Loading...
Coppell Health-CS 890119 - COPPELL PUBLIC WORKS MEMORANDUM TO: Russell Engineer January 19, 1989 FROM: RE: Coppell Health Care Center --A" c.. s IJ olH!..~ r:; .;' 12"cJ In In reviewing the construction plans received January 10. 1989. Staff has a major concern with the depth of the sanitary sewer line. The depth is dictated by the existing grades of the sanitary sewer line east of this location where Heartz Road north is planned. The construction plans for the Coppell Health Care Center indicates a maximum depth of 2~ feet for the sanitary sewer line. That depth does not meet our Subdivision Ordinance requirement. Taking into consideration the construction of the brick pavers and after line stabilization, the sanitary sewer is expected to be into the sub base. If we do not address the Heartz Road sewer line soon we will find ourselves with situations throughout the Town Center area similar in degree or worse than what is described above. Please provide me with your comments concerning this as soon as possible. A strategy to avoid this problem needs to be developed. SGG/sm cc: Public Works DRC Representatives \ \