MacArthur Vista-CS060605RE: Mac Arthur Vista
Coppell Engineering Comments
June 5, 2006
Final Plat:
1 Plat has been filed need to discuss
2 ~, ~,
Dimension Control Plan:
3 Added Bldg sq footage
4 5' sidewalk shown
5 Driveway bands shown
6 Dimensioned parking spaces
7 Added and labeled easements
Paving & Grading Plan:
8 Retaining wall design will come from Byother Developer is in process of
obtaining design I will incorporate retaining wall design once obtained
9 Updated typical paving design
10 Revised general note
11 Added detail and labeled ADA ramps
Storm Sewer Plan & Profile:
12 Increased limit of rip rap Proposed rip rap should be adequate w/ 3 7 fps
velocities
Water & Sanitary Sewer Plan:
13 Easements shown
14 Revised existing sizes, etc
15 Added label to const external drop on existing manhole
16 Added slope to san sewer lateral
17 Labeled FDC and corrected FDC line label
18 Revised service line labels, etc
19 Added isolation valve
20 Revised note for embedment. (fyi subdivision ordinance online reads as
!had originally)
Erosion Control Plan:
21 Added construction entrance location
22 Removed "wood" from silt fence details
DOWDEY, ANDERSON
& ASSOCIATES, INC.
CIVIL ENGINEERS
5225 Village Creek Drive, Suiie 200
Plano, iezas 75093
Phone 912.931.0694 faM 911.931.9538
To: Charlene LaMattina
RANSMITTAL
From: Daniel f-leischman, P E.
Co: City of Coppell Date: June 6, 2006
Address: 255 Parkway Blvd
Coppell Texas 75019 CC: File
Phone: 972-304-3681 Via: Hand Delivery
Re: MacArthur Vista
Coppell, Texas Job #: 99016
Attached, please find the following:
2 - Sets of Construction Plans
1 - Set of Mark Ups
1 - Response Letter
Received by _
Date received:
C ~~Documen[s and SettingsldheischrrenlDesktop~Documenls~MacArthur VistalCoppell - trans.doc