Loading...
MacArthur Vista-CS060605RE: Mac Arthur Vista Coppell Engineering Comments June 5, 2006 Final Plat: 1 Plat has been filed need to discuss 2 ~, ~, Dimension Control Plan: 3 Added Bldg sq footage 4 5' sidewalk shown 5 Driveway bands shown 6 Dimensioned parking spaces 7 Added and labeled easements Paving & Grading Plan: 8 Retaining wall design will come from Byother Developer is in process of obtaining design I will incorporate retaining wall design once obtained 9 Updated typical paving design 10 Revised general note 11 Added detail and labeled ADA ramps Storm Sewer Plan & Profile: 12 Increased limit of rip rap Proposed rip rap should be adequate w/ 3 7 fps velocities Water & Sanitary Sewer Plan: 13 Easements shown 14 Revised existing sizes, etc 15 Added label to const external drop on existing manhole 16 Added slope to san sewer lateral 17 Labeled FDC and corrected FDC line label 18 Revised service line labels, etc 19 Added isolation valve 20 Revised note for embedment. (fyi subdivision ordinance online reads as !had originally) Erosion Control Plan: 21 Added construction entrance location 22 Removed "wood" from silt fence details DOWDEY, ANDERSON & ASSOCIATES, INC. CIVIL ENGINEERS 5225 Village Creek Drive, Suiie 200 Plano, iezas 75093 Phone 912.931.0694 faM 911.931.9538 To: Charlene LaMattina RANSMITTAL From: Daniel f-leischman, P E. Co: City of Coppell Date: June 6, 2006 Address: 255 Parkway Blvd Coppell Texas 75019 CC: File Phone: 972-304-3681 Via: Hand Delivery Re: MacArthur Vista Coppell, Texas Job #: 99016 Attached, please find the following: 2 - Sets of Construction Plans 1 - Set of Mark Ups 1 - Response Letter Received by _ Date received: C ~~Documen[s and SettingsldheischrrenlDesktop~Documenls~MacArthur VistalCoppell - trans.doc