Loading...
DR9502-CS 960523MEMORANDUM Leisure Services Department D~TE= May 23, 1996 TO: FROM: RE: Ken Griffin, A.C.M./City .Engineer Gary D. Sims, Director~ Andy Brown Community Park West Flood Plain Study We have several Capital Improvement Projects scheduled for Andy Brown West Park (ABW), we have held up these projects, pending completion of the flood plain study. I have not checked back with you to find out the status of the flood plain study. If at all possible, we would like to proceed with at least two of these projects, the installation of the playground and the concrete trail connections. Ideally, we would like to have these completed before the commencement of the fall soccer season (August 26, 1996). The plans and specifications for the new playground and concrete trail connections are ready for the bidding process. Is there any reason that we can not proceed with these two elements? Please let me know as soon as possible. Thank you.