 2 ea D/G 2000 BP, Tier 2, White 8 ea 1" glass 8 ea 114" glass 1 ea Demo labor Net Price $17,143 00 Current equipment lead -time is 5 -6 weeks from receipt of order and approved dimensions Equipment is furnished and installed during normal business hours (8 00 AM to 4 30 PM, Mon -Fri) Scope Of Work Furnish and Install ( 2 ) Stanley DG2000 Biparting automatic sliding doors Narrow stile With two way motion sensors, dual safety beams and threshold presence sensors Size 160" x 7'9" no transom Finish Kynar two coat paint White Includes demo of existing doors and 1" clear glass for exterior and 1/4" clear tempered glass for interior Exclusions 120 Volts AC to operator locations, conduit and control wiring After hours premium labor Security Solutions Quotation #69166 Terry Smith Territory Manager Attn Sheri Moino City of Coppell 816 S Coppell Rd Coppell, Tx 75019 Tel 972 462 -5152 Fax 972 462 -5199 2207 Joe Field Road Dallas, TX 75229 Tel 972 - 484 -5144 Fax 972 - 243 -4078 May 10, 2006 Project Name Coppell Aquatic Center Access Technologies Stanley Access Technologies, LLC is pleased to provide you a quotation to furnish and install the following 4 ea D/G 3000 BP, Transom, Clear 40 ea 1/4" glass 1 ea Demo Labor Net Price: $26,255 00 Current equipment lead -time is 5 -6 weeks from receipt of order and approved dimensions Equipment is furnished and installed during normal business hours, (8 00 AM to 4 30 PM, Mon -Fri) Scope Of Work Furnish and Install ( 4 ) Stanley OG3000 Biparting automatic sliding doors Narrow stile With two way motion sensors, dual safety beams and threshold presence sensors Size 9'0" x 7'8" withtransoms to 10'0" Finish Clear anodized Includes demolition of existing doors and 1/4" clear tempered glass for new doors Exclusions 120 Volts AC to operator locations, conduit and control wiring After hours premium labor May 1 06 C,' - Pat Dillehay 9404584073 P I Page I of 2 PROPOSAL ICONTRACT PATS ELECTRIC PO BOX 50083 DENTON TX 76206 817-403-3531 940458-4673 FAX PAT ATSELECTRIC-COM TX LICENSE # 92662 CONTRACTOR if 22436 Date- 5/ 122006 Conti-act 16 "Pat Dilithav/Pats Electric", hereinafter Feferrcd to as "Electric Contracler', proposes to famish material and labor in accordance with the job description identified in this Proposal/Contmn plasuant to the Following I SUBMTTTED TO- SHERI MOINO, CITY OF COPPELI, PO BOX 9478, COPPELL, TX 75019 2 JOB PHONES- Phovel 972462-5151 Pboine-2 Fats. 972462-5199 3 JOB LOCATION: AQUATIC CENTER)COZBY LIBRARY 4 PLANS DESCRIPTION N/A 5 JOB DESCRIPTION COZBY LIBRARY INSTALL 20 AMP DEDICATED CIRCUIT TO FRONT ENTRY DOOR FOR AUTOMATIC DOOR ROUTE CONDUIT CABLE ABOVE LAY TN CEn,rNG USE EXISTING 3REAKER BOX $940 00 AQUATIC CENTER INSTALL 10 AMP DEDICATED CIRCUIT TO FRONT DOUBLE ENTRY DOOR AND BRANCH TO DOUBLE EXIT DOOR ROUTE CONDUIT/CABLE ABOVE LAY IN CEILING TO POOL AREA LNSTALL COVDUIT EXPOSED ON WALL IN POOL AREA TO MFCRANICAL AREA AND ROUTE TO EXISTING BREAKER BOX $4,33000 T01 AL SS 270 00 WE PROPOSE to perform the work as stated in this Contract im accordance with the specifications and plans submitted and completed in a workmanlike manner for the sum of- SEE ABOVE with ")rnerivs- PER CONTRACT This Contract is executed at "State of Texas Count of Denton, USA" brT IEICCtFk COW1100F ACCEPTANry CIF 7 PROPfi - Al - Tb r r ir- - . term 2Dd covdillans are birrIebyacceyttd. Ycou are nuilicnized to do the work as specified. Payment will he 0&*& as outlined above. It is undeTstocd and agreed that this work is not provided fin in any other agreement and no odwir Writractual rights arise until this Pr is accepted IT] Wniang, Dam Signature