Loading...
Belt Line Trade-CS060601 THE C I T Y o F COPPELL ....,"<-- ...t.....:. ~~, i... , tl ",;.J/.:::;! ~"_'~'~..L\! Ijd ~~.:~ '''.1--- -:<?-:--,,,,,,-,,, , :/ ...--:.:::.,;;;:.?' ~:?- ::':>..",:. ~':::? " f \' -;;r >,,~ ~ '" ,j ~ , \ ' June 1,2006 Mr Edward W Eckart. P E Goodwm and MarshalL Inc 2405 Mustang Dnve GrapevIne. TX 76051 RE: Belt Lme Trade CCl1ter, Lot 1. Block 1 REVISED Fee Assessment Letter Dear Mr Eckart Enclosed IS a reVIsed copy of the City of Coppell Development Fee Assessment table, along wIth a copy of the Development Fee calculatIOns for the referenced development. An lITIgatIOn meter has been added to the assessment per the request ofMr Chns Parnell, IDI ConstructIon Manager Please note that the Texas LegIslature. under Sel1ate BIll 243. dela}ed the collectIOn of Water and Sewer Impact Fees until the Issuance of a BuIldIng PermIt The additIOnal fees for water and sewer taps. water meters. and utIhty mspectIOl1 tees need to be paId by separate check at the new Pubhc Works SerVIce Center, 816 S Coppell Road. Meters WIll be ordered when those fees are paId ApproprIate payment of the reqUIred fees WIll help msure a successful begllll1lng of thIS proJect We look forward to workIng WIth you on thIS proJect. If you have any questIOns. please contact me SlIlcerely. ~1-~ Charlene La MattIna. E I T Graduate EngIneer cc Jenmfer Armstrong Fll1ance DIrector Mary Beth Spletzer. Admll1IstratIve Secretary. Butldll1g InspectIOns Glenn Hollowell. ASSIstant DIrector of PublIc Works (Jreg Jones. ChIef BUIldmg OffiCIal ChrIS Parnell, IDI ConstructIon Manager fax 972-560-7007 ::: r- A. r; f' v\ A ~ * P Ci E l '''' ,~4 ~-j * ( 'j I- f--' !-_ L L I 7~: I 1:J * I E L :~ --, 2 4 t " 2 2. * FA l( ~~ 7 2 '3 () 4 3 6 7 3 DEVELOPMENT FEE TABLE Project: Belt Lme Trade Center, Lot 1, Block 1 Date: 5/31/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee ~7 ,420 00 (] 000/0 due at Issuance of BuildIng PermIt) Water Tap InspectIon Fee 5250 00 (] 000'0 due at Issuance of Water Meter) Water Meter Fee (DomestIc) $204 34 (]000,0 due at Issuance of Water Meter) Water Meter Fee (lrngatIOn/Flrelll1c) S9,491 18 (] 000'0 due at Issuance of Water Meter) Water Meter DepOSIt (DomestIc) $3000 (100% due at Issuance of Water Meter) lrngatwn/Flrelll1e Meter DepOSIt $] 2000 ( I (l00 0 due at Issuance of Water Meter) Waste\\3ter Impact Fee S2,240 00 (100010 due at Issuance of BuildIng PermIt) Wastewater Tap InspectIon Fee $50 00 ( ] 000/0 due at Issuance of BuIldll1g Pcn11lt) UtIlIty FInal InspectIon Fee ~50 00 (] 000 0 due at Issuance of BuIldll1g PennJt) Park Fee SO 00 $000 (] 000 0 due pnor to FIIlI1g Plat) Road\\3y Impact Fee 1;]]9,25000 $1]9,25000 (1000 (I due prIor to FIlIng Plat) .;; treet LIght Fee Informatllln not Available (10000 due prIor to Acceptance of ProJect) II Street "lgn Fee InformatIOn not A \ allab]e (] 000 0 due prIOr to Acceptance of ProJect) II ConstructIon InspectIOn Fee Informatlun not A v allable (I OO~ u due prIor to 5tart of Constructwn) rOTAL II >139.105521 TOT AL AMOLNT DUE PRIOR TO FILI1\G FI~AL PLAT $]]9,25000 DEVELOPMENT FEE WORKSHEET PROJECT DATE' Belt Line Trade Center, Lot J, Block J 5/31/2006 Water Impact Fee: Domestic Meter(s) 1 - 2 inch = 8 ESU's Irrigation Meter(s) 2 - 2 Inch = 16 ESU's 0 = 0 ESU's Fireline Meter(s) 2 - 8 inch = 25 ESU's Total #' 26 5 ESU's @ $280 00 ea (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #' 5 Connections @ $50 00 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #' 1 Domestic Meter(s) @ $20434 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline \\ ater "1eter Fee: Total #' 2 Irrigation Meter(s) @ Total #' 0 Additional Irrigation Meter(s) @ Total #' 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $204 34 $000 $4 541 25 Domestic Water Meter Deposit Fee: Total #' 1 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Irrigation/Fire :\leter Deposit Fee: Total #' 4 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Wastewater Impact Fee' Total Domestic Meters ESU's 8 (Due prior to issuance of building permit) @ $280 00 ea Waste\\'ater Tap Inspection Fee. Total # 1 Connections @ $5000 ea (100% due prior to issuance of building permit) litilitv Final Inspection Fee (All de, elopments). Total # 1 Lots @ S50 00 ea (100% due prior to Issuance of building permit) Page 1 $7,42000 $250 00 $204 34 $408 68 $000 $9,082 50 $30 00 $120 00 $2,240 00 $50 00 $50 00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential DeHlopments Onl))' * Preliminary plat approved: After October 26, 1993 o o Single-family @ $0 00 per lot Multi-family @ $000 per unit (100% paid prior to Council approval of final plat) Roadwa)' Impact Fee. (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after T U Electric submits the lighting plan for the proposed development Once the plans are submitted, $29260 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engmeering Department (2% of development cost required for private improvements) 14% of development cost required for public improvements) Page 2 $000 $000 $119,25000 Information not Available Information not Available Information not Available