Loading...
Connell Skaggs-CS 861205 ~ .~ POWELL & POWELL 3988 N. Central Expwy. Suite 1130 DALLAS. TEXAS 75204 .~ [LJElflf[Iuu @[f lfOO~~~I}0{]Dlfu~fL (214) 522.4660 Jackson RE: TO Sallinger, Nichols, Jackson, Kirk & Dillard Connell Ska s Addition Co ell TX 1800 Lincoln Plaza Dallas, Texas 75201 WE ARE SENDING YOU 1XI Attached 0 Under separate cover via Courier the following items: o Shop drawings o Copy of letter o Prints o Change order o Plans 0 Samples 00 c.o~~ F.~~im~~~ o . Specifications COPIES DATE NO. DESCRIPTION 1 11-'1-86 -- r.nn~rruction Cost Estimate for a box culvert alon2 the west line of the site from Sandy Lake Road to "Willow Lane" THESE ARE TRANSMITTED as checked below: o For approval 0 Approved as submitted 0 Resubmit_copies for approval at For your use 0 Approved as noted 0 Submit_copies for distribution 0 As req uested 0 Returned for corrections 0 Return_corrected prints 0 For review and comment Kl As requested by Mr. Kevin White - Connell Development Co. o FOR BIOS DUE 19 o PRINTS RETURNED AFTER LOAN TO US REMARKS /~ Mr. Ed Powell - City of Coppell wi enc. (by courier)~ ML. Kt:vlu WhlLt: - CuulU:ll J)t:v. wI euc. COpy TO Mr. Bill Stapp - Connell Dev. wI enc. SIGNED: A. PIOOUCI_J 1-;.....-- Q"" If enclo.ure. ere not e. noted. kIndly notify u. .t onee. Jr. ,. ~ .. ""'"" P&:P w.o. No. 3354-85-10-6 Connell Skaggs Addition December 5, 1986 COST ESTIMATES FOR BOX CULVERT CONSTRUCTION FROM SANDY LAKE ROAD TO "WILLOW LANE" Length = 1234' Breakdown by Owner: Connell Boorhem Hinckley 10' x 8' Single Box Culvert Pre-Cast: (at $270/LF) Box Culvert Upstream Transition Downstream Transition 566' 472' 196' Cost Per Property Owner Based on Frontage of Box Connell Boorhem Hinckley 3354/WDlOOl .46 (345,000) = .38 (345,000) = .16 (345,000) = 46% 38% 16% $335,000.00 5,000.00 5,000.00 $345,000.00 $159,000.00 $131,000.00 $ 55,000.00