Loading...
Belt Line Trade-LR060616 REED EnGinEERinG GEOTECHNICAL AND G R Cl U F' ENVIRONMENTAL CONSUL TANTS REPORT OF FIELD GRADATION TESTS Belt Line Trade Center Building A 500 E. Belt Line Road Coppell, Texas REPORTED TO: 101 5420 LBj Freeway, Suite 1275 Dallas, Texas 75240 ATTN: Mr. Chris Parnell CONTRACTOR: Raymond Construction Sieve Size 1-3/4" Date 05-31-06 S ecification Percent Passin % Sieve Size 100 #4 Location Bldg Pad: 150'8, 69'W of N.E. building corner Bldg Pad: 150'S, 138'W of N.E. building corner Bldg Pad: 150'S, 207'W of N. E. building corner Bldg Pad: 150'S, 276'W of N.E. building corner Bldg Pad: 150'S, 345'W of N.E. building corner Bldg Pad: 150'S, 414'W of N.E. building corner Bldg Pad: 150'S, 483'W of N.E. building corner Bldg Pad: 150'S, 552'W of N.E. building corner Bldg Pad: 150'S, 621'W of N.E. building corner Bldg Pad: 150'S, 690'W of N.E. building corner Bldg Pad: 150'S, 759'W of N.E. building corner Bldg Pad: 150'S, 828'W of N.E. building corner Bldg Pad: 150'8, 897'W of N.E. building corner Bldg Pad: 150'8, 966'W of N.E. building corner Bldg Pad: 150'8, 1035'W of N.E. building corner Bldg Pad: 150'S, 11 04'W of N.E. building corner Bldg Pad: 150'S, 1173'W of N.E. building corner Bid Pad: 150'S, 1242'W of N.E. buildin corner Mail Distribution: (1) IDI/Mr. Chris Parnell (1) Raymond Construction/ Mr. David Layne REPORT NO. 19 REPORT DATE: 06-16-06 REG PROJECT NO. 13335 TECHNICIAN: G. Green PAGE: 1 of 1 Percent Passin 60 Passing 1-3/4" Sieve 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Submitted by: Passing #4 Sieve 66 68 67 66 67 67 66 62 65 64 66 67 68 63 65 66 64 67 REED ENGINEERING GROUP, LTD. Original Signed By Bill Woolwine Sr. Manager, CMT BW/cn 2424 STUTZ DR . SUITE 400 . DALLAS. TX 75235 . TEL (214) 350 5600 . FAX (214) 350 0019 REED EnGinEERinG GEOTECHNICAL AND G R Cl U F' ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Belt Line Trade Center Building A 500 E. Belt Line Road Coppell,Texas REPORTED TO: 101 5420 LBj Freeway, Suite 1275 Dallas, Texas 75240 A TTN: Mr. Chris Parnell REPORT NO. 20 REPORT DATE: 06-16-06 REG PROJECT NO. 13335 TECHNICIAN: G. Green PAGE: 1 of 1 CONTRACTOR: Raymond Construction Proctor No. 1 2 3 4 5 ASTM Standard 0-698 0-698 D-698 0-698 0-698 Descri tion Dark red & gray clay Orange & gray sandy clay Tan & gray sandy clay Dark brown & gray clay Light brown & gray clay w/calcareous nodules Optimum Moisture, % 18.6 16.4 10.9 20.6 21.2 Depth Below Field Field Test Final S. G. Density Moisture Proctor Compaction No. Date Location (feet) (DCt) (%) 10 Level (%) 304 05-31-06 Storm Line A: ST A 5+50 1.0 112.4 12.3 3 96.2 305 Storm Line A: ST A 5+50 0.0 97.6 19.9 1 96.6 306 Storm Line A: STA 7+00 1.0 112.9 11.7 3 96.6 307 Storm Line A: STA 7+00 0.0 97.8 19.7 1 96.8 Comments: Where tested, materials were in compliance with project specifications. Mail Distribution: (1) IDI/Mr. Chris Parnell (1) Raymond Construction/ Mr. David Layne Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Bill Woolwine Sr. Manager, CMT BW /cn 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL (214) 3505600 . FAX (214) 3500019