Loading...
DR9502-CS 951220ill · -- Halff Associates lll ENGINEERS · ARCHITECTS ° SCIENTISTS PLANNERS · SURVEYORS 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214) 739-0094 FAX (214) 739-0095 December 20, 1995 AVO 1008.95.8015 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/Director of Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Re: FEMA Map Revisions Halff Associates is pleased to present this fee proposal for FEMA map revisions at Andrew Brown Park (West), Deforest Service Center, and the proposed Coppell Senior Citizens Center on Coppell Road. Generally, the services will consist of a Conditional and final Letter of Map Revision application for Andrew Brown Park and a Letter of Map Amendment for the Coppell Senior Citizens Center. The map amendment for the Deforest Road Service Center will be accomplished as a part of the Andrew Brown Park CLOMR. The entire hydraulic engineering, permitting, and surveying effort can be completed for a lump sum fee of $28,700. A summary of the work plan and fee breakdown is shown on Exhibit A. A suggested schedule is shown on Exhibit B. Detailed Scopes of Work for the individual map amendment/revision applications are shown on Exhibits C, and D. Please call if I can answer any questions concerning this proposal or the map revision process. We look forward to assisting the City of Coppell with this important permitting effort. Please authorize by signing below and remm one copy for our files. DATE: DALLAS Sincerely, HALFF ASSOCIATES, INC. Vice President · FORT WORTH · HOUSTON · ARLINGTON · McALLEN · CHICAGO TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL · ENVIRONMENTAL · STRUCTURAL MECHANICAL · ELECTRICAL · SURVEYING · GEOGRAPHIC INFORMATION SYSTEMS /~/ ARCblITECTURE · LANDSCAPE ARCHITECTURE · PLANNING Exhibit A Work Plan and Fee Summary Andrew Brown Park, Deforest Road Service Center, and Coppell Senior Citizens Center Map Revisions Task Andrew Brown Park/Deforest Road Service Center I. Base map Preparations II. Field Surveys III. Stream Hydraulics and CLOMR Application IV. As-Built survey and Final LOMR Application Subtotal Fee $ 2,100 $ 2,100 $ 9,100 $ 4,600 $17,900 Coppell Senior Citizens Center I. Base Map Preparation. II. As-built Surveys III. Stream Hydrology, Hydraulics, and LOMA Application Total $1,200 $1,100 $ 8,500 $ 28,700 EXHIBIT B Suggested Schedule January ~ February I March I April I May 12611 Ju.. I July ID TaskName Duration !3117 1141211214 1111181251 3 11o11712413117 1141211281 5 112119 2 Ig 1161231301 7 11412112814 I Start A Brown Park/Deforest Service Center CLOMR Od 111S 2 Base Map Preparations 15d 1115 ~ ~ ~ ~ : Surveys 1Od 4 Stream Hydraulics/CLOMR Application 2Od 2/. 3/1 i i :~ i: 5 CLOMR Review/Approval 90d i !9,,~ 715 6 Park Construction 9Od i i! 3/4i ! ; .... ; ; ;,/Si 7 AS-built Survey/LOMR Application for A Brown Park 15d i i i i i ! ~'/8 7../26 8 Start Coppell Service Center LOMA Od ~2/t2 Hydrology,Hydraulics,LOMA Application 2Od;iil 2/26· ~~: i i . . 1 Stream 12 iLOMAReview/Approval 90d iil i 3/25 7~26 Task ~ Summary ~ R~I~:I Up Progm~ Project: Coppell Map Revisions Date: 1115/96 Progress Rolled Up Task Milestone ~ Rolled Up Milestone ~ Page I Exhibit C Scope of Work City of Coppell Andrew Brown Park - West DeForest Road Service Center Letters of Map Revision December 1995 I. Basemap Preparation A. Obtain proposed park improvements site plan from Mesa Design Group. B. Obtain Deforest Road Service Center site plan from the city. C. Obtain official city topographic map electronic files. D. Plot topography at Andrew Brown Park West. E. Plot topography at Deforest Road Service Center. F. Transfer Architects site plan to base map, show benchmarks on plan, add legend, notes, north arrow, scale etc. G. Create a location map for the application. H. Reconstruction Surveys. A. Site Reconnaissance. B. Locate and use nearest FEMA Reference Mark. C. Survey spot elevations in vicinity of proposed improvements at Park. D. Survey first floor elevations and spot elevations at existing Deforest Road Service Center. E. Process field data and check for accuracy and closure. F. Plot survey information. Conditional Letter of Map Revision (CLOMR) application, to the Federal Emergency Management Aeencv (FE~). A. Flood Insurance Study Hydraulics. 1. Contact FEMA Project Library to obtain current FIS effective models. 2. Obtain LOMR information for recent nearby projects from consultants. 3. Locate, execute and debug, duplicate effective FIS model, plot cross-sections and profile. 4. Compare results to current FEMA FIS effective model, update as needed. 5. Build pre-project condition model to fit improvements and include recent LOMR'S 6. Execute and debug pre-project model, plot cross-sections and profile. 7. Compare to FEMA duplicate effective (base) model, construct summary tables. 8. Locate current effective FIS Floodway model. Halff Associates, Inc. 1 1008.95.8015 Exhibit C Scope of Work 9. Modify Floodway model consistent with pre-project conditions model. 10. Execute and debug Floodway model, construct summary table. 11. Build CLOMR hydraulic model based on proposed changes in Park. 12. Execute and debug model, plot proposed cross-sections and profile. 13. Compare to pre-project model, prepare summary tables. 14. Modify Floodway model to reflect proposed project. 15. Execute and debug model, prepare summary table. 16. Create hard copy and digital copy of effective, pre-project and proposed project hydraulic models. B. Complete FEMA CLOMR forms (MT-2) and attachments. 1. Form 1 - Revision Requester and Community Official Form. 2. Form 2 - Professional Engineer Certification Form. 3. Form 4 - Riverine Hydraulic Analysis Form. 4. Form 5 - Riverine/coastal Mapping Form C. Prepare Miscellaneous tables. 1. Water surface elevation check table for CLOMR. 2. Water surface elevation and velocity comparison table for FIS discharges. D. Project site plan. 1. Edit site plan exhibit to include proposed flood plain, floodway, benchmarks, etc. 2. Plot site plan exhibit for application. E. Revise Flood Insurance Rate Map (FIRM) Community-Panel No. 48017 0010 E 1. Locate panel. 2. Delineate and digitize FIS FIRM map centerline, flood plain, floodway. 3. Merge FIS information with site plan exhibit. 4. Overlay proposed project delineation at FIS FIRM map scale, for modified FIRM Exhibit. F. Other exhibits. 1. Compare pre-project with proposed project FIS model cross sections 2. Geotechnical or soils report excerpts by others. 3. Profile plot comparing pre-project with proposed project conditions. Halff Associates, Inc. 1008.95.8015 Exhibit C Scope of Work G. Report Writing 1. Letter of transmittal. 2. Table of contents, figures, addenda, and list of tables. 3. Project description. 4. Compile photographs for report.. H. Assemble CLOMR application 1. Generate report, edit as needed. 2. Review, sign and seal report and plans. 3. Copy report and exhibits 5 times. 4. Assemble and bind 5 copies of report. I. CLOMR Submittal 1. Meet with the City for review and signatures 2. Submit to FEMA Headqumers via overnight mail. The Initial Review Fee ($560) is not included in the budget. Additional review and mapping fees will be required but mounts are unknown at this time. These additional fees are not a part of this budget. 3. Mail copies to FEMA Region VI office. J. CLOMR Review and Coordination 1. Publish public notice of floodplain change in the official local newspaper. 2. Coordination with FEMA during review stage. IV. Final letter of Map Revision (LOMR) Application to FEMA. (Scope and Budgets assume Project is built as planned and revisions to CLOMR hydraulics are not needed. A. As built surveys. B. Update Site Map with As-built survey information. C. Complete LOMR Forms (MT-2) and attachments. 1. Form 1 - Revision Requester and Community Official Form. 2. Form 2 - Professional Engineer Certification Form. 3. Form 4 - Riverine Hydraulic Analysis Form. 4. Form 5 - Riverine/coastal Mapping Form. D. Assemble LOMR application. Halff Associates, Inc. 3 1008.95.8015 Exhibit C Scope of Work E. LOMR Submittal to FEMA Headquarters. F. LOMR review and coordination. V. Items to be Provided by City, as Necessary_ and When Available. · City topographic mapping electronic files. · Review and Application fees, if any. · Plats · Site plans · Deeds · Compaction test results. · Geotechnieal studies. VI. Tasks Not Included in Scope. · · · · · 404 (Wetlands) permit applications. Other special environmental studies. Drainage or flood control design services. Preparation of Construction Documents. Boundary surveys. Halff Associates, Inc. 1008.95.8015 Exhibit D Scope of Work City of Coppell Coppell Senior Citizens Center Letter of Map Amendment Application December 1995 I. Basemap Preparation A. Obtain proposed site plan. B. Plot topo at proposed Coppell Senior Citizens Center. C. Transfer site plan to base map, show benchmarks on plan, add legend, notes, north arrow, scale etc. D. Create a location map for the application. II. As-Built Surveys. A. Site Reconnaissance. B. Locate and use nearest FEMA Reference Mark. C. Survey first floor elevations and spot elevations in vicinity of Center. D. Process field data and check for accuracy and closure. E. Plot survey information. III. Letter of Map Amendment LOMA application, to the Federal Emergency Management A~enev (FEMA). A. Flood Insurance Study Hydraulics and Hydrology. 1. Contact FEMA Project Library to obtain current FIS effective models. 2. Obtain LOMR information for recent nearby projects from consultants. 3. Locate, execute and debug, Stream G-1 hydraulics model, plot cross-sections and profile. 4. Compare results to current FEMA FIS effective model, update as needed. 5. Determine FIS discharges at Coppell Road using Coppell Storm Water Mgmt. Study HEC-1 Model. 6. Extend FIS hydraulic model to Coppell Road for revised existing conditions. 7. Execute and debug revised FIS model, plot cross-sections and profile. 8. Locate current effective FIS Floodway model. 9. Modify Floodway model consistent with revised FIS model. 10. Execute and debug Floodway model, construct summary table. HalffAssociates, Inc. 1 1008.95.8015 Exhibit D Scope of Work 11. Create hard copy and digital copy of effective, pre-project and proposed project hydraulic models. B. Complete FEMA LOMA forms (MT- 1) and attachments. 1. Form 1 - Property information. 2. Form 2 - Elevation information. 3. Form 3 - Hydrologic Analysis (MT-2) 4. Form 4 - Riverine Hydraulic Analysis Form (MT-2). C. Prepare Miscellaneous tables. 1. Water surface elevation check table for LOMA. 2. Water surface elevation and velocity comparison table for FIS discharges. D. Project site plan. 1. Edit site plan exhibit to include corrected floodplain and floodway, benchmarks, etc. 2. Plot site plan exhibit for application. E. Revise Flood Insurance Rate Map (FIRM) Community-Panel No. 48017 0010 E 1. Locate panel. 2. Delineate and digitize FIS FIRM map centerline, floodplain, floodway. 3. Merge FIS information with site plan exhibit. 4. Overlay delineation's at FIS FIRM map scale, for modified FIRM Exhibit. F. Other exhibits. 1. Plot cross sections for revised FIS model cross sections. 2. Soils information. 3. Profile plot. G. Report Writing 1. Letter of transmittal. 2. Table of contents, figures, addenda, and list of tables. 3. Project description. 4. Compile photographs for report. Halff Associates, Inc. 1008.95.8015 Exhibit D Scope of Work H. Assemble LOMA application 1. Generate report, edit as needed. 2. Review, sign and seal report and plans. 3. Copy report and exhibits 5 times. 4. Assemble and bind 5 copies of report. I. LOMA Submittal 2. 3. J. Meet with the City for review and signatures Submit to FEMA Headquarters via overnight mail. An Initial Review Fee is not included in the budget and should not be required as long as submittal is for map correction. Mail copies to FEMA Region VI office. LOMA Review and Coordination IV. Items to be Provided by City, as Necessary and Wlnen Avnilnble. City Topographic Mapping Electronic Files. Review and Application fees, if any. Plats Site Plans Deeds Geoteehnieal Studies. V. Tasks Not Included in Scope. 404 (Wetlands) permit applications. Other special environmental studies. Preparation of Construction Documents. Boundary Surveys. Halff Associates, Inc. 3 1008.95.8015