Gateway BP(1.6)-CS060622T H E C I T Y O F
COPPELL
Y ~ >~ .,
,~ ""..'7
X h ~ A
Patrick Acker, P E
Halff Associates, Inc
8616 Northwest Plaza Drwe
Dallas, TX 75225
RE. Gateway Business Park, Lot 3B, Block 2
Fee Assessment Letter -Revised
Dear Mr Acker
June 22, 2006
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell ~n the amount of $17.214.29 and forward
to the Eng~neenng Department along wrth a copy of the Fee Assessment table This amount represents the
Roadway impact fees due after applying a 75% credit based on previous development agreements Please
note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact
Fees until the issuance of a Budding Permit. Please provide a copy of the Engineer's estimate or contract
to our office so the 2% & 4°r° construction mspect~on fee can be verified The construction inspection
fees must be paid prior to the scheduled pre-construction meeting
The additional fees for water and sewer taps, water meters and ut~lrty inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S Coppell Road Meters will be ordered
when those fees are paid
.^.pi,ropr.;,te payment of the requjred f es ~.:~.11 help ;:.sure a :,ucccssful beb:rli..ng of thcs prcJect `,';';, l:,cl:
torward to working with you on this project If you have any questions, please contact me
Sincerely,
Keith R Mari m, P E
Assistant City Engineer
cc Jennifer Armstrong, Finance Director
Mary Beth Spletzer Admm~strative Secretary, Bu~ldmg Inspections
Glenn Hollowell. Assistant Director of Public Works
Greg Jones, Chief Bu~ld~ng Official
Brad Reid Director of Parks and Recreation
~.. FP F H ~^.a ~ * P O Ec K 54, 9 * ~~ r PPE _ I_ rx ~SU 19 * 7 E ~ u~ 2 4h 2 0022 * FA x 972x' G4 363
DEVELOPMENT FEE TABLE
Project: Gateway Business Park, Lot 38, Block 2
Date: 6/21/2006
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $11,844 00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $200 00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $204 34
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Firelme) $9,286 84
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30 00
(100% due at Issuance of Water Meter)
Irrigation/Firehne Meter Deposit $90 00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,797 00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50 00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50 00
(100% due at Issuance of Building Permit)
Park Fee $0 00 $0 00
(100% due prior to Filing Plat)
Roadway Impact Fee $17,214.29 $17,214 29
(100% due prior to Filing Plat)
Street Light Fee Information not Avai lable
(l0U% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acce tance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) ~_
TOTAL $43,766 47
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $17,214 29
DEVELOPMENT FEE WORKSHEET
PROJECT: Gateway Busine:
DATE: 6/21/2006
Water Impact Fee:
Domestic Meter(s)
Irrigation Meter(s)
Fireline Meter(s)
s Park, Lot 3B, Block 2
1 - 2 inch = 5 33 ESU's
1 - 2 inch = 5 33 ESU's
0 = 0 ESU's
2 - 8 inch = 2.5 ESU's
Total #~ 13 16 ESU's @ $900 00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #~ 4 Connections @ $50 00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #~ 1 Domestic Meter(s) @ $204 34
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
$11, 844 00
$200 00
$204 34
Total #~ 1 Irrigation Meter(s) @ $204 34 $204 34
Total #~ 0 Additional Irrigation Meter(s) @ $0 00 $0 00
Total #~ 2 Fireline Meter(s) @ $4,541 25 $9,082 50
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #~ 1 Meter(s) @ $30 00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #~ 3 Meter(s) @ $30 00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's 5 33 @ $900 00 ea
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #~ 1 Connections @ $50 00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #~ 1 Lots @ $50 00 ea.
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
$30 00
$90 00
$4,797 00
$50 00
$50 00
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
Single-family @ $0 00 per lot
Multi-family @ $0 00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way
This fee cannot be assessed until after T U Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292 60 per light will be assessed
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$0 00
$0 00
$17,214.29
Information not Available
Information not Available
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Gateway Business Park, Lot 3B, Block 2
DATE: 6/21/2006
ROADWAY IMPACT FEE:
Service Area * 1
Cate o ** Li ht Industrial
Land Use ** General Li ht Industrial
Buildm Area (s 142,120
Develo ment Units ** 142 12
Vehicle Miles er Develo ment Unit ** 3.23
Fee er Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $68,857 14
* (Figure 4 1 -Roadway Impact Fee Study)
* * (Table 4 10 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -The Master Fee Schedule)
Percent of Credit Toward Roadway Impact Fees 75%
Total Credit $51,642.86