Loading...
Gateway BP(1.6)-CS060622T H E C I T Y O F COPPELL Y ~ >~ ., ,~ ""..'7 X h ~ A Patrick Acker, P E Halff Associates, Inc 8616 Northwest Plaza Drwe Dallas, TX 75225 RE. Gateway Business Park, Lot 3B, Block 2 Fee Assessment Letter -Revised Dear Mr Acker June 22, 2006 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell ~n the amount of $17.214.29 and forward to the Eng~neenng Department along wrth a copy of the Fee Assessment table This amount represents the Roadway impact fees due after applying a 75% credit based on previous development agreements Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Budding Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4°r° construction mspect~on fee can be verified The construction inspection fees must be paid prior to the scheduled pre-construction meeting The additional fees for water and sewer taps, water meters and ut~lrty inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S Coppell Road Meters will be ordered when those fees are paid .^.pi,ropr.;,te payment of the requjred f es ~.:~.11 help ;:.sure a :,ucccssful beb:rli..ng of thcs prcJect `,';';, l:,cl: torward to working with you on this project If you have any questions, please contact me Sincerely, Keith R Mari m, P E Assistant City Engineer cc Jennifer Armstrong, Finance Director Mary Beth Spletzer Admm~strative Secretary, Bu~ldmg Inspections Glenn Hollowell. Assistant Director of Public Works Greg Jones, Chief Bu~ld~ng Official Brad Reid Director of Parks and Recreation ~.. FP F H ~^.a ~ * P O Ec K 54, 9 * ~~ r PPE _ I_ rx ~SU 19 * 7 E ~ u~ 2 4h 2 0022 * FA x 972x' G4 363 DEVELOPMENT FEE TABLE Project: Gateway Business Park, Lot 38, Block 2 Date: 6/21/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $11,844 00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200 00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $204 34 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Firelme) $9,286 84 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30 00 (100% due at Issuance of Water Meter) Irrigation/Firehne Meter Deposit $90 00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,797 00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50 00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50 00 (100% due at Issuance of Building Permit) Park Fee $0 00 $0 00 (100% due prior to Filing Plat) Roadway Impact Fee $17,214.29 $17,214 29 (100% due prior to Filing Plat) Street Light Fee Information not Avai lable (l0U% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acce tance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) ~_ TOTAL $43,766 47 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $17,214 29 DEVELOPMENT FEE WORKSHEET PROJECT: Gateway Busine: DATE: 6/21/2006 Water Impact Fee: Domestic Meter(s) Irrigation Meter(s) Fireline Meter(s) s Park, Lot 3B, Block 2 1 - 2 inch = 5 33 ESU's 1 - 2 inch = 5 33 ESU's 0 = 0 ESU's 2 - 8 inch = 2.5 ESU's Total #~ 13 16 ESU's @ $900 00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #~ 4 Connections @ $50 00 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #~ 1 Domestic Meter(s) @ $204 34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: $11, 844 00 $200 00 $204 34 Total #~ 1 Irrigation Meter(s) @ $204 34 $204 34 Total #~ 0 Additional Irrigation Meter(s) @ $0 00 $0 00 Total #~ 2 Fireline Meter(s) @ $4,541 25 $9,082 50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #~ 1 Meter(s) @ $30 00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #~ 3 Meter(s) @ $30 00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's 5 33 @ $900 00 ea (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #~ 1 Connections @ $50 00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #~ 1 Lots @ $50 00 ea. (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): $30 00 $90 00 $4,797 00 $50 00 $50 00 Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Single-family @ $0 00 per lot Multi-family @ $0 00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after T U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292 60 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0 00 $0 00 $17,214.29 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Gateway Business Park, Lot 3B, Block 2 DATE: 6/21/2006 ROADWAY IMPACT FEE: Service Area * 1 Cate o ** Li ht Industrial Land Use ** General Li ht Industrial Buildm Area (s 142,120 Develo ment Units ** 142 12 Vehicle Miles er Develo ment Unit ** 3.23 Fee er Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $68,857 14 * (Figure 4 1 -Roadway Impact Fee Study) * * (Table 4 10 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -The Master Fee Schedule) Percent of Credit Toward Roadway Impact Fees 75% Total Credit $51,642.86