Connell Skaggs-CS 861205
~
.~
POWELL & POWELL
3988 N. Central Expwy. Suite 1130
DALLAS. TEXAS 75204
.~
[LJElflf[Iuu @[f lfOO~~~I}0{]Dlfu~fL
(214) 522.4660
Jackson
RE:
TO
Sallinger, Nichols, Jackson, Kirk & Dillard
Connell Ska s Addition Co ell TX
1800 Lincoln Plaza
Dallas, Texas 75201
WE ARE SENDING YOU 1XI Attached 0 Under separate cover via Courier
the following items:
o Shop drawings
o Copy of letter
o Prints
o Change order
o Plans 0 Samples
00 c.o~~ F.~~im~~~
o . Specifications
COPIES DATE NO. DESCRIPTION
1 11-'1-86 -- r.nn~rruction Cost Estimate for a box culvert alon2 the west line
of the site from Sandy Lake Road to "Willow Lane"
THESE ARE TRANSMITTED as checked below:
o For approval 0 Approved as submitted 0 Resubmit_copies for approval
at For your use 0 Approved as noted 0 Submit_copies for distribution
0 As req uested 0 Returned for corrections 0 Return_corrected prints
0 For review and comment Kl As requested by Mr. Kevin White - Connell Development Co.
o FOR BIOS DUE 19 o PRINTS RETURNED AFTER LOAN TO US
REMARKS
/~
Mr. Ed Powell - City of Coppell wi enc. (by courier)~
ML. Kt:vlu WhlLt: - CuulU:ll J)t:v. wI euc.
COpy TO Mr. Bill Stapp - Connell Dev. wI enc.
SIGNED:
A.
PIOOUCI_J 1-;.....-- Q""
If enclo.ure. ere not e. noted. kIndly notify u. .t onee.
Jr.
,.
~
..
""'""
P&:P w.o. No. 3354-85-10-6
Connell Skaggs Addition
December 5, 1986
COST ESTIMATES FOR BOX CULVERT CONSTRUCTION
FROM SANDY LAKE ROAD TO "WILLOW LANE"
Length = 1234'
Breakdown by Owner:
Connell
Boorhem
Hinckley
10' x 8' Single Box Culvert
Pre-Cast:
(at $270/LF)
Box Culvert
Upstream Transition
Downstream Transition
566'
472'
196'
Cost Per Property Owner Based on Frontage of Box
Connell
Boorhem
Hinckley
3354/WDlOOl
.46 (345,000) =
.38 (345,000) =
.16 (345,000) =
46%
38%
16%
$335,000.00
5,000.00
5,000.00
$345,000.00
$159,000.00
$131,000.00
$ 55,000.00