Loading...
St Ann Catholic-CS060615CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Case : Third Replat of St. Ann Catholic Parish, Replat P & Z HEARING DATE. C C HEARING DATE STAFF REP LOCATION SIZE OF AREA. CURRENT ZONING REQUEST APPLICANT June 15, 2006 July 11, 2006 Gary L. Sieb, Planning Director 700 E. Sandy Lake Road 19 52 acres SF -9 and SUP (S- 1121 -SF -9) Third replat of St. Ann Catholic Parish to relocate fire lanes and various utility easements allowing for expansion of church facilities. St. Ann Catholic Parish Jennifer Lindsey 180 Samuel Blvd. Coppell, Texas 75019 (972) 393 -5544 x 1104 Fax (972) 462 -1617 Surveyor• Peiser Surveying 801 Enterprise Dr Flower Mound, Texas 75028 (972) 724 -5776 Fax (972) 724 -5779 HISTORY Tlus property has been plated three times. It was first platted in 1988 on approximately 8 5 acres, which was the initial church site. The original plat was incorporated into a replat in 1993, which included the original 8 5 acres and an additional 11 acres totaling 19 52 acres. Two lots were shown on the replat- -Lot One that covered the church site, and Lot Two which included the land upon which the Item # 5 Page 1 of 3 Georgetown Shopping Center was constructed. In 1997, a second replat was approved which combined the two lots into one This third replat retains the one large lot, but changes location of utility easements and fire lanes. TRANSPORTATION Sandy Lake Road is a C413, four -lane, divided street built to standard in a 110 -foot right -of -way Samuel Boulevard is a C2U, two -lane, undivided collector street with a 60 -foot right -of -way SURROUNDING LAND USE & ZONING North — The Meadows, Sec 6, Phase I, Single Family Subdivision, "PD- 105 -SF -9" Planned Development - Single Family -9 South - Northlake Woodlands, Single Family Subdivision, "PD- 91 -SF -7" Planned Development - Single Family -7 East - The Meadows, Sec. 1, Single Family Subdivision, "SF -9" Single Family -9 West - Coppell Church of Christ; Lee Elementary; Children's First Academy; "C" Commercial COMPREHENSIVE PLAN The May 1966 Comprehensive Plan as amended, shows the property as suitable for Public/Institutional uses DISCUSSION The purpose of this replat request is to take a parcel that has already been platted and alter utility easements and fire lanes This is a companion request to a zoning change on the same parcel, and the replat will accommodate utility easement and fire lane relocations that need to be accomplished during the development and redevelopment of the Georgetown Center into additional St. Ann church - related activities RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION Staff is recommending APPROVAL of this request, subject to the following conditions Contact Rick Fielding at (972) 888 -1344 with TXU Electric Delivery regarding utility relocations 2. Engineering and Fire Department comments (attached) Item # 5 Page 2 of 3 ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request ATTACHMENTS 1) Replat document Item # 5 Page 3 of 3 T H E C 1 T Y O F COPPELL E 4 Proiect ID RP -06 -0024 Address Proiect TVpe Application Date Case Manager Proiect Description Replat 5/18/2006 CITY OF COPPELL 2nd DRC REPORT Proiect Name T H E C 1 T Y O F COPPED. r o e X e b a 9 Third Replat of Saint Ann Catholic Church To relocate the fire lane and various utility easements allow the expansion of church facilities into the former Georgetown Shopping Center 1 of 1 Aaencv Comments Fire Administration 1 All revisions to the alignments of the fire lanes need to be finalized prior to city council consideration Revised alignments need to be consistently reflected on all applicable plans 2 Maximum fire hydrant separation is 300 feet, and all hydrants need to be three to six feet from a fire lane. 3 Preliminary Utility Plans need to be submitted reflecting new hydrant locations. Engineering 1 Will modifications to the existing water system be required in order for the relocated fire lane to be compliant pertaining to fire hydrant spacing? If so, include a plan 2 Proposed paving should not encroach into the fire lane Additional comments may be generated upon detailed engineering review CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Case No. 5- 1121R -SF -9, St. Ann Catholic Parish P & Z HEARING DATE C C HEARING DATE STAFF REP LOCATION SIZE OF AREA CURRENT ZONING June 15, 2006 July 11, 2006 Gary L. Sieb, Planrung Director 700 E Sandy Lake Road 19 52 acres SF -9 and SUP (S- 1121 -SF -9) REQUEST Zoning change request from SF -9 and S- 1121 -SF -9 (Special Use Permit- 1121 - Single Family 9) to 5- 1121R -SF -9 (Special Use Permit-1121 Revised - Single Family 9), to amend and expand the existing SUP Site Plan for St. Ann Catholic Parish. APPLICANT St. Ann Catholic Parish Architect. Page /Southerland/Page Jennifer Lindsey E. Liebrecht, AIA 180 Samuel Blvd. 3500 Maple Ave. Coppell, Texas, 75019 Suite 600 (972) 393 -5544 x1104 Dallas, TX. 75219 Fax (972) 462 -1617 (214) 522 -3900 Fax (214) 522 -4380 HISTORY This property has had an interesting history over the last few years. In 1989, an ordinance was passed allowing construction of the first phase of St. Ann on approximately nine acres of land fronting Samuel Boulevard. That ordinance also allowed stucco budding Item # 4 Page 1 of 3 materials. In 1997, an expansion to the church was allowed resulting in a 36,000- square -foot sanctuary and a 6,000 - square -foot administrative wing. An extension of time to build the expansion was approved in 1998, and the current building was constructed. In January of 2006, St. Ann requested and was granted a change in zoning of the property commonly referred to as the Georgetown Center from "C ", Commercial to SF -9 The purpose of rezoning this 5 3 -acre parcel was to create a common, 20 -acre lot with all the same base zoning—SF-9 The Georgetown Center was constructed in 1984 as a strip retail shopping center and performed that function until St. Ann bought the property in 1993 It continued to operate as a retail center for the next ten years. In 2000 -2001, the church determined it needed more space for church activities, and began to convert the building to parish use The church now wishes to remodel the existing structure so it can function as a religious entity in a more efficient way TRANSPORTATION Sandy Lake Road is a C41), four -lane, divided street built to standard in a 110 -foot right -of -way Samuel Boulevard is a C2U, two -lane, undivided collector street with a 60 -foot right -of -way SURROUNDING LAND USE & ZONING North – The Meadows, Sec 6, Phase I, Single Family Subdivision, "PD- 105 -SF -9" Planned Development - Single Family -9 South - Northlake Woodlands, Single Family Subdivision, "PD- 91 -SF -7" Planned Development - Single Family -7 East - The Meadows, Sec. 1, Single Family Subdivision, "SF -9" Single Family -9 West - Coppell Church of Christ; Lee Elementary; Children's First Academy; "C" Commercial COMPREHENSIVE PLAN- The May 1966 Comprehensive Plan as amended, shows the property as suitable for Public /Institutional uses. DISCUSSION There are several reasons for this zoning change One, the applicant wishes to alter the zoning pattern so all land owned by St. Ann retains the same zoning classification (SUP -SF -9) Two, the church proposes to change portions of the interior and exterior of the former Georgetown Shopping Center to better accommodate church activities. Three, additional parking, play areas, new landscaping and a stucco finish on a Item # 4 Page 2 of 3 portion of the existing building is requested to improve appearance and enhance the unity of the site Changing the zoning so all land owned by St. Ann is identical dust makes sense, since the church proposes to utilize the former shopping center for church activities, and the majority of the site has SUP and SF -9 zoning today Staff has no objection to the rezoning request. With regard to the remodeling of a portion of Georgetown, plans show roughly 17,700 square feet of the 59,000 square foot center will be remodeled Specifically, the north and west "L" portion of the center will be refaced in a stucco material The remainder of the building will be repainted in a buff color to resemble a stucco building. In addition, the north side of the building will be remodeled with a covered, 3,600- square- foot galleria and new entrance features. The interior space will be altered to accommodate ten meeting rooms, a chapel, nursery, serving pantry, storerooms and toilets Plans also call for revised parking, a new playground on the west end of the existing building and additional landscaping and color beds. Because the remodeling will be more in line with the existing church (similar building materials, color, and architectural style), staff has no objection to this portion of the project. Additional parking is being proposed (a net increase in parking) which complies with our landscaping standards, and a brick wall behind the north wing of the center will be removed and replaced with landscaping, additional parking, and a re- aligned fire lane Staff feels these alterations will improve the overall appearance of the site and, with minor changes to the plan listed as "conditions" below, can support this request. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION Staff is recommending APPROVAL of this request, subject to the following conditions 1 Clearly show relocated fire lanes on both the Site Plan and Landscape Plan. 2 Provide additional fire hydrants as required by the Fire Department. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date ATTACHMENTS 1) Submittal package (perspective, elevations, site plan, floor plans, landscape plan, computer - generated perspective drawings) Item # 4 Page 3 of 3