Freeport NIP(8.1)-CS060613Brice Barclay Duke Construction 5495 Belt Line Rd, Suite 360 Dallas TX 75254 T H E C 1 T Y 0 F COPPELL z t s RE Duke Freeport, Lot 2 Block A/ Freeport 14 15 Final Acceptance Dear Mr Barclay Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project The two -year maintenance bonds and as -built drawings have been received from the contractor Maturity on the bonds will be two years from the date of this letter Please find your letter of September 29, 2005 attached to this letter as a reminder of your commitment to escrow funds for Bethel Road improvements adjacent to the referenced development You may notify the MS4 (City of Coppell) at any time during the two -year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond period If any punchlist items are noted at that time, you will he contacted to make repairs Thanks for your cooperation Sincerely, G F Ay r li L; k 4 F= C F Larry Davis Construction Inspector.*_ Keith R. Marvin, P E Office Phone (972) 30K4 -3684 ^,sistant City Fngineer Fax (972) 304 -3570 1 cc Ken Griffin, P E Director of Engineering Public Works Glenn Hollow ell, P E Asst Director of Public Works Greg Jones Chief Building Official Tim Oates, Fire Marshal Mr Jack Bans, P E Pacheco Koch Consulting Engineers F June 13, 2006 2; *4. Y. 9 U4 ?U 3 September 29, 2005 Duke CONSTRUCTION The City of Coppell 255 Parkway Blvd. Coppell, TX 75019 ATTN. Engineering Dept. Re: Bethel Road 1— ST 99 -05 /Freeport XIV &XV Duke Project No. FPN014 -000 To Whom It May Concern. cc: Jeff Turner Duke Realty Corporation Teddy Peinado Duke Construction, L.P Chad Jackson Pacheco Koch Jack Evans Pacheco Koch File 5495 Belt Line Road Atlanta Dallas Orlando Suite 360 Chicago Indianapolis Raleigh Dallas, TX 75254 Cincinnati Minneapolis St. Louis 972.361.6700 Cleveland Nashville Tampa www.dukerealty.com Columbus COPY In response to your letter dated September 21,2005 from Kenneth M. Griffin to Craig Bond of TranSystems (letter attached) Duke Construction, L.P agrees to pay for engineering and construction costs required for the tie -in of storm sewer from the Freeport XIV XV site to the future Bethel Road storm drainage system. In addition, Duke agrees to pay for approximately 1,200 linear feet of 5' sidewalk to be constructed by The City of Coppell with the Bethel Road I project. To ensure funding for the above, Duke Construction will place in escrow a dollar amount based upon a scope of work and estimate prepared by Pacheco Koch Consulting Engineers and agreed upon by both parties. This estimate will be prepared upon TranSystems' completion of the Bethel Road I plan revisions required for the tie -in If in the event actual construction costs vary from the escrow amount either Duke Construction shall pay the overage amount or be issued a refund check by The City of Coppell for the remaining escrow balance. Should you have any questions regarding this matter, please do not hesitate to call me at the office at (972) 361 -6743 Sincerely, Bruce S. Barclay Project Manager Duke Construction Encl. Letter from Kenneth Griffin dated 9 -21 -05 TranSystems Signed proposal