Gateway BP(1.6)-CS060607T H E C I T Y O F COPPELL A ,y 5 June 7, 2006 Patryck Acker, P E Halff Associates, Inc 8616 Northwest Plaza Drip e Dallas, TX 75225 R1C: Gateway Busyness Park, Lot 3B, Block 2 Fee Assessment Letter Dear Mr Acker Enclosed is a copy of the Crty of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the Crty of Coppell in the amount of $68.857.14 and forward to the Engineering Department along with a copy of the Fee Assessment table This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4°~o construction inspection fee can be verified The construction inspection fees must be paid prior to the scheduled pre-construction meeting The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public V~'orks Service Center 816 S Coppell Road Meters will be ordered when those fees are paid Appropriate payment of the required fees will help insnrP a s~ic~?ssfill hPginning ~f this prn~e~t WP Inok forward to working with you on this project If }ou have any questions please contact me Sincerely. Charlene La Matt , E I T Graduate Engineer cc Jennifer Armstrong Finance Director Mary Beth Spletzer, Admmistrati~e Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation ~ i F' A R k ~~~ p y # p U C ~~ X ~3 4 -. Y~ ~ ~ F P F L I_ i x ~ t ~± * 7( L + 4 ' G~ 2 * FAX 9 i[ 3 0 4 3 6" 3 DEVELOPMENT FEE TABLE Project: Gateway Business Park, Lot 3B, Block 2 Date: 6/5/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $11,844 00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200 00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $204 34 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Firehne) $9,286 84 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30 00 (100% due at Issuance of Water Meter) Irrigation/Firelme Meter Deposit $90 00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,797 00 (100% due at Issuance of Buildmg Permit) Wastewater Tap Inspection Fee $50 00 (100% due at Issuance of Buildmg Permit) Utility Final Inspection Fee $50 00 (100% due at Issuance of Building Permit) Park Fee $0 00 $0 00 (100% due prior to Filing Plat) Roadway Impact Fee $68,857 14 $68,857 14 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100° o due prior to Start of Construction) TOTAL $95,409 32 TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $68,857 14 DEVELOPMENT FEE WORKSHEET PROJECT: Gateway Business Park, Lot 3B, Block 2 DATE. 6/5/2006 Water Impact Fee: Domestic Meter(s) Irrigation Meter(s) Fireline Meter(s) 1 - 2 inch 1 - 2 inch 0 2 - 8 inch Total #~ 13 16 ESU's @ $900 00 ea (Due prior to issuance of building permit) = 5 33 = 5 33 = 0 = 25 Water Tap Inspection Fee: Total #• 4 Connections @ $50 00 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #• 1 Domestic Meter(s) @ $204 34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: ESU's ESU's ESU's ESU's $11,844 00 $200 00 $204 34 Total #• 1 Irrigation Meter(s) @ $204 34 $204 34 Total #~ 0 Additional Irrigation Meter(s) @ $0 00 $0 00 Total #• 2 Fireline Meter(s) @ $4,541 25 $9,082 50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #• 1 Meter(s) @ $30 00 ea (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total # 3 Meter(s) @ $30 00 ea (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's 5 33 (Due prior to issuance of building permit) @ $900 00 ea Wastewater Tap Inspection Fee: Total #• 1 Connections @ $50 00 ea (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #• 1 Lots @ $50 00 ea (100% due prior to issuance of building permit) $30 00 $90 00 $4,797 00 $50 00 $50 00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Single-family @ $0 00 per lot Multi-family @ $0 00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after T U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292 60 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0 00 $0 00 $68,857 14 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT Gateway Business Park, Lot 3B, Block 2 DATE. 6/5/2006 ROADWAY IMPACT FEE: Service Area * I Category ** Li ht Industrial Land Use ** General Li ht Industrial Building Area (s~ 142,120 Development Units * * 142 12 Vehicle Miles er Development Unit ** 3.23 Fee er Vehicle Mile * * * $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $68,857 14 * (F~gure 4 1 -Roadway Impact Fee Study) ** (Table 4 10 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -The Master Fee Schedule) AtYICl~INTI)tIE: ,$68,$5' 14