Loading...
Coppell/121 Off Pk-CS060606T H E C~ 1 T Y O F COPPELL ~, , ~ ,~ A ,5 1 June 6, 2006 Konstantine Bakintas, P.E Baird Hampton & Brown, Inc 920 S Main Street, Suite 190 Grapevine, TX 760 1 RE: Coppell 121 Office ParkiLot 212, Block 1 Construction Plan Review Comments Dear Mr Bakmtas The Cay of Coppell has reviewed the referenced plans and has the following comments to offer Cover Sheet 1 Please modify the tale on the cover to reflect the platted name "Coppell 121 Office Park instead of "Highway 121 Business Park." Site Development Plan 2 The 4 parking spaces located on the adjacent property to the west are not coy eyed by any parking or access easements Please provide permission from that property owner mdicat~ng their agreemen*, to construct the proposed parking spaces on their site A copy of the parking agreement that was requested during the DRC process would also be sufficient Site Paving & Dimensional Control Plan 3 Include the concrete strength (3600 psi mm.), paving thickness (6" mm. for fire lane), steel size and spacing, and lime stabilrzation requirement rn the paving legend 4 Replace the wheel stops with a device similar to a TXDOT Type III barncade An alternative that uses orange and white reflective stnpmg and stands vertically would be considered. Grading & Drainage Ylan 5 Prop ode a copy of your permit, or documentation mdtcating one is not required, from TXDOT for the proposed work within the 'I'XIllOT easement. Please be advised that this documentation will be required prior to the issuance of a permit by the City for the proposed improvements Utility Site Plan 6 Water lute that Is 10" or smaller shall be DR1~ Class 200 Please modify the water line call OUt s 5 P P F r W n * P O G ~- X y h' F * C C PPE I T ~ O I y * T F l `~ ~ 2 4 1; r n; ? * f A Y. 9 "' 2 iii 4 3 6 7 3 7 Label the size of the existing water line Revised Landscape Ptan & Tree Survey 8 Remove the landscape plans from the civil drawings The Engineering Department does not review or approve these plans They should be submitted to the Building Inspections Department for approval Please make the necessary changes and submit these marked-up plans and two sets of revised plans to the City for review If you have any questions, please contact this office at your convenience Sincerely, ~/ C~~ Y Charlene La Mattina, E I T Graduate Engineer Office Phone (972) 304-3681 Fax (972) 304-3570