Amberpoint BP 2R-LR060526REPORT OF REINFORCING STEEL OBSERVATION lt~rracon Consultlnp Engineers 3 SWentlsts 8901 Carpenter Frwy Suite #100 Dallas, 'texas 75247 f2141ti30-1010 Date of Service Client No.• Client: Services. 05/26/06 50854 Report No : 94051418 0417 Project No.• 94051418 Transwestern Commercial Services Project: AmberPomt Business Park 5001 Sprang Valley Rd Ste 600 W Buildings 4, 5 and 6 Dallas, TX 75244 505 South Royal Lane Coppell, TX Observe placement of reinforcing for compliance with furnished drawings PROJECT DATA Drawings Utilized CO O1 and C1 O1, dated 04/10/06 Locations/Items Observed: Pavement, Parking and Fire Lanes, Nearest to Bulding on E Side of Building #4 Pavement, from SE corner of Building #4 to NE corner of Building #4 Test Method Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORREC7 ITEMS OBSERVEb CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash 8 Debris Removed X Proper Bar Supports ~{ Lapped Splices X Number of Bars X Proper Cover/Clearance X Discrepancies/Comments The following discrepancies were noted and corrected at the rime of this observation. 1 Dowels were bent downward from truck traffic Dowels were raised and straightened out before placement of concrete Field Results Report To Jeff Slama Technician: E Jerigan Report Distrilaution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager 309acs This report is exGusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.